If no. of rows are not equal to number of columns and the matrix elements are profit elements then the
problem is:
a. Balanced and Maximization Transportation problem
b. Unbalanced and Maximization Transportation problem
c. Balanced and Maximization Assignment problem
d. Unbalanced and Maximization Assignment problem

1 Answer

Answer :

a. Balanced and Maximization Transportation problem

Related questions

Description : If no. of rows are equal to number of columns and the matrix elements are Time elements then the problem is: a. Balanced and Minimization Transportation problem b. ... Transportation problem c. Balanced and Minimization Assignment problem d. Unbalanced and Minimization Assignment problem

Last Answer : c. Balanced and Minimization Assignment problem

Description : If in an assignment problem, number of rows is not equal to number of columns then a. Maximization problem b. Problem is unbalanced c. Problem is degenerate d. Optimum solution is not possible

Last Answer : c. Problem is degenerate

Description : If profit, sales, production, etc is given then it is _________ a. Balanced problem b. Unbalanced problem c. Maximization problem d. Minimization problem

Last Answer : c. Maximization problem

Description : An assignment problem is a special case of transportation problem, where a. Number of rows equals number of columns b. All rim conditions are 1 c. Values of each decision variable is either 0 or 1

Last Answer : D.variable is either 0 or 1

Description : An assignment problem is considered as a particular case of a transportation problem because a. The number of rows equals columns b. All xij = 0 or 1 c. All rim conditions are 1 d. All of the above

Last Answer : d. All of the above

Description : If cost, time, etc is given, then it is ________ a. Balanced problem b. Unbalanced problem c. Maximization problem d. Minimization problem

Last Answer : d. Minimization problem

Description : If the number of jobs is not equal to the number of resources, then the problem is term as _____ assignment problem a. Balanced b. Unbalanced c. Equal d. Unequal

Last Answer : b. Unbalanced

Description : If the number of jobs is equal to the number of resources, then the problem is term as _____ assignment problem a. Balanced b. Unbalanced c. Equal d. Unequal

Last Answer : a. Balanced

Description : For maximization in assignment problem, the objective is to maximize the a. Profit b. Optimization c. Cost d. None of the above

Last Answer : a. Profit

Description : Maximization problem, then convert into minimization table through _________ a. Row minimization b. Column minimization c. Regret matrix d. Profit matrix

Last Answer : c. Regret matrix

Description : An optimal assignment requires that the maximum number of lines that can be drawn through squares with zero opportunity cost be equal to the number of a. Rows or columns b. Rows & columns c. Rows + columns -1 d. None of the above

Last Answer : b. Rows & columns

Description : An optimal solution of an assignment problem can be obtained only if a. Each row & column has only one zero element b. Each row & columns has at least one zero element c. The data is arrangement in a square matrix d. None of the above

Last Answer : d. None of the above

Description : Maximization assignment problem is transformed into a minimization problem by a. Adding each entry in a column from the maximization value in that column b. Subtracting each entry in a column from the maximum ... entry in a column from the maximum value in that table d. Any one of the above

Last Answer : c. Subtracting each entry in a column from the maximum value in that table

Description : When a particular assignment in the given problem is not possible or restricted as a condition, it is called a __ problem a. Infeasible b. Degenerate c. Unbalanced d. Prohibited

Last Answer : d. Prohibited

Description : ___ is one of the fundamental combinatorial optimization problems a. Assignment problem b. Transportation problem c. Optimization problem d. None of the above

Last Answer : a. Assignment problem

Description : The assignment problem a. Requires that only one activity be assigned to each resource b. Is a special case of transportation problem c. Can be used to maximize resources d. All of the above

Last Answer : d. All of the above

Description : . The method used for solving an assignment problem is called a. Reduced matrix method b. MODI method c. Hungarian method d. None of the above

Last Answer : . c. Hungarian method

Description : ________ technique is related to Quality control a. Assignment b. Transportation c. CPM d. SQC

Last Answer : d. SQC

Description : ______ are technique applied in project management a. CPM b. Assignment c. Transportation d. Decision theory

Last Answer : a. CPM

Description : In the Hungarian method for solving assignment problem, an optimal assignment requires that the maximum number of lines that can be drawn through squares with zero opportunity cost be equal to the number of: (A) rows or columns (B) rows+columns (C) rows+columns-1 (D) rows+columns+1

Last Answer : (A) rows or columns

Description : 35. Which of the following is not a characteristic of the L P model a. Alternative courses of actions b. An objective function of maximization type c. Limited amount of resources d. Non-negativity condition on the value of decision variable

Last Answer : b. An objective function of maximization type

Description : 34. Maximization of objective function in an L P model means a. Value occurs at allowable set of decisions b. Highest value is chosen among allowable decisions c. Neither of above d. Both a & b

Last Answer : a. Value occurs at allowable set of decision

Description : Every combination of strategies determines an outcome known as _____ a. Regret b. Payoff c. Saddle point d. Profit matrix

Last Answer : b. Payoff

Description : For solving an assignment problem, which method is used? a. British b. American c. German d. None of the above

