During open circuit test of a transformer?

1 Answer

Answer :

During open circuit test of a transformer primary is supplied rated voltage.

Related questions

Last Answer : Primary side is low voltage side and secondary side is high voltage side.

Description : Explain the open delta (delta-delta) test on transformer.

Description : Explain the procedure to perform Short Circuit test on single phase transformer with circuit diagram.

Last Answer : In short circuit test of transformer the low voltage side is short circuited . On high voltage side the voltmeter is connected in parallel and ammeter in series and also a wattmeter is ... circuit test is done for determining impedance and losses. In this test iron losses is neglected.

Description : An open-circuit test on a transformer is conducted primarily to measure?

Last Answer : The open-circuit test in a transformer is used to measure

Last Answer : Short circuit test on transformers is conducted to determine copper losses.

Description : A no-load test is performed on a transformer to determine?

Last Answer : A no-load test is performed on a transformer to determine magnetizing current and loss.

Description : Sumpner's test is conducted on transformer to determine?

Last Answer : Sumpner's test is conducted on transformer to determine temprature.

Description : Describe the difference between an open circuit and a short circuit.

Last Answer : Open circuit means the wire is cut meaning power will not flow and close circuit means wire is not cut and hence power will flow.Short circuit is the same as close circuit

Description : A d.c. source has an open circuit voltage of 30 V and an internal resistance of 1.5 Ohm. A resistive load is connected to the source. Maximum power dissipated in the load is (A) 300 W (B) 150 W (C) 45 W (D) 20 W

Last Answer : A d.c. source has an open circuit voltage of 30 V and an internal resistance of 1.5 Ohm. A resistive load is connected to the source. Maximum power dissipated in the load is 150 W

Last Answer : It is required to measure the true open circuit e.m.f. of a battery. The best device is D.C. potentiometer.

Description : Explain open emitter BJT drive circuit.

Last Answer : open emitter BJT drive circuit:

Description : Equivalent circuit of transformer

Last Answer : Equivalent Circuit Diagram of Transformer Referred to Primary: V1 -Primary Input voltage I1 - Input Current I0- Exciting current/ No load current Im- Magnetizing component ... equivalent of secondary terminal voltage ZL- Load impedance ZL ′- Primary equivalent of load impedance

Description : Polarity Test of Transformer

Last Answer : Polarity Test of Transformer

Description : If a 5-bus test system contains 6 transmission lines and one transformer, how many non-zero elements are there in the system Y-bus ? (A) 25 (B) 12 (C) 11 (D) 19

Last Answer : If a 5-bus test system contains 6 transmission lines and one transformer, 19 non-zero elements are there in the system Y-bus.

Description :  An AC supply of 230 V is applied to a half-wave rectifier circuit through a transformer having primary to secondary turn’s ratio 12:1. The peak inverse voltage is A) 8.62 V B) 12 V C) 19.17 V D) 27.11 V 

Last Answer :  An AC supply of 230 V is applied to a half-wave rectifier circuit through a transformer having primary to secondary turn’s ratio 12:1. The peak inverse voltage is A) 8.62 V B) 12 V C) 19.17 V D) 27.11 V 

Last Answer : The short circuit in any winding of the transformer is the result of impulse voltage.

Description : Why phasing out and polarity test is carried out on three phase transformer?

Last Answer : The phasing out test is carried out to identify the windings (primary and secondary) of corresponding phase of the three phase transformer. The polarity test is carried out to identify the ... identical polarity of the primary and secondary windings of each phase of the three phase transformer.

Description : When secondary of a current transformer is open-circuited its iron core will be?

Last Answer : When secondary of a current transformer is open-circuited its iron core will be hot because of heavy iron losses taking place in it due to high flux density.

Last Answer : Noise level test in a transformer is a type test.

Description : During short circuit test iron losses are negligible because?

Last Answer : During short circuit test iron losses are negligible because the voltage applied on primary side is low.

Description : How to Open a Tight Jar Lid

Last Answer : How to Open a Tight Jar Lid There are instances when you buy a stubborn jar of pickles (Learn how to pickle), peanut butter or mayonnaise that you can't open with your hands. It can drive you ... no time. If you enjoy reading this article, you might as well read how to can fruits and vegetables.

Description : How to Open a Can without a Can Opener

Last Answer : How to Open a Can without a Can Opener You're dying to sink your teeth into those canned peaches, but you find yourself without any can opener. At times like this, many people would easily give up ... you'll soon find yourself enjoying the yummy contents of the can. Be careful not to spill the food!

Description : Open-Face Shrimp Melt

Last Answer : Open-Face Shrimp Melt - serves 2 Preparation - 15 minutes 3 ounces shelled and deveined cooked small shrimp, cut lengthwise into halves 1/4 cup chopped celery 2 tbsp chopped scallion (green ... baking sheet arrange sandwiches and broil 6 inches from heat source until cheese melts, about 1 minute.

Description : What are the disadvantages of Open loop control system?

Last Answer : Open loop control system are less reliable. In open loop control system Optimization is not possible. Open loop control system are less accurate.

Description : Why CT is never operated with an open secondary ?

Last Answer : CT secondary should never be kept open because it will cause saturation of the core to a high level and very high voltage will appear across the secondary which can breakdown the insulation. One terminal of PT secondary is always grounded to avoid capacitive induction and for human safety

Description : What will happen to the gain margin if the gain of the open loop system is doubled? A) Doubled B) Becomes half C) Is not affected D) Becomes one-fourth 

Last Answer : What will happen to the gain margin if the gain of the open loop system is doubled? A) Doubled B) Becomes half C) Is not affected D) Becomes one-fourth 

Description : If the gain of the open loop system is doubled, the gain margin  (1) Is not affected (2) Gets doubled (3) Becomes half (4) Becomes one -forth

Last Answer : If the gain of the open loop system is doubled, the gain margin Becomes half

Description : An open resistor, when checked with an ohm-meter reads?

Last Answer : An open resistor, when checked with an ohm-meter reads infinite.

Last Answer : Open circuited armature coil of a D.C. machine is identified by the scarring of the commutator segment to which open circuited coil is connected and indicated by a spark completely around the commutator.

Last Answer : If the field winding of an unloaded salient pole synchronous motor is open circuited, the motor will stop.

Description : What is an example of an open loop system?

Last Answer : Open loop system. Ex. Electric heater, washing machine, fan, electric switch, etc

Description : What are the advantages of open loop control system?

Last Answer : Open loop control system are simple to design. Open loop control system are generally stable.

Description : what is open loop and close loop control system?

Last Answer : A) In open loop system the input is independent         of output but output is depends on input. A-1. no feedback path in open loop s/m    -2. less accuracy than close loop s/m. Ex. Washing ...    -3. high accuracy. Ex. Air conditioner ( AC ), rocket launcher, radar          system, etc

Description : The changes in the volume of transformer cooling oil due to the variation of atmospheric temperature during day and night is taken care of by which part of the transformer?

Last Answer : The changes in the volume of transformer cooling oil due to the variation of atmospheric temperature during day and night is taken care of by conservator.

Description : Why the open circuit test on a transformer is conducted at rated voltage?

Last Answer : A:The open circuit on a transformer is conducted at a rated voltage because core loss depends upon the voltage. This open circuit test gives only core loss or iron loss of the transformer.

Description : 49 The open circuit test is carried out in a transformer to find the A. Cu loss B. Core loss C. Total loss D. Insulation resistance

Last Answer : B. Core loss