When a record is made of an actual measured quality characteristic, such as a dimension 

expressed with thousands of an inch, the quality is said to be expressed by:

1. traits 

2. variables 

3. attributes 

4. properties

1 Answer

Answer :

2. variables

Related questions

Description : The Three attributes of project risk are _________, ___________ and ___________. 1. What might happen, who it happens to, and how much will it cost  2. Notification, frequency of relevant events, ... planning, total number of risk events 5. Risk event, probability occurrence, the amount at stake

Last Answer : 5. Risk event, probability occurrence, the amount at stake

Description : . An independent relationship must exist between the attribute that can be measured and the external quality attribute. a) True b) False

Last Answer : b) False

Description : An independent relationship must exist between the attribute that can be measured and the external  quality attribute. a) True b) False

Last Answer : b) False

Description : An independent relationship must exist between the attribute that can be  measured and the external quality attribute. (A) True (B)False

Last Answer : (B)False

Description : Measured quality of a manufactured product is : 1. Always constant  2. Continually decreasing  3. Subject to a certain amount of variation  4. Continually increasing

Last Answer : 3. Subject to a certain amount of variation

Description : Which of the following is not a characteristic of a marketing objective? A)Consistent with both business -unit and corporate strategy B)Expressed in clear, simple terms C)Written ... accurately D)Specifies a time frame for its accomplishment E)Detailed enough for marketing strategy implementation

Last Answer : E)Detailed enough for marketing strategy implementation

Description : The output quality of a printer is measured by A) Dot per inch B) Dot per sq. inch C) Dots printed per unit time D) All of above

Last Answer : Answer : B

Description : The output quality of a printer is measured by A) Dot per sq. inch B) Dot per inch C) Dots printed per unit time D) All of the above

Last Answer : Answer : B

Description : Printer resolution is a numerical measure of print quality that is measured in _______ A. Pages Per Minute (PPM) B. Lines Per Minute (LPM) C. Characters Per Second (CPS) D. Dots Per Inch (DPI)

Last Answer : D. Dots Per Inch (DPI)

Description : The output quality of a printer is measured by a. Dot per inch b. Dot per sq. inch c. Dots printed per unit time d. All of above

Last Answer : b. Dot per sq. inch

Description : The output quality of a printer is measured by a. Dot per inch b. Dot per sq. inch c. Dots printed per unit time d. All of above

Last Answer : b. Dot per sq. inch

Description : The planning and scoping should be such that the project manager can assess every  stage of the project and the quality of the deliverable of the project at every stage. (True/False)

Last Answer : Ans. True

Description : According to a statistical report: over 30% of all projects are cancelled before completion and over 70% of the remainder fail to deliver expected features . What must be the reason for such ... change management b) Poor requirements management c) Poor quality control d) All of the mentioned

Last Answer : b) Poor requirements management

Description : Which one of the following statements best defines an estimate? a. An approximation of project time and cost targets, refined throughout the project life cycle. b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life cycle.

Description : Which one of the following statements best defines an estimate?  a. An approximation of project time and cost targets, refined throughout the project life  cycle.  b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms.

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life  cycle.

Description : The tracking error of an optimized portfolio can be expressed in terms of the  of the portfolio and thus reveal . A. return; portfolio performance B. total risk; portfolio performance C. beta; portfolio performance D. beta; benchmark risk E. relative return; benchmark risk

Last Answer : D. beta; benchmark risk

Description : What are the best features, traits, or attributes about liberalism and conservatism?

Last Answer : Most likely it will be a conservative who would say “It’s still a person in there in the womb, no matter how small she /he is.” Most likely it would be a liberal who would be against capital punishment.

Description : Pie chart is generally used to represent ---- (a) variables (b) attributes

Last Answer : (b) attributes

Description : . If the Earned Value is equal to Actual Cost, it means: A. Project is on budget and on schedule B. Schedule Variance Index is 1 C. There is no schedule variance D. There is no cost variance

Last Answer : D. There is no cost variance

Description : An Expected Monetary Value (EMV) of $100000 on a potential project event in the  project means which of the following? Select one: a. A number that can be ignored b. An opportunity that ... Actual investment returns on the event e. A threat that must be considered to minimize the project risk

Last Answer : b. An opportunity that must be explored

Description : The budgeted cost for all the activities in a project with the help of Earned Value  Method is  A. Actual Cost  B. Budget at completion  C. Budget for completion  D. Estimate at completion

Last Answer : D. Estimate at completion

Description :  A project with total budget cost of 30 crores is scheduled to be completed in 80 weeks. A periodic review was carried out at end of 60 weeks and results are as given:  Budgeted cost of work performed (EV) = 17 ... crores What is the cost performance index?  A.0.895  B.0.81  C.0.90  D.1.12

Last Answer : A.0.895

Description : Which of the following represents the estimated value of the work actually  accomplished?  A. Earned value (EV)  B. Planned value (PV)  C. Actual cost (AC  D. Cost variance (CV)

Last Answer : A. Earned value (EV)

Description : . When estimating project time schedules using industry standards, the estimated  project completion time for a systems project would be _____ person-months if the actual  planning phase were completed in 6 person-months.  a. 30  b. 40  c. 17.14  d. 9  e. 50

