In which state, Salal Hydro Power Project is located

1 Answer

Answer :

Jammu and Kashmir

Related questions

Description : Salal is the hydro power project in: (1) Haryana (2) Jammu and Kashmir (3) Himachal Pradesh (4) Punjab

Last Answer : (2) Jammu and Kashmir Explanation: Salal Hydroelectric Power Station is constructed on river Chenab in the state of Jammu & Kashmir. The project was conceived in 1920. The project is located near Reasi about 100 km from Jammu.

Description : Name the first hydro Power Project built in Jammu and Kashmir. a) Bhakra Dam b) Sardar Sarovar Dam c) Chandil Dam d) Salal Dam

Last Answer : d) Salal Dam

Description : Salal is the hydro power project in: (1) Haryana (2) Jammu and Kashmir (3) Himachal Pradesh (4) Punjab 

Last Answer : Haryana

Description : Match the following: [CPO SI 2002] Hydel Power Project Located in A. Koyna 1. Jammu and Kashmir B. Kundah 2. Karnataka C. Salal 3. Maharashtra D. Sharavathy 4. Tamil Nadu A B C D (a) 2 1 4 3 (b) 3 1 4 2 (c) 2 4 1 3 (d) 3 4 1 2

Last Answer : Ans: (d)

Description : In which state ,the Koyna Hydro-Power Project is located

Last Answer : Maharashtra

Description : Umium Hydro Power Project dam is located few kilometres north to which of the following

Last Answer : Shilong

Description : Umium Hydro Power Project dam is located few kilometres north to which of the following

Last Answer : Shilong

Description : In which state is the Salal dam located? (a) Uttarakhand (b) Himachal Pradesh (c) Jammu and Kashmir (d) Kerala

Last Answer : (c) Jammu and Kashmir

Description : A hydro power project on Lake Loktak is situated in which state

Last Answer : Manipur

Description : In which of the following states, Teesta Urja hydro-power project is proposed to be set up? (a) Sikkim (b) Andhra Pradesh (c) West Bengal (d) Arunachal Pradesh (e) Assam

Last Answer : Ans: (a)

Description : Nayveli Power Project is a _______ Power Project. (a) Hydro-electric (b) Nuclear (c) Thermal (d) Non-conventional

Last Answer : Ans: (c)

Description : Match the following: Place Power Project A. Kalpakkam 1. Thermal power project B. Kolkata 2. Nuclear power project In d ian Min er al s an d In d u st r ies C. Koyna 3. Tidal power project D. Bhavnagar 4. Hydro power project A B C D (a) 1 3 4 2 (b) 2 3 1 4 (c) 2 1 4 3 (d) 2 3 4 1

Last Answer : Ans: (c)

Description : Which neighbouring country has objections on Indian Baglihar Hydro-electric Project? -General Knowledge

Last Answer : answer:

Description : Which neighbouring country has objections on Indian Baglihar Hydro-electric Project? -General Knowledge

Last Answer : answer:

Description : The Sharavati Project is a/an (a) thermal project (b) hydro-electric project (c) multipurpose project (d) irrigation project

Last Answer : Ans: (b)

Description : Which neighbouring country has objections on Indian Baglihar Hydro-electric Project?

Last Answer : Pakistan

Description : how to get rid of salal

Last Answer : Need Answer

Description : picture of salal

Last Answer : Need Answer

Description : On which river the Salal Dam is built? -SST 10th

Last Answer : Chenab River.

Description : Which of the following is a wrong combination of location and hydroelectric projects undertaken by the NHPC? (a) Baira Siul-Himachal Pradesh (b) Salal-Jammu and Kashmir (c) Loktak-Sikkim (d) Devi Ghat-Nepal

Last Answer : Ans: (c)

Description : A concrete gravity dam built on Satluj river. a) Bhakra Dam b) Salal Dam c) Rana Pratap Sagar Dam d) Dantiwada Dam

Last Answer : a) Bhakra Dam

Description : On which river, Salal Dam is built? a) Krishna River b) Indus River c) Godavari d) Chenab

Last Answer : d) Chenab

Description : Identify the dam constructed across the Bhagirathi River. a) Hirakud Dam b) Bhakra Nangal Dam c) Tehri Dam d) Salal Dam

Last Answer : c) Tehri Dam

Description : Which one of the following combination of river and dams is not correct ? (a) Salal dam on Chenab river(b) Koyna on Krishna river (c) BhakraNangal on Satluj river (d) Tehri on Yamuna river.

Last Answer : (d) Tehri on Yamuna river.

Description : Name an important dam in Jammu and Kashmir and Odisha respectively. (a) Salal and Rihand (b) Hirakud and BhakraNangal (c) Salal and Hirakud (d) Hirakud and Tungabhadra.

Last Answer : (c) Salal and Hirakud

Description : Salal Dam is built on which river? (a) Chenab (b) Mahanadi (c) Krishna (d) Satluj

Last Answer : (a) Chenab

Description : State the function of following with respect to hydro power plant : I) Storage reservoir II) Surge tank II) Spillways IV) Trash rack

Last Answer : I) Storage reservoir: It is the basic requirement of hydroelectric plant. Its purpose is to store water which may be utilized to run the prime mover to produce electrical power. A reservoir stores during ... of nozzles of impulse turbines. It is made of steel bars and is placed across the intake.

Description : State any four factors for selection of hydro power plant site. 

