Write the energy conversion that takes place in a hydro power plant. -Science

1 Answer

Answer :

Potential /Kinetic/ Mechanical Energy into Electrical energy

Related questions

Description : Explain necessity of routine maintenance of micro hydro power plant. Write its procedure. 

Last Answer : Necessity - In order to operate micro-hydro power plants in good condition for a long period, waterway facilities, electric equipment, transmission and distribution lines should be maintained ... functions correctly. Inspection of intake area, impounding structures, pipeline, sluice(s).

Description : Write concept and principle used in micro hydro power plant.

Last Answer : Concept -  Hydropower plants capture the energy of falling water to generate electricity. A turbine converts the kinetic energy of falling water into mechanical energy. Then a generator ... water turbine. The turbine drives the generator and converts mechanical energy into electrical energy.

Description : Write any two disadvantages of hydro power plant.

Last Answer : Disadvantages of hydro power plant: i) Due to high cost of civil engineering works, the capital cost per kW of hydro plants is considerably higher than that of steam plants. ii) Hydro ... ) Hydro plant reservoir submerges huge areas, uproots large population and creates social and other problems. 

Description : Match the following: Place Power Project A. Kalpakkam 1. Thermal power project B. Kolkata 2. Nuclear power project In d ian Min er al s an d In d u st r ies C. Koyna 3. Tidal power project D. Bhavnagar 4. Hydro power project A B C D (a) 1 3 4 2 (b) 2 3 1 4 (c) 2 1 4 3 (d) 2 3 4 1

Last Answer : Ans: (c)

Description : The cost of fuel transportation is maxmimun in........ A.Hydro-electric power plant B.Steam power plant C.Nuclear power plant D.90% - 95%

Last Answer : Ans: B

Description : What are the essential elements of hydro power plant?

Last Answer : 1. Catchment area 2. Reservoir 3. Dam 4. Surge tanks 5. Draft tubes 6. Power house 7. Switched for transmission of power

Description : The power generation potential in mini hydro power plant for a water flow of 3 m3 /sec with a head of 14 meters and with a system efficiency of 55% is a) 226.6 kW b) 76.4 kW c) 23.1 kW d) none of the above

Last Answer : a) 226.6 kW

Description : With a neat diagram explain pumped storage hydro power plant. 

Last Answer : Diagram of pumped storage hydro power plant: Explanation: In this power plant, generator is so designed that it Converts mechanical power into electrical power and also works as a ... helps in reducing a reserve capacity of PP as it provides additional power during peak load period. 

Description : List the types of turbine used in hydro power plant.  

Last Answer : Following types of turbine used in hydro power plant:  1.Pelton wheel 2.Francis Turbine 3.Kaplan Turbine 4.Propeller Turbine 

Description : State the function of following with respect to hydro power plant : I) Storage reservoir II) Surge tank II) Spillways IV) Trash rack

Last Answer : I) Storage reservoir: It is the basic requirement of hydroelectric plant. Its purpose is to store water which may be utilized to run the prime mover to produce electrical power. A reservoir stores during ... of nozzles of impulse turbines. It is made of steel bars and is placed across the intake.

Description : State any four factors for selection of hydro power plant site. 

Last Answer : Following Factors to be kept while site selecting for Hydro power plant: 1) Quantity of water available :-Where high rainfall occures so that sufficent quantity of water can be stored for generation of ... be possible to divert the stream. 11. Sand, gravel, etc., should be available nearby.

Last Answer : The potential energy of water is coverted into kinetic energy by flowing it from height and with the help of k.e. Turbines are rotate at particular speed it means the k.e. Of water is again ... simply define the hydro power plant as it give the conversion of P.E OF water into electrical energy

Description : The conversion of carotenoids to Vitamin A takes place in (A) Intestine (B) Liver (C) Kidney (D) Skin

Last Answer : Answer : A

Description : What is meant by 'energy crisis'? (a) Shortage of hydro-electricity (b) Malnutrition leading to short supply of energy in the human body (c) Shortage of the thermal power (d) Impending danger of total exhaustion of fossil fuels like coal and petroleum

