Description : The first multi-purpose project of independent India is – (1) Bhakra-Nangal (2) Damodar (3) Hirakud (4) Nagarjunasagar
Last Answer : (2) Damodar Explanation: Damodar Valley Corporation came into existence on 7 July, 1948 as the first multipurpose river valley project of independent India. It emerged as a culmination of attempts made over a ... over an area of 25,000 km2 covering the states of Bihar (now Jharkhand) & West Bengal.
Description : Which of the following is not a multi-purpose project involving more than one State in India? (a) Nagarjunasagar (b) Damodar Valley Corporation (c) Bhakra Nangal (d) Chambal
Last Answer : Ans: (a)
Description : Which is India’s largest multipurpose river valley project? (a) Bhakra Nangal (b) Damodar Valley (c) Nagarjunasagar (d) Thungabhadra
Description : The first river valley project started in India is (a) Bhakra Nangal Project (b) Damodar Valley Project (c) Kosi Project (d) Hirakud Project
Last Answer : Ans: (b)
Description : The multipurpose project irrigating maximum area in India is (a) Beas (b) Bhakra Nangal (c) Damodar Valley (d) Hirakud
Last Answer : Ans: (d)
Description : Name a multi-purpose projects which are used for hydel power production and irrigation (a) Jalaput project (b) Bhakra – Nangal project (c) Hirakud project (d) Tehri Dam
Last Answer : (b) Bhakra – Nangal project
Description : The longest dam in India is (1) Bhakra Dam (2) Nagarjuna Sagar Dam (3) Hirakud Dam (4) Kosi Dam
Last Answer : Hirakud Dam
Description : Indira Gandhi canal is drawn from the,A. Hirakud project. B. Bhakra NANGAL project. C. Jayakwadi Project. D. DVC project.
Last Answer : B. Bhakra NANGAL project.
Description : Which dam integrates conservation of water with flood control? (a) Sutluj-Beas river basin(b) Bhakra – Nangal project (c) Hirakud project (d) Tehri Dam
Last Answer : (c) Hirakud project
Description : Which multipurpose project was taken up first of all after independence? (a) Bhakra Nangal Project (b) Damodar Valley Project (c) Kosi Project (d) None of these
Description : The world's longest masonry dam is (a) Hirakud (b) Bhakra Nangal (c) Nagarjuna Sagar (d) Aswan
Description : Which one of the following is the highest gravity dam in the world? (1) Beas Dam (2) Nangal Dam (3) Bhakra Dam (4) Hirakud Dam
Last Answer : (3) Bhakra Dam Explanation: Currently, the tallest dam in the world is the Nurek Dam, an embankment dam in Tajikistan at 300 m high. The tallest arch dam is the recently completed 292 ... under construction in China. Natural landslide dams are also quite competitive in height but not listed here.
Description : Identify the dam constructed across the Bhagirathi River. a) Hirakud Dam b) Bhakra Nangal Dam c) Tehri Dam d) Salal Dam
Last Answer : c) Tehri Dam
Description : Which one of the following is the highest gravity dam in the world ? (1) Beas Dam (2) Nangal Dam (3) Bhakra Dam (4) Hirakud Dam
Last Answer : Bhakra Dam
Description : Bhakra Nangal Dam is constructed across, A. Satluj. B. Mahanadi. C. Ganga. D. Damodar.
Last Answer : A. Satluj.
Description : Which is the world’s longest entirely lined irrigation canal? (1) Indira Gandhi Canal (2) Nangal Hydel Channel (3) Tungabhadra Left Bank Canal (4) Sardar Sarovar Project
Last Answer : Sardar Sarovar Project
Description : The Nagarjunasagar dam is constructed on the river ? (1) Krishna (2) Chambal (3) Kosi (4) Sutlej
Last Answer : Krishna
Description : The highest dam in India, Bhakra is built on (1) Vyas river (2) Jhelum river (3) Sutlej river (4) Ghaghara river
Last Answer : Sutlej river
Description : Which dam of India is the highest? (1) Mettur (2) Rihand (3) Thein (4) Bhakra
Last Answer : Bhakra
Description : Which dam in India has the distinction of being the longest main stream dam in the world? (a) Bhakra Nangal Dam (b) Rihand Dam (c) Tehri Dam (d) Kosi Project
Last Answer : Ans: (c)
Description : Which is the largest water resource project of India covering four states ? (a)Satluj Beas Project (b) Bhakra Nangal dam (c) Tehri Dam (d) Sardar Sarovar Dam
Last Answer : (d) Sardar Sarovar Dam
Description : The joint river valley venture of India and Nepal is (1) Gomati (2) Chambal (3) Damodar (4) Kosi
Last Answer : Kosi
Description : On which river has the Hirakud Dam been built ? (1) Mahanadi (2) Godavari (3) Cauvery (4) Periyar
Last Answer : Mahanadi
Description : The highest multipurpose dam built on the river Ravi is– (1) Bhakra Nagal (2) Kahalgaon (3) Ranjit Sagar dam (4) Rihand dam
Last Answer : Ranjit Sagar dam
Description : The Bhakra Nangal Multipurpose Project is a joint venture of [IAS 2009] (a) Punjab and Haryana only (b) Punjab, Haryana and Rajasthan only (c) Punjab, Haryana, Rajasthan and Himachal Pradesh (d) Punjab and Himachal Pradesh only
Description : Bhakra Nangal Project is constructed across which river? (1) Ganga (2) Sutlej (3) Cauvery (4) Brahmaputra
Last Answer : (2) Sutlej Explanation: Bhakra Nangal Projectis a concrete gravity dam the Satluj River in Bilaspur, Himachal Pradesh. It is a joint venture of the Punjab, Haryana and Rajasthan states designed to harness the precious water of the Satluj for the benefit of the concerned states.
