Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out? A. De-energize the applicable switchboard bus. B. Bypass the interlocks. C. Secure and tag the supply circuit breaker in the open position. D. Station a man at the circuit supply switch.

1 Answer

Answer :

Answer: C

Related questions

Description : Before working on an electric cargo winch master switch or controller, you should _____________. A. spray the gasket surface with a solvent B. drain condensate from the box C. open the circuit breaker in the power supply and tag D. heat the switch box to remove any moisture

Last Answer : Answer: C

Description : When an alternator is to remain idle for even a few days _________________. A. lift the brushes and disconnect the pigtails B. insulate the collector rings with strips of cardboard C. energize the heater circuit D. open the equalizing bus disconnect switch

Last Answer : Answer: C

Description : The purpose of the automatic bus transfer shown in the illustration is to ___________. EL-0014 A. stepdown voltage to the lighting distribution panel B. provide emergency power to ... emergency switchboard from the main switchboard D. provide overcurrent protection to the lighting distribution panel

Last Answer : Answer: B

Description : A circuit breaker and a fuse have a basic similarity in that they both _____________. A. can be reset to energize the circuit B. should open the circuit when overloaded C. will burn out when an over current flow develops D. all of the above

Last Answer : Answer: B

Description : A ground in an electrical circuit outside the engine room _____________. A. cannot be detected under normal conditions B. is of no consequence to engineering personnel C. is indicated at the branch circuit breaker panel D. is indicated by the ground detecting lamps on the main switchboard

Last Answer : Answer: D

Description : To remove an alternator operating in parallel with another unit from the main electrical bus, you must FIRST _________. A. adjust the power factor on both units B. set the desired voltage on ... C. open the circuit breaker on the outgoing alternator D. remove the load from the outgoing alternator

Last Answer : Answer: D

Description : When paralleling two AC generators, the frequency of the incoming machine immediately prior to closing its breaker should be ____________. A. controlled by placing the governor switch in the automatic ... regulator C. slightly greater than the bus frequency D. slightly less than the bus frequency

Last Answer : Answer: C

Description : In the illustration, when the energy saver switch is in the 'lo' position, the _________. EL-0043 A. mullion and frz flange heaters will not energize B. mullion heater and refrig light will ... energize D. range of the freezer temperature control is increased causing the cut-in temp to become warmer

Last Answer : Answer: A

Description : In the illustration, when the energy saver switch is in the 'lo' position _________. EL-0042 A. the mullion and frz flange heaters will not energize B. the mullion heater and refrig light will ... D. the range of the freezer temperature control is increased causing the cut-in temp to become warmer

Last Answer : Answer: A

Description : Which of the listed precautions should be taken when cleaning the internals of a motor with compressed air? A. Open the machine on both ends so as to allow the air and dust to escape. B. Be certain that the ... panel. C. Be certain that the air is clean and as dry as possible. D. All of the above.

Last Answer : Answer: D

Description : When troubleshooting a console circuit card which is suspected of being faulty, the first step would be to _____. A. pull the card and measure the value of all resistors B. check for the ... for burned components D. check for continuity of circuit board traces and then the gain of each transistor

Last Answer : Answer: C

Description : To properly use a hook-on-type volt/ammeter to check current flow, you must FIRST _____________. A. de-energize the circuit to allow connection of the instrument in series B. hook the jaws ... test leads to the appropriate terminals D. short the test leads and calibrate the instrument to zero

Last Answer : Answer: B

Description : When maintenance personnel are working on electrical equipment, all supply switches should be secured in the open position and tagged specifically by the _____________. A. watch engineer B. chief engineer or first assistant C. chief electrician D. person performing the repair

Last Answer : Answer: D

Description : A ground is indicated by the ground-detecting system on the main electrical switchboard. The FIRST step in locating the actual ground is to _____________. A. close all circuit breakers in ... ground detection system indicates normal C. change over generators D. check each circuit with a megohmmeter

Last Answer : Answer: B

Description : Undervoltage trips are frequently installed on switchboard circuit breakers to trip ____________. A. out generators in the event of severe arcing or sparking B. out generators when there is reversal of power ... , but continues to run D. out generators when there is low voltage in the main circuit

Last Answer : Answer: D

Description : When working on electrical circuits containing large capacitors, in addition to deenergizing the circuit, which of the listed precautions should also be taken? A. Keep all radio equipment ... capacitor insulation resistance. C. Ground the capacitor terminals. D. Check capacitor circuit polarity.

Last Answer : Answer: C

Description : Which of the following statements represents the FIRST precaution to be taken prior to working on any installed electrical component? A. Wear rubber gloves and boots. B. Use only approved nonconducting ... the machine before beginning any repairs. D. Open the supply circuits and tag the switches.

