Features to be tested, approach, item pass/fail criteria and test deliverables should be specified
in which document?
a) Test case specification
b) Test procedure specification
c) Test plan
d) Test design specification

1 Answer

Answer :

c) Test plan

Related questions

Description : Deliverables of test design phase include all the following except A. Test data B. Test data plan C. Test summary report D. Test procedure plan

Last Answer : C. Test summary report

Description : Which of the following is not decided in the test-planning phase? A. Schedules and deliverables B. Hardware and software C. Entry and exit criteria D. Types of test cases

Last Answer : D. Types of test cases

Description : Decision to stop testing should be based upon A. Successful use of specific test case design methodologies B. A percentage of coverage for each coverage category C. Rate of error detection falls below a specified threshold D. All of the above

Last Answer : D. All of the above

Description : Evaluating testability of the requirements and system are a part of which phase:- a) Test Analysis and Design b) Test Planning and control c) Test Implementation and execution d) Evaluating ... text box which accepts alphabets in lower or upper case. Identify the invalid Equivalence class value.

Last Answer : a) Test Analysis and Design

Description : _________must be developed to describe when and how testing will occur. A. Test Strategy B. Test Plan C. Test Design D. High Level document

Last Answer : B. Test Plan

Description : What is NOT a test log? A. Maps the test results to requirements B. Records test activities C. Maintains control over the test D. Contains pass or fail results.

Last Answer : A. Maps the test results to requirements

Description : A test harness is a A. A high level document describing the principles, approach and major objectives of the organization regarding testing B. A distance set of test activities collected into a manageable phase ... conduct a test D. A set of several test cases for a component or system under test

Last Answer : C. A test environment comprised of stubs and drives needed to conduct a test

Description : Which of the following is a part of Test Closure Activities? i. Checking which planned deliverables have been delivered ii. Defect report analysis. iii. Finalizing and archiving testware. iv. Analyzing lessons. a) i , ii , ... false c) i , iii , iv are true and ii is false d) All of above are true

Last Answer : c) i , iii , iv are true and ii is false

Description : Test Procedure A. Collection of test plans B. Combination of test plan and test cases C. Collection of test cases D. None of the above

Last Answer : C. Collection of test cases

Description : Which document helps you to track test coverage? A. Traceability Matrix B. Test plan C. Test log

Last Answer : A. Traceability Matrix

Description : We use the output of the requirement analysis, the requirement specification as the input for writing :- a) User Acceptance Test Cases b) Integration Level Test Cases c) Unit Level Test Cases d) Program specifications

Last Answer : a) User Acceptance Test Cases

Description : Test cases are designed during: a) test recording. b) test planning. c) test configuration. d) test specification.

Last Answer : d) test specification.

Description : Exit Criteria may consist of :- i. Thoroughness measures , such as coverage of code, functionality or risk ii. Estimates of Defect density or reliability measures. iii. Residual risk such as defects not fixed or ... correct and i,ii,iii are incorrect d) iii and iv are correct and i,ii are incorrect

Last Answer : b) i,ii,iii is correct and iv is incorrect

Description : Which of the following is not phase of the Fundamental Test Process? a) Test Planning and Control b) Test implementation and Execution c) Requirement Analysis d) Evaluating Exit criteria and reporting

Last Answer : c) Requirement Analysis

Description : Impact Analysis helps to decide :- a) How much regression testing should be done. b) Exit Criteria c) How many more test cases need to written. d) Different Tools to perform Regression Testing

Last Answer : a) How much regression testing should be done.

Description : What are the four attributes to be present in any test problem?A. Statement, criteria, effect and cause B. Priority, fix, schedule and report C. Statement, fix effect and report D. None of the above.

Last Answer : A. Statement, criteria, effect and cause

Description : Given the following specification, which of the following values for age are in the SAME equivalence partition? If you are less than 18, you are too young to be insured. Between 18 and 30 inclusive, you will receive a 20% discount. Anyone ... 17, 18, 19. B. 29, 30, 31. C. 18, 29, 30. D. 17, 29, 31.

Last Answer : C. 18, 29, 30.

Description : Test data planning essentially includes A. Network B. Operational Model C. Boundary value analysis D. Test Procedure Planning

Last Answer : C. Boundary value analysis

Description : Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or ... software component: a) Re Testing b) Confirmation Testing c) Regression Testing d) Negative Testing

Last Answer : c) Regression Testing

Description : Functional system testing is: a) testing that the system functions with other systems b) testing that the components that comprise the system function together c) testing the end to end functionality of the system as a whole d) testing the system performs functions within specified response times

Last Answer : c) testing the end to end functionality of the system as a whole

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester or developer IV. Dependencies of the change request.