Last Answer : B. american

Description : The purpose of a dummy row or column in an assignment problem is to a. Obtain balance between total activities and total resources b. Prevent a solution from becoming degenerate c. Provide a means of representing a dummy problem d. None of the above

Last Answer : a. Obtain balance between total activities and total resources

Description : While solving an assignment problem, an activity is assigned to a resource through a square with zero opportunity cost because the objective is to a. Minimize total cost of assignment b. Reduce the cost of ... to zero c. Reduce the cost of that particular assignment to zero d. All of the above

Last Answer : c. Reduce the cost of that particular assignment to zero

Description : The extra row or column which is added to balance an assignment problem is called _____ a. Regret b. Epsilon c. Dummy d. extra

Last Answer : c. Dummy

Description : ________ which is a subclass of a linear programming problem(LPP) a. Programming problem b. Transportation problem c. Computer problem d. All of the above

Last Answer : b. Transportation problem

Description : The solution to a transportation problem with ‘m’ rows and ‘n’ columns is feasible if the number of positive allocations are: a. m + n b. m x n c. m +n – 1 d. m +n + 1

Last Answer : c. m +n – 1

Description : A situation in a game where, in the payoff matrix, maximin of row is equal to minimax of column is called___ a. Centre point b. Main point c. Saddle point d. Equal point

Last Answer : c. Saddle point

Description : The given maximization assignment problem can be converted into a minimization problem by (A) subtracting each entry in a column from the maximum value in that column. (B) subtracting each entry in the table ... value in that column. (D) adding maximum value of the table to each entry in the table.

Last Answer : (B) subtracting each entry in the table from the maximum value in that table.

Description : What is a saddle point? a. Equilibrium point b. Balanced growth point c. Imbalanced growth point d. Unstable equilibrium point

Last Answer : c. Imbalanced growth point

Description : What is a saddle point? a. Equilibrium point b. Balanced growth point c. Imbalanced growth point d. Unstable equilibrium point

Last Answer : a. Equilibrium point

Description : balanced vs unbalanced transportation models differentiated?

Last Answer : 17. What major benefits do corporations and investors enjoy because of the existence of organized security exchanges

Description : LPP is exactly used in solving what kind of resource allocation problems? a. Production planning and scheduling b. Transportation c. Sales and advertising d. All of the above

Last Answer : d. All of the above

Description : _________ technique helps to make a choice from numerous available alternatives a. PERT b. CPM c. Linear Programming d. Transportation

Last Answer : d. Transportation

Description : _____ technique is related to Inventory management a. EOQ b. SQC c. CPM d. transportation

Last Answer : a. EOQ

Description : 52. If an iso-profit yielding the optimal solution coincides with a constraint line, then a. The solution is unbounded b. The solution is infeasible c. The constraint which coincides is redundant d. None of the above

Last Answer : d. None of the above

Description : When there are several projects are executing simultaneously, matrix organization allows a better companywide A. Balance of resources B. Prioritized resources C. Balanced capital D. Unbalanced resources

Last Answer : Balance of resources

Description : A common assumption about the players in a game is that a. Neither player knows the payoff matrix b. The players have different information about the payoff matrix c. Only one of the players pursues a rational strategy d. The specific identify of the players is irrelevant to the play of the game

Last Answer : d. The specific identify of the players is irrelevant to the play of the game

Description : 51. An iso-profit line represents a. An infinite number of solutions all of which yield the same profit b. An infinite number of solutions all of which incurs the same cost c. An infinite number of optimal solutions d. A boundary of the feasible region

Last Answer : . An infinite number of solutions all of which yield the same profit

Description : Python : Remove all columns from a compressed sparse matrix where value is 0 for all rows -Web-Development

Last Answer : answer:

Description : What are the rows and columns of the matrix ?

Last Answer : The rectangular arrangement of numbers in the matrix is analyzed in two ways. Namely: along the horizontal line and along the vertical line. The horizontal lines of numbers are called rows and the vertical lines are called columns.

Description : A Transportation Problem is said to be unbalanced when total supply is not equal to ............ a. Total cost b. Total demand c. Both a and b d. None of these

Last Answer : b. Total demand

Description : A ______ occurs when each player selects one of his strategies a. Profit b. Decision c. Play d. Game

Last Answer : c. Play

Description : . For __________ minimization, we take least value from each column and subtract it from all values of that column. a. Column b. Row c. Profit d. Cost

Last Answer : a. Column

Description : For __________ minimization, we take least value from each row and subtract it from all values of that row. a. Column b. Row c. Profit d. Cost

Last Answer : b. Row

Description : An objective function is maximized when it is a _______ function a. Passive b. Profit c. Cost d. None of the above

Last Answer : b. Profit

Description : 62. If one of the constraint of an equation in an LP problem has an unbounded solution, then a. Solution to such LP problem must be degenerate b. Feasible region should have a line segment c. Alternative solutions exists d. None of the above

Last Answer : b. Feasible region should have a line segment