In preparing to take insulation resistance readings on a main generator, the windings should be grounded for about 15 minutes prior to the test to _____________. A. allow accurate zeroing of the meter B. help the windings to cool to ambient temperature C. release any residual capacitive charge from the windings D. help the windings to cool to the same temperature as the ground test connection