Description : What are the product prime factor of 120?
Last Answer : 2 x 2 x 2 x 3 x 5 = 8 x 15 = 40 + 80 = 120
Description : How do you Express 240 as the product of its prime factor?
Last Answer : It is: 2*2*2*2*3*5 = 240 or as 2^4 times 3 times 5 = 240
Description : What is 375 as a product of prime factor in index form?
Last Answer : It is: 3 times 5^3 = 375
Description : What is the prime factorization of 120 ordered from least to greatest?
Last Answer : As a product of its prime factors: 2*2*2*3*5 = 120
Description : Calculate the recoverable waste heat (Q, in kCal/hour) from flue gases using the followingparameters: V (flow rate of the substance) 2000 m3/hr r (density of the flue gas): 0.9 kg/m3 Cp (specific heat ... (temperature difference): 120 oC h (recovery factor): 50% a. 21600 b. 43200 c. 25600 d. 34000
Last Answer : 21600
Description : A three-phase synchronous motor has a terminal voltage of 460 V and a terminal current of 120 A at a power factor of 0.95 lagging, synchronous reactance of 1.68 ohm and the field current is 47 A. The field to armature mutual ... _____________. (a). 20mH (b). 16mH (c). 24mH (d). 22mH
Last Answer : 22
Description : Divide the product of 120 and 24 by 6²?
Last Answer : Write an expression for each problem,then solve
Description : Q.61. CA Co manufactures a single product and has drawn up the following flexed budget for the year. 60% 70% 80% Rs Rs Rs Direct materials 120,000 140,000 160,000 Direct labour 90,000 105,000 120,000 Production ... activity? (a) Rs 330,300 (b) Rs 370,300 (c) Rs 373,300 (d) Rs 377,300
Last Answer : (b) Rs 370,300
Description : In a 100 TPD Sponge Iron plant, the sponge iron is fed to the Induction melting furnace, producing molten steel at 88% yield. The Energy consumption details are as follows: Coal Consumption : 130 ... molten steel (product). 3. Total Energy Consumption of Plant in Tons of Oil Equivalent (TOE )
Last Answer : a) Specific Energy Consumption of Induction Melting Furnace Molten Steel Production from the Induction melting furnace per day = 100 x 88/100 = 88 TPD Total Energy Consumption of the Plant = 82400 kWh ... mark c) Total Energy consumption of Plant in ToE = 655864000/107 = 65.586 ToE
Description : What is 108 factor tree using prime factorization?
Last Answer : Multiples of 54
Description : What isA prime number and factor of 78 and 2 diget number?
Last Answer : 7678219902and 5
Description : What are the prime factor of HCF?
Last Answer : Each HCF has its own set of prime factors.
Description : What isThe largest prime factor of 38 is?
Last Answer : It is: 19
Description : "what is a prime number and a factor of 36''?
Last Answer : The prime numbers also the factors of 36 is...............THREE & TWO
Description : Smallest and greatest prime factor 340?
Last Answer : 1 and 340
Description : The power factor of an AC generator operating singularly is determined by the __________. A. connected load B. prime mover speed C. field excitation D. generator's rated voltage
Last Answer : Answer: A
Description : The power factor at which a paralleled AC generator operates is usually adjusted by the _____________. A. connected load B. prime mover speed C. field excitation D. generator's rated voltage
Last Answer : Answer: C
Description : 1. When did Mr. Attlee, Prime Minister of England, announce tile transfer of power to the Indians? 2. Who is the recepient of Nobel Prize for the development of Wireless Telegraphy? 3. ... detailed pictures of which comet nucleus? 20. Of which site of Harappan is associated with rice cultivation?
Last Answer : Answer : 1. June, 1948 2. Marconi 3. GNP 4. Typhoons 5. Samudragupta 6. Ashapurna Devi 7. habitat destruction 8. Ministry of Human Affairs 9. Indequacy of water supply 10. Tansen 11. Synthetic petrol 12. ... 14. Kerala 15. Harivijaya 16. Pituitary 17. 530 18. Homi J. Bhabha 19. Tempel 1 20. Lothal