Last Answer : Ans: (b)

Description : Identify the correct sequence of energy sources in order of their share in the power sector in India: (A) Thermal > nuclear > hydro > wind (B) Thermal > hydro > nuclear > wind (C) Hydro > nuclear > thermal > wind (D) Nuclear > hydro > wind > thermal

Last Answer : (B) Thermal > hydro > nuclear > wind

Description : What is ‘Talcher' important for? (1) Heavy water plant (2) Hydro-electricity generation (3) Cable industry (4) Atomic reactor

Last Answer : (1) Heavy water plant Explanation: Talcher, located in Angul district of Odisha, is famous for Heavy Water Plant. This plant is a Government of India organisation under the aegis of Ministry of ... etc. and other allied chemicals required as a part of the nuclear power programme of the country.

Description : What is ‘Talcher’ important for? (1) Heavy water plant (2) Hydro–electricity generation (3) Cable industry (4) Atomic reactor

Last Answer : Heavy water plant

Description : Describe construction and working of high head micro hydro plant.

Last Answer : Construction of hydroelectric power plant Dam and Reservoir: The dam is constructed on a large river in hilly areas to ensure sufficient water storage at height. The dam forms a large ... are all set to transfer this high voltage electricity to nearest power grid through transmission lines. 

Description : Hydro electric plant

Last Answer : Hydro electric plant : In Hydro electric power plants the energy of water is utilized to move the hydraulic turbines which in turn runs an electric generator to convert the mechanical energy ... potential energy of water is converted into mechanical work and ultimately into electrical energy

Description : Which of the following components is not a part of hydro-electric plant ? (a) Penstock (b) Spillway (c) Surge tank (d) Economiser 

Last Answer : Economiser

Description : In India the most important source of energy is (a) Petroleum (b) Coal (c) Nuclear (d) Hydro-electricity

Last Answer : Ans: (b)

Description : What is the source of natural energy of the hot springs at Manikaran in Himachal Pradesh? (1) Geothermal Energy (2) Biomass Energy (3) Thermal Energy (4) Hydro Energy

Last Answer : (1) Geothermal Energy Explanation: Manikaran is famous for hot springs that are produced by the emergence of geothermally heated groundwater that rises from the Earth's crust. The water from hot ... is heated in this manner. An experimental geothermal energy plant has also been set up here.

Description : Total primary energy consumption of fuel in the world is lead by a) Coal b) Nuclear c) Hydro d) Oil

Last Answer : coal

Description : 71. Total primary energy consumption of fuel in the world is lead by a) Coal b) Nuclear c) Hydro d) Oil

Last Answer : coal

Description : In which of the following states, Teesta Urja hydro-power project is proposed to be set up? (a) Sikkim (b) Andhra Pradesh (c) West Bengal (d) Arunachal Pradesh (e) Assam

Last Answer : Ans: (a)

Description : Nayveli Power Project is a _______ Power Project. (a) Hydro-electric (b) Nuclear (c) Thermal (d) Non-conventional

Last Answer : Ans: (c)

Description : In Jaitapur, which one of the following power plants is being set up? [Haryana Gr Bank PO 2011] (1) Coal based (2) Hydro-electric (3) Gas based (4) Nuclear based (5) None of these

Last Answer : Ans: (4) 40. In which one of the following States, Mangla, Bhagyam and Aishwarya oil fields are located? [Haryana Gr Bank PO 2011] (1) Assam (2) Gujarat (3) A.P. (4) Orissa (5) Rajasthan

Description : The topography of plateau is ideal for – (1) cultivation (2) forestry (3) mining (4) generation of hydro power

Last Answer : (4) generation of hydro power Explanation: The prospect of producing electricity from the hydrological resources of the Plateau region lies not, as has been suggested, in the 'region's ... topographical mechanism to subject the region's water resources to the energy-producing force of gravity.

Description : Salal is the hydro power project in: (1) Haryana (2) Jammu and Kashmir (3) Himachal Pradesh (4) Punjab

Last Answer : (2) Jammu and Kashmir Explanation: Salal Hydroelectric Power Station is constructed on river Chenab in the state of Jammu & Kashmir. The project was conceived in 1920. The project is located near Reasi about 100 km from Jammu.

