Description : Which neighbouring country has objections on Indian Baglihar Hydro-electric Project? -General Knowledge

Last Answer : answer:

Description : Which neighbouring country has objections on Indian Baglihar Hydro-electric Project?

Last Answer : Pakistan

Description : The Sharavati Project is a/an (a) thermal project (b) hydro-electric project (c) multipurpose project (d) irrigation project

Last Answer : Ans: (b)

Description : Nayveli Power Project is a _______ Power Project. (a) Hydro-electric (b) Nuclear (c) Thermal (d) Non-conventional

Last Answer : Ans: (c)

Description : which of Pakistans's neighbouring country has no coastline?

Last Answer : Afghanistan is the neighbouring country which has no coastline.

Description : Which one among the following is a Fundamental Duties of citizens under the Constitution of India? (1) To provide friendly cooperation to the people of the neighbouring countries (2) To visit the monuments of ... when called upon to do so (4) To know more and more about the religions of India

Last Answer : (3) To defend the country and render national service when called upon to do so Explanation: One of the fundamental duties is to "defend the country and render national service when called upon to do so."

Description : Which country has the largest number of land-border neighbouring countries?

Last Answer : Russia

Description : Which country has the largest number of land-border neighbouring countries?

Last Answer : Russia

Description : On which river is the Baglihar Dam being constructed by India? A. Chenab B. Jhelum C. Indus D. Sutlej

Last Answer : ANSWER: A

Description : On which river is the Baglihar Dam being constructed by India? A. Chenab B. Jhelum C. Indus D. Sutlej 94

Last Answer : ANSWER: A

Description : On which river is the Baglihar Dam being constructed by India? A. Chenab B. Jhelum C. Indus D. Sutlej

Last Answer : ANSWER: A

Description : On which river is the Baglihar Dam being constructed by India? A. Chenab B. Jhelum C. Indus D. Sutlej

Last Answer : ANSWER: A

Description : On which river is the Baglihar Dam being constructed by India? A. Chenab B. Jhelum C. Indus D. Sutlej

Last Answer : ANSWER: A

Description : On which river is the Baglihar Dam being constructed by India? A. Chenab B. Jhelum C. Indus D. Sutlej

Last Answer : ANSWER: A

Description : Baglihar dam is constructed on which river —

Last Answer : Chenab

Description : In which of the following states, Teesta Urja hydro-power project is proposed to be set up? (a) Sikkim (b) Andhra Pradesh (c) West Bengal (d) Arunachal Pradesh (e) Assam

Last Answer : Ans: (a)

Description : Match the following: Place Power Project A. Kalpakkam 1. Thermal power project B. Kolkata 2. Nuclear power project In d ian Min er al s an d In d u st r ies C. Koyna 3. Tidal power project D. Bhavnagar 4. Hydro power project A B C D (a) 1 3 4 2 (b) 2 3 1 4 (c) 2 1 4 3 (d) 2 3 4 1

Last Answer : Ans: (c)

Description : Salal is the hydro power project in: (1) Haryana (2) Jammu and Kashmir (3) Himachal Pradesh (4) Punjab

Last Answer : (2) Jammu and Kashmir Explanation: Salal Hydroelectric Power Station is constructed on river Chenab in the state of Jammu & Kashmir. The project was conceived in 1920. The project is located near Reasi about 100 km from Jammu.

Description : Umium Hydro Power Project dam is located few kilometres north to which of the following

Last Answer : Shilong

Description : In which state, Salal Hydro Power Project is located

Last Answer : Jammu and Kashmir

Description : In which state ,the Koyna Hydro-Power Project is located

Last Answer : Maharashtra

Description : A hydro power project on Lake Loktak is situated in which state

Last Answer : Manipur

Description : Name the first hydro Power Project built in Jammu and Kashmir. a) Bhakra Dam b) Sardar Sarovar Dam c) Chandil Dam d) Salal Dam

Last Answer : d) Salal Dam

Description : Umium Hydro Power Project dam is located few kilometres north to which of the following

Last Answer : Shilong

Description : Salal is the hydro power project in: (1) Haryana (2) Jammu and Kashmir (3) Himachal Pradesh (4) Punjab 

Last Answer : Haryana

Description : Which of the following hydro-electric stations is situated in Uttar Pradesh? (a) Mayurakshi (b) Rihand (c) Kangsabati (d) Hirakud

Last Answer : Ans: (b)

Description : In Jaitapur, which one of the following power plants is being set up? [Haryana Gr Bank PO 2011] (1) Coal based (2) Hydro-electric (3) Gas based (4) Nuclear based (5) None of these

Last Answer : Ans: (4) 40. In which one of the following States, Mangla, Bhagyam and Aishwarya oil fields are located? [Haryana Gr Bank PO 2011] (1) Assam (2) Gujarat (3) A.P. (4) Orissa (5) Rajasthan

Description : The cost of fuel transportation is maxmimun in........ A.Hydro-electric power plant B.Steam power plant C.Nuclear power plant D.90% - 95%

Last Answer : Ans: B

Description : Hydro-electric power is a: (1) non-renewable natural resource (2) a mixture of renewable and non-renewable natural resource (3) neither renewable nor non renewable resource (4) renewable natural resource

Last Answer : (4) renewable natural resource Explanation: Hydro-electric power is a renewable natural resource.