Last Answer : A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester ... and IV B. I, II and III C. II, III and IV D. I, II and IV

Last Answer : D. I, II and IV

Description : In preparation for developing the acceptance criteria, the user should A. Know the defects in the application B. Acquire the basic knowledge of the application for which the system is ... D. Know new enhancement and basic understanding of how the application is implemented in users organization

Last Answer : Understand the risks and benefits of the development methodology that is to be used in correcting the software system

Description : Test Conditions are derived from :- a) Specifications b) Test Cases c) Test Data d) Test Design

Last Answer : a) Specifications

Description : Test design mainly emphasizes all the following except A. Data planning B. Test procedures planning C. Mapping the data and test cases D. Data synchronization

Last Answer : D. Data synchronization

Description : A test plan defines A. What is selected for testing B. Objectives and results C. Expected results D. Targets and misses

Last Answer : B. Objectives and results

Description : Test Plan A. Road map for testing B. Tells about the actual results and expected results C. Both A and B D. None of the above

Last Answer : A. Road map for testing

Description : Testing Process comprised of A. Test Plan and Test Cases B. Test log and Test Status C. Defect Tracking D. All of the above

Last Answer : D. All of the above

Description : Item transmittal report is also known as A. Incident report B. Release note C. Review report D. Audit report

Last Answer : B. Release note

Description : Use of an executable model to represent the behavior of an object is called A. Simulation B. Software item C. Software feature D. None of the above

Last Answer : A. Simulation

Description : In case of Large Systems :- a) Only few tests should be run b) Testing should be on the basis of Risk c) Only Good Test Cases should be executed. d) Test Cases written by good test engineers should be executed.

Last Answer : b) Testing should be on the basis of Risk

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed ... of these is a valid Boundary Value Analysis test case? A. £28000. B. £33501. C. £32001. D. £1500

Last Answer : B. £33501.

Description : Find the Equivalence class for the following test case Enter a number to test the validity of being accepting the numbers between 1 and 99 A. All numbers < 1 B. All numbers > 99 C. Number = 0 D. All numbers between 1 and 99

Last Answer : D. All numbers between 1 and 99

Description : Find the invalid equivalence class for the following test case Draw a line up to the length of 4 inches A. Line with 1 dot-width B. Curve C. Line with 4 inches D. None of the above

Last Answer : B. Curve

Description : Which of the following is not a type of incremental testing approach? a) Top down b) Big-bang c) Bottom up d) Functional incrementation.

Last Answer : b) Big-bang

Description : Big bang approach is related to A. Regression testing B. Inter system testingC. Re-testing D. Integration testing

Last Answer : D. Integration testing

Description : The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to A. Find bugs in the program B. Check the technical accuracy of the document

Last Answer : B. Check the technical accuracy of the document

Description : a tester, what is your main objective in reviewing a requirement document? A. To ascertain that each requirement is traceable to a business need B. To ascertain that each ... business need, testable, and uniquely identifiable D. To ascertain that each requirement is uniquely identifiable

Last Answer : C. To ascertain that each requirement is traceable to a business need, testable, and uniquely identifiable

Description : As a tester, what is your main objective in reviewing a requirement document? A. To ascertain that each requirement is traceable to a business need B. To ascertain that each ... business need, testable, and uniquely identifiable D. To ascertain that each requirement is uniquely identifiable

Last Answer : B. Test objective

Description : Which one of the following statements is true? a. Independent reviews and quality audits form part of quality assurance to ensure the project manager delivers on time and to budget. ... Quality planning enables the project manager to manage the trade-off between customer expectations  and budget

Last Answer : c. Quality control verifies that the project deliverables conform to specification, are fit for purpose and  meet stakeholder expectations.

Description : Which one of the following statements is true?  a. Independent reviews and quality audits form part of quality assurance to ensure the project  manager delivers on time and to budget. ... planning enables the project manager to manage the trade-off between customer  expectations and budget.

Last Answer : c. Quality control verifies that the project deliverables conform to specification, are fit for  purpose and meet stakeholder expectations.

Description : Match every stage of the software Development Life cycle with the Testing Life cycle: i. Hi-level design a Unit tests ii. Code b Acceptance tests iii. Low-level design c System tests iv. Business requirements d Integration tests a) i-d , ii ... i-b , ii-a , iii-d , iv-c d) i-c , ii-a , iii-d , iv-b

Last Answer : d) i-c , ii-a , iii-d , iv-b

Description : Which of the following functions is typically supported by a software quality information system? I. Record keeping II. System design III. Evaluation scheduling IV. Error reporting A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV

Last Answer : C.I, III &IV

Description : Software testing activities should start A. As soon as the code is written B. During the design stage C. When the requirements have been formally documented D. As soon as possible in the development lifecycle

Last Answer : C. When the requirements have been formally documented

Description : The purpose of software testing is to A. Demonstrate that the application works properly B. Detect the defects C. Validate the logical design

Last Answer : A. Demonstrate that the application works properly

Description : Defects are least costly to correct at what stage of the development cycle? A. Requirements B. Analysis & Design C. Construction D. Implementation

Last Answer : A. Requirements