Description : Which of the following sources has the largest share in power generation in India? (1) Atomic power (2) Thermal power (3) Hydro power (4) Wind power

Last Answer : (2) Thermal power Explanation: As per the Union Ministry of Power, thermal power (coal, gas and oil) accounts for 68.2% of power generated in India (as of 31.01.2017). India's ... from all renewable energy sources is nearly 15% of the total electricity generation (utility and captive) in India.

Description : Which kind of power accounts for the largest share of power generation in India? (1) hydro-electricity (2) thermal (3) nuclear (4) solar

Last Answer : (2) thermal Explanation: Thermal power is the largest source of power in India. There are different types of Thermal power plants based on the fuel used to generate the steam such ... and several other state level power generating companies are engaged in operating coal based Thermal Power Plants.

Description : Hydro-electric power is a: (1) non-renewable natural resource (2) a mixture of renewable and non-renewable natural resource (3) neither renewable nor non renewable resource (4) renewable natural resource

Last Answer : (4) renewable natural resource Explanation: Hydro-electric power is a renewable natural resource.

Description : List the types of hydro power plants based on availability of head

Last Answer : 1. High head power plant(head>100m) 2. Medium head power plant(30m-100m) 3. Low head power plants(head

Description : Umium Hydro Power Project dam is located few kilometres north to which of the following

Last Answer : Shilong

Description : In which state, Salal Hydro Power Project is located

Last Answer : Jammu and Kashmir

Description : In which places, power is generated through hydro powe

Last Answer : Mettur

Description : Which hydro power projects is not in Tamil Nadu

Last Answer : Iddukki

Description : In which state ,the Koyna Hydro-Power Project is located

Last Answer : Maharashtra

Description : The contribution of hydro-power in India’ total power is almost

Last Answer : One-fifth

Description : Tehri hydro power complex is constructed on which of the following rivers

Last Answer : Bhagirathi

Description : A hydro power project on Lake Loktak is situated in which state

Last Answer : Manipur

Description : Name the first hydro Power Project built in Jammu and Kashmir. a) Bhakra Dam b) Sardar Sarovar Dam c) Chandil Dam d) Salal Dam

Last Answer : d) Salal Dam

Description : Discuss the problems involved in 1. Hydro power generation 2. Thermal power generation 3. Solar power generation

Last Answer : 1. Hydro power generation This is traditional method of producing cheap electricity but involve some problems I. The people living in these areas where the dams to be constructed are shifted to some ... I. Very high installation cost II. Not applicable for night III. Number of batteries required

Description : Umium Hydro Power Project dam is located few kilometres north to which of the following

Last Answer : Shilong

Description : The electric motor in a mild hybrid is acting as a a. Power booster b. Hydro boost c. Buffalo power booster d. Booster plug

Last Answer : a. Power booster

Description : Hydro-electric power is a: (1) non-renewable natural resource (2) a mixture of renewable and non-renewable natural resource (3) neither renewable nor non renewable resource (4) renewable natural resource

Last Answer : renewable natural resource

Description : Salal is the hydro power project in: (1) Haryana (2) Jammu and Kashmir (3) Himachal Pradesh (4) Punjab 

Last Answer : Haryana

Description : The topography of plateau is ideal for (1) cultivation (2) forestry (3) mining (4) generation of hydro power

Last Answer : generation of hydro power

Description : List any two types of micro-hydro power plants. 

Last Answer : A) base on use - Conventional plants Pumped storage plants Run-of-river plants. B) based on size - Large hydro power plants (capacity more than 100MW) Medium hydro power plants (capacity 15 ... Micro hydro power plants (capacity 5KW to 100KW) Pico hydro power plants (capacity less than 5 KW)

Description : Compare the Nuclear power station with Hydro power station. 

Last Answer : SR. No.  Points Nuclear Power plant  Hydro Power station  1 Site/ Location Where there is ample supply of water is available, away from thickly populated areas to avoid radioactive ... Field Application As base load  Used as base load during as well as peak load