Description : Which type of pole generators are used in Hydro-electric plants and why?

Last Answer : A: As the speed of operation is low for hydro turbines used in Hydro-electric plants, salient pole type Synchronous generators are used. These allow better ventilation and also have other advantages over smooth cylindrical type rotor.They have more diameter and less axial length.

Description : The electric motor in a mild hybrid is acting as a a. Power booster b. Hydro boost c. Buffalo power booster d. Booster plug

Last Answer : a. Power booster

Description : Over voltage protection is recommended for (a) hydro-electric generators (b) steam turbine generators (c) gas turbine generators (d) all of the above (e) none of the above

Last Answer : (d) all of the above

Description : Hydro-electric power is a: (1) non-renewable natural resource (2) a mixture of renewable and non-renewable natural resource (3) neither renewable nor non renewable resource (4) renewable natural resource

Last Answer : renewable natural resource

Description : Hydro electric plant

Last Answer : Hydro electric plant : In Hydro electric power plants the energy of water is utilized to move the hydraulic turbines which in turn runs an electric generator to convert the mechanical energy ... potential energy of water is converted into mechanical work and ultimately into electrical energy

Description : With a neat diagram explain medium head hydro-electric power plants. 

Last Answer : Diagram of medium head hydro-electric power plants:  Explanation:- If head of water is between 30 and 100 m, the plant is called a medium-head plant. Potential energy of ... Francis turbines are normally used. Alternator required in these plants is of low speed and large in diameter. 

Description : Classify the hydro-electric plants according to the head and load basis.  

Last Answer : Classification the hydro-electric plants According to availability of Head of Water:  1. Very high head power plant 2. High head power plant 3. Medium head power plant 4. Low head power plant  ... -electric plants According to Load basis:   1. Base load power plant 2. Peak load power plant

Description : "Hydro electric power station are not perennial power station". Justify.

Last Answer : Justification: The water utilized by the hydro power plants comes mostly from storage dams/reservoirs which get filled up during the monsoon rainy season. Such reservoirs are utilized for supplying ... are important. Hence "Hydro electric power stations are not perennial power station" 

Description : Classify hydro-electric power plants according to water flow regulation and explain in brief.

Last Answer : Classification of hydro-electric power plants according to water flow regulation of water flow:-  1. Large reservoir power plant 2. Run-off river (ROR) power plant with poundage 3. Run-off River ... depends upon rate of flow of water Initial cost is less Its purpose is to generate electricity.

Description : Which of the following components is not a part of hydro-electric plant ? (a) Penstock (b) Spillway (c) Surge tank (d) Economiser 

Last Answer : Economiser

Description : Who is making all the weapons used in disputes from neighbouring countries?

Last Answer : answer:Many are locally produced. Israel, for example, manufactures a lot of its own stuff locally, and of course gets some from the US and Britain and France and Germany. Palestinians get ... from N Korea and Russia (and Germany). Don't underestimate Russian cleverness in arms distibution either.

Description : Two neighbouring African countries get their names from a river they share. What is the name of the river?

Last Answer : Answer: Niger.

Description : Which one of the following is the most possible solution for planning improvement of a metropolitan city in India? [IAS 2003] (a) Constructing high rise building and sky scrapers (b) ... and satellite towns around the main city (d) Preventing immigration of people into the metropolitan city

Last Answer : Ans: (b)

Description : A cancer cell is characterized by (A) Uncontrolled cell division (B) Invasion of neighbouring cells (C) Spread to distant sites (D) All of these

Last Answer : Answer : D

Description : The following are true about critical fusion frequency: a. it refers to the rate at which stimuli can be presented and still be perceived as separate stimuli b. it is dependent on visual ... on the spacing between neighbouring photoreceptors d. it depends on the time-resolving ability of the eye

Last Answer : it depends on the time-resolving ability of the eye

Description : All India mail survey has to cover a) Home district b) Neighbouring circle & distant circle c) Home circle d) All the above

Last Answer : d) All the above

Description : The function of the gap junction is to (a) separate two cells from each other (b) stop substance from leaking across a tissue (c) performing cementing to keep neighbouring cells together ( ... cells by connecting the cytoplasm for rapid transfer of ions, small molecules and some large molecules.

Last Answer : (d) facilitate communication between adjoining cells by connecting the cytoplasm for rapid transfer of ions, small molecules and some large molecules.

Description : Allelo-chemicals interfere with survival and growth of a).Neighbouring plants b). succeeding plants c). The donor plants themselves d). All

Last Answer : d). All

Description : An intermediate hue is a. Two primary colours in equal amount b. Two secondary colours in equal amounts c. A mixture of one primary colour and its adjacent / neighbouring secondary colour d. A mixture of 1 secondary and its opposite primary in 3:2 proportion

Last Answer : c. A mixture of one primary colour and its adjacent / neighbouring secondary colour.

Description : The mechanism by which neostigmine improves contraction of myasthenic muscle involves: A. Repetitive binding of the acetylcholine molecules to the same receptors at the muscle endplate B. Diffusion of ... Activation of motor end-plate receptors by neostigmine molecules themselves D. All of the above

Last Answer : D. All of the above