According to the recommendations of Nagpur Conference, the width formation of an ideal
National Highway in hard rock cutting, is
(A) 8.9 m
(B) 7.9 m
(C) 6.9 m
(D) 6.5 m

1 Answer

Answer :

Answer: Option B

Related questions

Description : On the recommendations of Nagpur Conference, the minimum width of a village road may be (A) 2.45 m (B) 2.75 m (C) 3.66 m (D) 4.90 m

Last Answer : Answer: Option A

Description : The width of pavement in addition to a gravelled berm 1 m on either side for a two directional traffic recommended by Nagpur Conference of Chief Engineers, is (A) 4.7 m (B) 5.7 m (C) 6.7 m (D) 7.7 m

Last Answer : Answer: Option C

Description : The width of different roads as recommended in Nagpur plan by the Indian Road Conference for hilly region, is (A) Same for National Highways (B) Different for National Highways (C) Same for State Highways (D) Same for Major District roads

Last Answer : Answer: Option B

Description : According to IRC : 52-1973, for a single lane National Highway in hilly region, (A) Width of the carriageway must be 3.75 m (B) Shoulders on either side must be 1.25 m (C) Total width of the road-way must be 6.25 m (D) Total of the above

Last Answer : Answer: Option D

Description : According to Highway Research Board of U.S.A. practical land width, is (A) 2.7 m (B) 3.0 m (C) 3.3 m (D) 3.6 m

Last Answer : Answer: Option D

Description : The minimum width of the pavement of a National Highway should be (A) 4.7 m (B) 5.7 m (C) 6.7 m (D) 7.7 m

Last Answer : Answer: Option B

Description : According to the recommendations of International Navigational Congress in 1912, the ratio of length to width at the entrance for cargo vessels is (A) 5.5 and 6.0 to 1 (B) 6.2 and 6.8 to 1 (C) 7.4 and 7.8 to 1 (D) 8.2 and 8.5 to 1

Last Answer : (C) 7.4 and 7.8 to 1

Description : According to the recommendations of International Navigational Congress in 1912, the ratio of length to width at the entrance for passenger vessels is: (A) 7.25 to 1 (B) 7.80 to 1 (C) 8.11 to 1 (D) 8.44 to 1

Last Answer : (D) 8.44 to 1

Description : The normal road land width for a National or State highway, in open areas should be (A) 45 m (B) 30 m (C) 24 m (D) 20 m

Last Answer : Answer: Option A

Description : Normal formation width of a hill road for one-way traffic, is (A) 3.6 m (B) 4.8 m (C) 6.6 m (D) 7.2 m

Last Answer : Answer: Option B

Description : For new lines, width of formation in cutting for M.G. single line is (a) 5.25 m* (b) 5.85 m (c) 6.25 m (d) 6.85 m

Last Answer : (a) 5.25 m*

Description : The full width of land acquired before finalising a highway, alignment is known (A) Width of formation (B) Right of way (C) Carriage way (D) Roadway

Last Answer : Answer: Option B

Description : If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is (A) B + d + Sd (B) Bd + Sd2 (C) B × d - Sd1/2 (D) ½ (Bd + Sd2

Last Answer : (B) Bd + Sd2

Description : For new lines, width of formation in cutting for N.G. single line is (a) 3.35 m* (b) 3.70 m (c) 5.25 m (d) 5.85 m

Last Answer : a) 3.35 m*

Description : Formation width for bank for M.G. double line section is (a) 8.50 m (b) 8.84 m (c) 9.65 m (d) 9.81 m*

Last Answer : (d) 9.81 m*

Description : According to Indian Road Congress, the width of carriageway, is (A) 3.75 m for single lane (B) 7.0 m for two lanes without raised kerbs (C) 7.5 m for two lanes with raised kerbs (D) All the above

Last Answer : Answer: Option D

Description : The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as (A) Excavation (B) Surface dressing (C) Cutting (D) Surface excavation

Last Answer : (D) Surface excavation

Description : Road width 8.8 m of two lane National highways or State highways in mountainous terrain (A) Excludes the width of parapet (0.6 m) (B) Excludes the width of side drain (0.6 m) (C) Excludes the width of parapet and side drain (D) Includes the width of parapet and side drain

Last Answer : Answer: Option C

Description : Roadway width for a National highways and State highways (two-lanes) is (A) 12 m (B) 9 m (C) 9.5 m (D) 15 m

Last Answer : Answer: Option A

Description : Pick up the incorrect statement from the following: (A) The width of the wall is constructed thicker at the base in a stepped fashion (B) A long vertical load transferring concrete structure is ... ) The pile which transfers the load to a hard rock bed at certain depth is called load bearing