Last Answer : Answer: D

Description : Coast Guard Regulations (46 CFR) require each switchboard to have ___________. A. non-conductive deck covering at the frount B. non-conductive deck coverings at the rear C. a name plate for each circuit breaker D. all the above

Last Answer : Answer: D

Description : The purpose of a main switchboard circuit breaker's reverse-power trip is to _____________. A. prevent main circuit overload B. protect the circuit breaker blowout coil C. prevent alternator motorization D. prevent low voltage tripout

Last Answer : Answer: C

Description : The 24 volt DC bus on the emergency switchboard is used to supply power to the _____________. A. general alarm system B. gyrocompass power failure alarm system C. smoke detection system D. all of the above

Last Answer : Answer: D

Description : Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions? A. The generator and bus transfer section B. The 450 volt, 60 cycle, 3 phase bus C. The 120 volt, 3 phase, 60 cycle bus D. The 24 volt DC bus

Last Answer : Answer: D

Description : You are attempting to parallel two AC generators, and the synchroscope pointer is revolving fast in the clockwise direction. This indicates that the frequency of the incoming machine is _____________. A. higher ... at any pointer position D. the same as the bus frequency but out of phase with it

Last Answer : Answer: A

Description : You are attempting to parallel two AC generators and the synchroscope pointer stops at a position other than 0°. If you close the circuit breaker at this moment _____________. A. the incoming ... hazardous condition will be created by the incoming machine being at a higher frequency than the bus

Last Answer : Answer: C

Description : You are attempting to parallel two AC generators, and the synchroscope pointer is revolving in the fast direction. This indicates that the frequency of the incoming machine is _____________. A. higher ... the same as the bus frequency and the circuit breaker may be closed at any pointer position

Last Answer : Answer: A

Description : You are attempting to parallel two AC generators and the synchroscope pointer is revolving in the slow direction. This indicates that the frequency of the incoming machine is _____________. A. higher than ... same as the bus frequency, and the circuit breaker may be closed at any pointer position

Last Answer : Answer: B

Description : You are attempting to parallel two AC generators and the synchroscope pointer stops at a position other than 0° prior to closing the circuit breaker. This indicates ___________. A. the frequency of ... be closed after breaker has been reset D. there is an existing cross current between generators

Last Answer : Answer: A

Description : What are the interlocks between 415 V and 6.6 kV switch gear? 

Last Answer : 6.6 kV Breaker closed cannot rack in or out. Service lever cannot move while breaker closed. Breaker cannot be closed in in-between position. 415 V Breaker door cannot be opened when breaker is ... . Breaker cannot be closed in in-between position. Breaker closed cannot be rack in or out. 

Description : When troubleshooting electronic equipment, the FIRST step to be taken before testing the circuit voltage is to _________. A. set the meter to the lowest range B. check the voltage supply from the power source C. remove the suspected component D. check the current flow through the circuit

Last Answer : Answer: B

Description : Which of the following should be the FIRST step in removing a generator from parallel operation? A. Trip the generator off the switchboard. B. Turn off all electrical equipment. C. Remove the load from the 'off going' generator. D. Increase the cycles of the generator staying on the line.

Last Answer : Answer: C

Description : In an emergency, the fastest way to interrupt power and stop the winch shown in the illustration is for the ____________. EL-0102 A. mate to open the disconnect switch at 'L1' and 'L2' B. ... watch engineer to open the winch circuit breaker D. electrician to open the test link at the controller

Last Answer : Answer: B

Description : When securing an AC generator, you should FIRST ___________. A. open the generator circuit breaker B. switch the voltage regulator to 'manual' C. decrease the field excitation to minimum D. reduce the load on the unit

Last Answer : Answer: D

Description : What tool is used to de-energize capacitors in a circuit that has been disconnected from its power source?

Last Answer : Shorting probe.

Description : In accordance with Coast Guard Regulations (46 CFR), a steering gear feeder circuit from the emergency switchboard or alternate power supply must have the capacity for continuous operation of the rudder 15° side to side in not more than 60 seconds for a A. 1/4 hour B. 1/2 hour C. 1 hour D. 2 hours

Last Answer : Answer: B

Description : The electrical energy necessary to transmit a person's voice over a sound-powered telephone circuit is obtained from _____________. A. dry cell batteries B. the ship's service switchboard C. the emergency switchboard D. the speaker's voice

Last Answer : Answer: D

Description : Which of the listed precautions should be observed before spraying liquid solvent on the insulation of an electric motor? A. Slow the motor down to low speed. B. Disconnect the motor from the power source. C. Secure all ventilation in the area. D. Preheat the insulation to assist in cleaning.

Last Answer : Answer: B

Description : Before touching a small capacitor connected to a de-energized circuit, or even one that is completely disconnected, you should ____________. A. gently tap the body with a screwdriver B. tag it ... insulated fuse puller D. short circuit the terminals to make sure that the capacitor is discharged

Last Answer : Answer: D

Description : If a circuit breaker that utilizes built-in, current limiting fuses (CLF's) cannot be closed, the problem may be traced to __________. A. a blown CLF plunger holding the trip bar in the open position B. a missing CLF C. a misaligned limiter housing assembly D. all of the above

Last Answer : Answer: D

Description : The device labeled 'REG SW' in the illustration is used to ___________. EL-0003 A. shift from the automatic voltage regulator to the manual voltage regulator B. shift the governor control from manual to ... device 'REG ADJ' or device 'MAN ADJ' D. supply regulated control power to the switchboard

Last Answer : Answer: A

Description : Which of the following actions must be carried out prior to closing the alternator circuit breaker according to the graph shown in the illustration? EL-0002 A. Increase the alternator voltage. B. Decrease the line voltage. C. Increase the line voltage. D. Decrease the line frequency.

Last Answer : Answer: A