Description : Bhakra Nangal River Valley Project is made on the river: (a) Sutlej-Beas (b) Ravi-Chenab (c) Ganga (d) Son
Last Answer : (a) Sutlej-Beas
Description : Which of the following projects supplies electricity to the Rourkela Steel Plant? (1) Damodar Valley Project (2) Hirakud Dam Project (3) Tungabhadra Project (4) Nagarjuna Project
Last Answer : (2) Hirakud Dam Project Explanation: Rourkela Steel Plant (RSP) is the first integrated steel plant in the public sector in India. The Hirakud Project supplies the bulk quantity of power to the ... supply from the River Brahmani led to the selection of Rourkela as the site for the steel plant.
Description : On which of the following sets of rivers are Nagarjunasagar, Ukai, Hirakud, and Thein Dam located respectively? (a) Krishna, Mahanadi, Godavari, Tapi (b) Cauvery, Krishna, Narmada, Beas (c) Krishna, Tapi, Mahanadi, Ravi (d) Godavari, Brahmaputra, Narmada, Yamuna
Description : Which of the following projects is administered by more than one State? (a) Nagarjunasagar (b) Kosi (c) Hirakud (d) Tungabhadra
Description : Nagarjunasagar Dam was built on (a) Mahanadi river (b) Damodar river (c) Krishna river (d) Cauvery river
Description : The highest dam in India is the dam. (a) Maithan (b) Bhakra (c) Hirakud (d) Machkund
Description : The longest dam in India is – (1) Bhakra Dam (2) Nagaluna Sagar Dam (3) Hirakud Dam (4) Kosi Dam
Last Answer : (3) Hirakud Dam Explanation: The Indira Gandhi Canal starts from the Harike Barrage at Sultanpur, a few kilometers below the confluence of the Sutlej and Beas rivers in Punjab state. The reservoir for the canal is built on the Sutlej.
Description : Name the river on which the Bhakra Nangal dam is located. -SST 10th
Last Answer : Bhakra Nangal dam is located on the Satluj .
Description : Name the river on which Bhakra Nangal Dam is constructed. a) Krishna River b) Ravi River c) Satluj River d) Beas River
Last Answer : c) Satluj River
Description : Which was the first hydel power project in India ? (1) Pallivasal in Kerala (2) Paikara in Tamil Nadu (3) Siva Samudram in Karnataka (4) Nizamnagar in Andhra Pradesh
Last Answer : Siva Samudram in Karnataka
Description : Asia’s first underground Hydel Project is located in which of the following States in India? (1) Jammu & Kashmir (2) Himachal Pradesh (3) Arunachal Pradesh (4) Uttar Pradesh
Last Answer : Himachal Pradesh
Description : The Chukha Power Project was built by India in (1) Nepal (2) Bhutan (3) Myanmar (4) Bangladesh
Last Answer : Bhutan
Description : Salal is the hydro power project in: (1) Haryana (2) Jammu and Kashmir (3) Himachal Pradesh (4) Punjab
Last Answer : Haryana
Description : The Nagarjuna Sagar Project is constructed on the river (1) Kaveri (2) Krishna (3) Godavari (4) Indus
Description : The Cogentrix Power Project is located in (1) Karnataka (2) Kerala (3) Gujarat (4) Madhya Pradesh
Last Answer : Karnataka
Description : Rihand Dam Project provides irrigation to (1) Gujarat and Maharashtra (2) Orissa and West Bengal (3) Uttar Pradesh and Bihar (4) Kerala and Karnataka
Last Answer : Uttar Pradesh and Bihar
Description : The Loktak Lake on which a hydroelectric project was constructed is situated in the State of (1) Madhya Pradesh (2) Manipur (3) Meghalaya (4) Himachal Pradesh
Last Answer : Manipur
Description : Where is Nathpa Jhakri Power Project located ? (1) Uttarakhand (2) Arunachal Pradesh (3) Himachal Pradesh (4) Andhra Pradesh
Description : Which one of the following pairs is correctly matched ? (1) Tulbul Project – Himachal Pradesh (2) Srisailam Project – Tamil Nadu (3) Papanasam Project – Karnataka (4) Ukai Project – Gujarat
Last Answer : Ukai Project – Gujarat
Description : Which of the following pairs is wrongly matched ? (1) Koyana Project - Maharashtra (2) Sharavathy Project - Karnataka (3) Balimela Project - Orissa (4) Sabarigiri Project - Gujarat
Last Answer : Sabarigiri Project - Gujarat
Description : Where is Tala Hydroelectric project, which is expected to generate 1020 MW power, located ? (1) Arunachal Pradesh (2) Bhutan (3) Nepal (4) Himachal Pradesh
Description : Girna Project is situated in (1) Andhra Pradesh (2) Maharashtra (3) Orissa (4) Chhattisgarh
Last Answer : Maharashtra
Description : The Nagarjunasagar Project is an important multipurpose project on the river ______ in the ______ district of Andhra Pradesh. (a) Godavari, West Godavari (b) Mahanadi, Krishna (c) Krishna, Nalgonda (d) Tungabhadra, East Godavari
Description : Match the following: List-I List-II A. Beas Project 1. Krishna B. Nagarjunasagar Dam 2. Godavari C. Ukai Project 3. Bhagirathi D. Pochampad Project 4. Tapi E. Tehri Project 5. Pong Dam Codes: A B C D E (a) 4 1 5 2 3 (b) 5 1 4 2 3 (c) 5 1 2 4 3 (d) 1 4 3 2 5