Last Answer : b. 40

Description : The three steps of project management are _____. a. controlling the project, directing the project, and creating the work plan  b. creating the work plan, staffing the project, and controlling ... the deliverables  e. setting the start date, estimating the time, and reading the actual time

Last Answer : b. creating the work plan, staffing the project, and controlling and directing the  project

Description : . If the Earned Value is equal to Actual Cost, it means: A. Project is on budget and on schedule B. Schedule Variance Index is 1 C. There is no schedule variance D. There is no cost variance

Last Answer : D. There is no cost variance

Description : If the Earned Value is equal to Actual Cost, it means: A. Project is on budget and on schedule B. Schedule Variance Index is 1 C. There is no schedule variance D. There is no cost variance

Last Answer : D. There is no cost variance

Description : Cost budgeting can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on an on- going basis

Last Answer : 3. The process of establishing budgets, standards, and a monitoring system by which the  investment cost of the project can be measured and managed

Description : Relationship based on unrelated level of activity and past data of cost is measured with help of A. cost estimation B. price estimation C. unit estimation D. production estimation

Last Answer : A. cost estimation

Description : Total risk for common stocks is: A. the sum of systematic risk and diversifiable risk. B. measured by beta. C. the sum of market risk and systematic risk. D. the sum of diversifiable risk and unsystematic risk

Last Answer : A. the sum of systematic risk and diversifiable risk.

Description : Which of the following is a personal characteristic that reflects the  truthfulness of an individual that can be checked against observable facts? Select one: a. Objective credibility b. Attribution ... c. Non-manipulative trust d. High cost of lying e. Acknowledgment of munificence

Last Answer : a. Objective credibility

Description : Which of the following has the greatest effect on product's reliability and maintenance  characteristic? 1. conceptualization  2. product design  3. fabrication  4. a and b

Last Answer : 4. a and b

Description : Creating a work plan requires three steps: identify the tasks that need to be  accomplished, estimate the time that it will take to complete the tasks, and record the task  completion time in a Gantt Chart.

Last Answer : Ans: False

Description : Ryan, a newly hired systems analyst/consultant, is about to begin a systems project.  Where will Ryan look first to locate the identifiable tasks he will record in his work plan?  a. ... . the project planning software available at the local bookstore  e. the website of his old college professor

Last Answer : c. the company training materials for the company methodology

Description : A pleiotropic gene (a) controls a trait only in combination with another gene (b) controls multiple traits in an individual (c) is expressed only in primitive plants (d) is a gene evolved during Pliocene.

Last Answer : (a) controls a trait only in combination with another gene

Description : For a non-spherical particle, the sphericity (A) Is defined as the ratio of surface area of a sphere having the same volume as the particle to the actual surface area of the particle (B) Has ... of volume of a sphere having the same surface area as the particle to the actual volume of the particle

Last Answer : (A) Is defined as the ratio of surface area of a sphere having the same volume as the particle to the actual surface area of the particle

Description : The ratio of the actual mesh dimension of Taylor series to that of the next smaller screen is (A) 2 (B) √2 (C) 1.5 (D) √3

Last Answer : (B) √2

Description : Cable attenuation is usually expressed in terms of a. Loss per foot b. dB/km c. intensity per mile d. voltage drop per inch

Last Answer : b. dB/km

Description : Cable attenuation is usually expressed in terms of ∙ A. loss per foot ∙ B. dB/km ∙ C. intensity per mile ∙ D. voltage drop per inch

Last Answer : . dB/km

Description : Cable attenuation is usually expressed in terms of ∙ a. Loss per foot ∙ b. dB/km ∙ c. intensity per mile ∙ d. voltage drop per inch

Last Answer : ∙ b. dB/km

Description : The variable, which is expressed in terms of other variables, is called_____of a formula.

Last Answer : The variable, which is expressed in terms of other variables, is called_____of a formula.

Description : All the constraints are expressed as equations and the right hand side of each constraint and all variables are non-negative is called_______ a. Canonical variable b. Canonical form c. Canonical solution d. Both a & b

Last Answer : b. Canonical form

Description : Which of the following variables cannot be expressed in quantitative terms? (A) Socio-economic Status (B) Marital Status (C) Numerical Aptitude (D) Professional Attitude

Last Answer : (D) Professional Attitude

Description : While preparing a detailed estimate (A) Dimension should be measured correct to 0.01 m (B) Area should be measured correct to 0.01 sqm (C) Volume should be measured correct to 0.01 cum (D) All the above

Last Answer : (D) All the above

Description : What would be a likely characteristic of an ecosystem that has remained relatively unchanged for hundreds to thousands of years?

Last Answer : What is the answer ?

Description : Most of the outcome/dependent variable characteristics and attributes measured on educational characteristics probably exist at the ______________ level of measurement. a. Nominal b. Ordinal c. Interval d. Ratio

Last Answer : b. Ordinal

Description : Do it because I said to” is the mantra for project managers who use _____ as the  default approach to resolve conflict. Select one: a. collaborating b. compromising c. accommodating d. forcing e. avoiding

Last Answer : d. forcing

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements