Select the correct statement.
(A) Quantity of binder required for tack coat is less than that required for prime coat
(B) Prime coat treatment is given for plugging the voids in water bound macadam during
bituminous road construction
(C) Seal coat is the final coat over certain previous bituminous pavements
(D) A bitumen primer is a high viscosity cutback

1 Answer

Answer :

Answer: Option D

Related questions

Description : When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is (A) Seal coat (B) Tack coat (C) Prime coat (D) Spray of emulsion

Last Answer : Answer: Option B

Description : Pavement is said to be flexible if it contains (A) Water bound macadam surface (B) Stabilised soil base constructed of lime cement or tar (C) Bitumen-bound stone layer of varying aggregates (D) All the above

Last Answer : Answer: Option D

Description : Which of the following premix methods is used for base course? (A) Bituminous carpet (B) Mastic asphalt (C) Sheet asphalt (D) Bituminous bound macadam

Last Answer : Answer: Option D

Description : The aggregates required for one kilometre length of water bound macadam road per meter width and for 10 mm thickness is (A) 8 cubic meter (B) 10 cubic meter (C) 12 cubic meter (D) 15 cubic meter

Last Answer : Answer: Option C

Description : In the penetration macadam construction, the bitumen is (A) Sprayed after the aggregates are spread and compacted (B) Premixed with aggregates and then spread (C) Sprayed before the aggregates are spread and compacted (D) None of the above

Last Answer : Answer: Option A

Description : The binder normally used in flexible pavement construction is (A) Cement (B) Lime (C) Bitumen (D) None of the above

Last Answer : Answer: Option C

Description : For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is (A) Dry rolling, wet rolling, application of screening and application of ... of filler (D) Dry rolling, application of screening, application of filler and wet rolling

Last Answer : Answer: Option C

Description : Plastic bitumen is generally used for (A) Road pavements (B) Expansion joints (C) Crack fillings (D) None to these

Last Answer : Answer: Option C

Description : Which of the following is considered to be the highest quality construction in the group of black top pavements? (A) Mastic asphalt (B) Sheet asphalt (C) Bituminous carpet (D) Bituminous concrete

Last Answer : Answer: Option D

Description : Following type of pavement is generally known as flexible pavement (A) Water-bound macadam roads (B) Stabilised soil roads (C) Road constructed with various layers of building material well compacted (D) All the above

Last Answer : Answer: Option D

Description : The ductility value of bitumen for suitability in road construction should not be less than (A) 30 cm (B) 40 cm (C) 50 cm (D) 60 cm

Last Answer : Answer: Option C

Description : The camber of shoulders in water bound macadam roads is (A) Equal to the cross slope of pavement (B) Less than the cross slope of pavement (C) Greater than the cross slope of pavement (D) Zero

Last Answer : Answer: Option A

Description : Describe stepwise construction procedure for water bound macadam roads.

Last Answer : The construction procedure of W.B.M. road is discussed below: 1. Preparation of subgrade : The subgrade is prepared to the required grade and camber. 2. Preparation of the base course : After preparing ... by rolling or tamping. 5. Open to traffic : After drying, the road is opened to traffic.

Description : Rapid hardening cement is used (a) Where high early strength is desired (b) Where form work is to be removed as early as possible (c) For construction of road pavements. (d) All of the above

Last Answer : (d) All of the above

Description : The road foundation for modern highways construction, was developed by (A) Tresguet (B) Telford (C) Tresguet and Telford simultaneously (D) Telford and Macadam simultaneously

Last Answer : Answer: Option D

Description : In case of cement concrete pavements, pick up the incorrect statement (A) Tractive resistance is low (B) Initial cost of construction is high (C) Initial cost of construction is low (D) Visibility during nights is high

Last Answer : Answer: Option C

Description : Maximum daily traffic capacity of bituminous pavements is (A) 500 tonnes per day (B) 1000 tonnes per day (C) 1500 tonnes per day (D) 2000 tonnes per day

Last Answer : Answer: Option C

Description : Which of the following represents a carpet of sand-bitumen mix without coarse aggregates? (A) Mastic asphalt (B) Sheet asphalt (C) Bituminous carpet (D) Bituminous concrete

Last Answer : Answer: Option B

Description : The desirable camber for straight roads with water bound macadam or gravel surface, is (A) 1 in 33 to 1 in 25 (B) 1 in 40 to 1 in 33 (C) 1 in 150 to 1 in 140 (D) 1 in 160 to 1 in 140

Last Answer : Answer: Option B

Description : For Indian conditions, the water bound macadam roads, are suitable if daily traffic does not exceed (A) 2000 tonnes (B) 2500 tonnes (C) 3000 tonnes (D) 3500 tonnes

Last Answer : Answer: Option A

Description : In water bound macadam roads, binding material, is (A) Sand (B) Stone dust (C) Cement (D) Brick dust

Last Answer : Answer: Option B

Description : Which of the following is not a binder for coal briquetting? (A) Coal tar (B) Bitumen (C) Molasses (D) None of these

Last Answer : (D) None of these

Description : The statement, regarding the size of stones used at the wearing surface. "The size of a stone used on a road must be in due proportion to the space occupied by a wheel of ordinary dimensions on a smooth ... dimension is mischievous" was made by (A) Telford (B) Macadam (C) Tresguet (D) Sully

Last Answer : Answer: Option B

Description : Which of the following can be made into briquettes without the use of a binder? (A) Lignite (B) Bituminous coal (C) Anthracite coal (D) None of these

Last Answer : (A) Lignite

Description : Softening point of bitumen to be used for read construction at a place where maximum temperature is 40°C should be (A) Less than 40°C (B) Greater than 40°C (C) Equal to 40°C (D) None of the above

Last Answer : Answer: Option B

Description : Pick up the correct statement from the following: (A) Continuous grading is not necessary for obtaining a minimum of air voids (B) The omission of a certain size of aggregate is shown by ... in concrete increases the workability but also increases the liability to segregation (D) All the above

Last Answer : Answer: Option D

Description : Justify the remedial measures for following defects : (i) Formation of pot holes in case of WBM roads. (ii) Formation of ruts in case of earthen roads. (iii)Bitumen bleeding in case of bituminous roads.