Last Answer : Following Factors to be kept while site selecting for Hydro power plant: 1) Quantity of water available :-Where high rainfall occures so that sufficent quantity of water can be stored for generation of ... be possible to divert the stream. 11. Sand, gravel, etc., should be available nearby.

Description : Write the energy conversion that takes place in a hydro power plant. -Science

Last Answer : Potential /Kinetic/ Mechanical Energy into Electrical energy

Description : What is meant by 'energy crisis'? (a) Shortage of hydro-electricity (b) Malnutrition leading to short supply of energy in the human body (c) Shortage of the thermal power (d) Impending danger of total exhaustion of fossil fuels like coal and petroleum

Last Answer : Ans: (b)

Description : In Jaitapur, which one of the following power plants is being set up? [Haryana Gr Bank PO 2011] (1) Coal based (2) Hydro-electric (3) Gas based (4) Nuclear based (5) None of these

Last Answer : Ans: (4) 40. In which one of the following States, Mangla, Bhagyam and Aishwarya oil fields are located? [Haryana Gr Bank PO 2011] (1) Assam (2) Gujarat (3) A.P. (4) Orissa (5) Rajasthan

Description : The cost of fuel transportation is maxmimun in........ A.Hydro-electric power plant B.Steam power plant C.Nuclear power plant D.90% - 95%

Last Answer : Ans: B

Description : The topography of plateau is ideal for – (1) cultivation (2) forestry (3) mining (4) generation of hydro power

Last Answer : (4) generation of hydro power Explanation: The prospect of producing electricity from the hydrological resources of the Plateau region lies not, as has been suggested, in the 'region's ... topographical mechanism to subject the region's water resources to the energy-producing force of gravity.

Description : Which of the following sources has the largest share in power generation in India? (1) Atomic power (2) Thermal power (3) Hydro power (4) Wind power

Last Answer : (2) Thermal power Explanation: As per the Union Ministry of Power, thermal power (coal, gas and oil) accounts for 68.2% of power generated in India (as of 31.01.2017). India's ... from all renewable energy sources is nearly 15% of the total electricity generation (utility and captive) in India.

Description : Which kind of power accounts for the largest share of power generation in India? (1) hydro-electricity (2) thermal (3) nuclear (4) solar

Last Answer : (2) thermal Explanation: Thermal power is the largest source of power in India. There are different types of Thermal power plants based on the fuel used to generate the steam such ... and several other state level power generating companies are engaged in operating coal based Thermal Power Plants.

Description : Hydro-electric power is a: (1) non-renewable natural resource (2) a mixture of renewable and non-renewable natural resource (3) neither renewable nor non renewable resource (4) renewable natural resource

Last Answer : (4) renewable natural resource Explanation: Hydro-electric power is a renewable natural resource.

Description : What are the essential elements of hydro power plant?

Last Answer : 1. Catchment area 2. Reservoir 3. Dam 4. Surge tanks 5. Draft tubes 6. Power house 7. Switched for transmission of power

Description : List the types of hydro power plants based on availability of head

Last Answer : 1. High head power plant(head>100m) 2. Medium head power plant(30m-100m) 3. Low head power plants(head

Description : In which places, power is generated through hydro powe

Last Answer : Mettur

Description : Which hydro power projects is not in Tamil Nadu

Last Answer : Iddukki

Description : The contribution of hydro-power in India’ total power is almost

Last Answer : One-fifth

Description : Tehri hydro power complex is constructed on which of the following rivers

Last Answer : Bhagirathi

Description : Discuss the problems involved in 1. Hydro power generation 2. Thermal power generation 3. Solar power generation

Last Answer : 1. Hydro power generation This is traditional method of producing cheap electricity but involve some problems I. The people living in these areas where the dams to be constructed are shifted to some ... I. Very high installation cost II. Not applicable for night III. Number of batteries required

Description : The electric motor in a mild hybrid is acting as a a. Power booster b. Hydro boost c. Buffalo power booster d. Booster plug

Last Answer : a. Power booster

Description : The power generation potential in mini hydro power plant for a water flow of 3 m3 /sec with a head of 14 meters and with a system efficiency of 55% is a) 226.6 kW b) 76.4 kW c) 23.1 kW d) none of the above

Last Answer : a) 226.6 kW

Description : Identify the correct sequence of energy sources in order of their share in the power sector in India: (A) Thermal > nuclear > hydro > wind (B) Thermal > hydro > nuclear > wind (C) Hydro > nuclear > thermal > wind (D) Nuclear > hydro > wind > thermal

Last Answer : (B) Thermal > hydro > nuclear > wind

Description : Hydro-electric power is a: (1) non-renewable natural resource (2) a mixture of renewable and non-renewable natural resource (3) neither renewable nor non renewable resource (4) renewable natural resource

Last Answer : renewable natural resource

Description : The topography of plateau is ideal for (1) cultivation (2) forestry (3) mining (4) generation of hydro power

Last Answer : generation of hydro power

Description : Explain necessity of routine maintenance of micro hydro power plant. Write its procedure. 

Last Answer : Necessity - In order to operate micro-hydro power plants in good condition for a long period, waterway facilities, electric equipment, transmission and distribution lines should be maintained ... functions correctly. Inspection of intake area, impounding structures, pipeline, sluice(s).

Description : Write concept and principle used in micro hydro power plant.

Last Answer : Concept -  Hydropower plants capture the energy of falling water to generate electricity. A turbine converts the kinetic energy of falling water into mechanical energy. Then a generator ... water turbine. The turbine drives the generator and converts mechanical energy into electrical energy.