Last Answer : The cross section of hill road is shown below: (i) Formation of pot holes in case of WBM roads : The pot holes should be patched up by. (1) Cutting the defective area to rectangular shape and ... spreading a layer of dry coarse sand in a thickness varying 5 mm to 10 mm and rolling the surface. 

Description : The inventor of road making as a building science, was (A) Sully (B) Tresguet (C) Telford (D) Macadam

Last Answer : Answer: Option A

Description : Explain the construction procedure of Bituminous Road.

Last Answer : The construction procedure of bituminous road is summarized as under:  1) Preparation of sub-grade - The existing ground is made clean to remove dust and other unwanted particles using ordinary and ... over thin layer of seal coat followed by necessary compaction as per camber and gradient of road.

Description : Penetration test on bitumen is used for determining its (A) Grade (B) Viscosity (C) Ductility (D) Temperature susceptibilit

Last Answer : Answer: Option A

Description : California Bearing Ratio method of designing flexible pavements is more accurate as it involves (A) Characteristics of soils (B) Traffic intensities (C) Character of the road making materials (D) None of these

Last Answer : Answer: Option C

Description : The width of road pavements, depends upon (A) Width of traffic lane (B) Number of traffic (C) Width of median strip (D) All the above

Last Answer : Answer: Option D

Description : Reinforcement in cement concrete slab of road pavements, is placed (A) Longitudinally (B) Transversely (C) Longitudinally and transversely (D) In the form of welded wire mesh

Last Answer : Answer: Option D

Description : For road pavements, the cement generally used, is (A) Ordinary Portland cement (B) Rapid hardening cement (C) Low heat cement (D) Blast furnace slag cement

Last Answer : Answer: Option B

Description : Expanded metal is (A) Manufactured from steel sheets (B) Used for reinforced concrete in road pavements (C) Measured in term of SWM (short way mesh) and LWM (long way mesh) (D) All the above

Last Answer : Answer: Option D

Description : For road pavements, the cement generally used, is [ A ] Ordinary Portland cement [ B ] Rapid hardening cement [ C ] Low heat cement [ D ] Blast furnace slag cement

Last Answer : [ A ] Ordinary Portland cement

Description : Bulking of sand is caused due to (A) Surface moisture (B) Air voids (C) Viscosity (D) Clay contents

Last Answer : Answer: Option A

Description : The maximum time lag between the primer coat and the Ist finishing coat shall not exceed a) 3 days b) 7 days* c) 4 days d) 12 days

Last Answer : b) 7 days*

Description : The maximum time lag between surface preparation and the application of primer coat shall not exceed a) 12 hours b) 24 hours* c) 48 hours d) 36 hours

Last Answer : b) 24 hours*

Description : In the method of voids for determination of the quantity of cement paste, it is assumed that (A) Voids in coarse aggregates are filled by fine aggregates (B) Voids in fine aggregates are filled by ... of fine aggregates is equal to total voids in coarse aggregates plus 10% extra (D) All the above

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) Tresguet did not provide the top camber for the drainage of surface water (B) Tresguet provided the top camber for the drainage of surface ... (D) Macadam provided a camber to the formation at the dug-up state, to drain percolated water

Last Answer : Answer: Option A

Description : A district road with a bituminous pavement has a horizontal curve of 1000 m for a design speed of 75 km ph. The super-elevation is (A) 1 in 40 (B) 1 in 50 (C) 1 in 60 (D) 1 in 70

Last Answer : Answer: Option A

Description : A prime coat is given to steel work with (A) An oxide of iron paint (B) A mixture of white lead and lead paint (C) A special paint (D) Cement paint

Last Answer : Answer: Option B

Description : __________ test is done to find out the softening point of bitumen. (A) Impact (B) Ball and ring (C) Flame (D) Viscosity

Last Answer : (B) Ball and ring

Description : Pick up the correct statement from the following: (A) In a gully trap, a water seal of 6 to 7.5 cm is provided (B) The gully trap collects waste water from the kitchen, sink, wash basins ... the sullage drain from the main drainage system (D) The grating provided over gully traps is 23 cm square

Last Answer : (B) The gully trap collects waste water from the kitchen, sink, wash basins, etc.

Description : Select the correct statement. (A) The greater the viscosity, the greater is permeability (B) The greater the unit weight, the greater is permeability (C) The greater the unit weight, the smaller is permeability (D) Unit weight does not affect permeability

Last Answer : Answer: Option B

Description : Pick up the correct statement from the following: (A) The void space between the soil grains, is filled partly with air and partly with water (B) In perfectly saturated soil, the voids are completely filled with water (C) In dry soil, the voids are completely filled with air (D) All the above

Last Answer : Answer: Option D

Description : Pick up the correct statement from the following: (A) The ratio of total volume of voids in soil aggregates to the total volume of aggregate, is called Porosity (B) Water retained by the interstices ... (C) Sum of the percentage of specific yield and specific retention is 100 (D) All the above

Last Answer : Answer: Option D

Description : Pick up the correct statement from the following: (A) The theory of formation of concrete is based on the phenomena of formation of voids (B) The bulking of sand is taken into account while ... sand and the sand completely flooded with water, have practically the same volume (D) All the above

Last Answer : Answer: Option D