Last Answer : Answer: Option D

Description : An R.C.C. beam of 25 cm width and 50 cm effective depth has a clear span of 6 metres and carries a U.D.L. of 3000 kg/m inclusive of its self weight. If the lever arm constant for the section is 0.865, the maximum intensity ... , is (A) 8.3 kg/cm2 (B) 7.6 kg/cm2 (C) 21.5 kg/cm2 (D) 11.4 kg/cm2

Last Answer : Answer: Option A

Description : 1. Which of the statements with regard to formation is correct (1) One of the Functions of the formation is to facilitate drainage (2) Width of bank for double railway line is 12.155 meters (3) Width of cutting for double railway track is 11. ... a) 2, 3, 5 b) 3, 4, 5* c) 2, 3, 4 d) 2, 4, 5

Last Answer : b) 3, 4, 5*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : The recommended width of Single line formation cutting for BG excluding drain is a) 6250 mm* b) 6850mm c) 54 90mm d) 6100mm

Last Answer : a) 6250 mm*

Description : The recommended width of Double line cutting formation for B G is a) 10210 mm b) 10 975 mm c) 11555 mm* d) 10 820 mm

Last Answer : c) 11555 mm*

Description : Pick up the incorrect statement from the following: (A) Tresguet did not provide the top camber for the drainage of surface water (B) Tresguet provided the top camber for the drainage of surface ... (D) Macadam provided a camber to the formation at the dug-up state, to drain percolated water

Last Answer : Answer: Option A

Description : The rate of payment is made for 100 cu m (per % cu m) in case of (A) Earth work in excavation (B) Rock cutting (C) Excavation in trenches for foundation (D) All the above

Last Answer : (D) All the above

Description : What is the carriageway of two lane ROB on National Highway a)10.00m b)8.5 c)9.50* d)10.50

Last Answer : c)9.50*

Description : If the velocities of flow of a stream of 10 m depth recorded by a current meter at depths of 2 m and 8 m are 0.7 m and 0.3 m respectively, the discharge per unit width of the stream in cubic metres, is (A) 2 (B) 3 (C) 4 (D) 5

Last Answer : Answer: Option D

Description : For new lines, width of formation in bank for M.G. single line is (a) 5.25 m (b) 5.85 m* (c ) 6.25 m (e) 6.85 m

Last Answer : (b) 5.85 m*

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by (A) Mid-section formula (B) Trapezoidal formula (C) Prismoidal formula (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water ... and partly in filling and berms are designed as 2d where d is full supply depth (D) All the above

Last Answer : (D) All the above

Description : Which National Highway is called Shershah Suri Marg? (1) National Highway No. 3 (2) National Highway No. 8 (3) National Highway No. 7 (4) National Highway No. 1

Last Answer : (1) National Highway No. 3 Explanation: National Highway 1 or NH1 is a National Highway in Northern India that links the national capital New Delhi to the town of Attari in Punjab near the ... Sher Shah Suri that ran from Lahore to Bengal, built on earlier roads that existed from time immemorial.

Description : Which National Highway connects Chennai and Visakhapatnam ? [Asstt Comm 2008] (a) NH 4 (b) NH 5 (c) NH 6 (d) NH 8

Last Answer : Ans: (b)

Description : The width of the right of way in urban area, is kept between 24 m to 60 m for (A) National Highways (B) State Highways (C) Both (a) and (b) (D) None of these

Last Answer : Answer: Option D

Description : The normal road width of National and State highways (A) Is kept 45 m (B) In plain and rolling terrain built-up area, is 30 m (C) In mountainous built-up area is 20 m (D) All the above

Last Answer : Answer: Option D

Description : The minimum road width is taken (A) 9 m (B) 12 m (C) 16 m (D) 20 m

Last Answer : Answer: Option A

Description : In the hand instrument formula, 13-80-8-14, the number 14 represents the a. width of the blade b. blade length c. blade angle d. primary cutting edge angle e. none of the above.

Last Answer : c. blade angle

Description : If the width of a pavement slab is 7.5 m, thickness 20 cm and working stress 1400 kg/cm2 , spacing of 10 mm tie bars for the longitudinal joint, is (A) 10 cm (B) 20 cm (C) 30 cm (D) 40 cm

Last Answer : Answer: Option C

Description : For new lines, width of formation in bank for N.G single line is (a) 3.35 m (b) 3.70 m* (c ) 5.25 m (e) 5.85 m

Last Answer : b) 3.70 m*

Description : According to the recommendations of IS : 456-1978, the expansion joints (A) Are provided where plane changes abruptly (B) Are provided to ensure minimum resistance (C) Do not carry reinforcement across them (D) All the above

Last Answer : Answer: Option D

Description : According to ISI recommendations, the maximum depth of stress block for balanced section of a beam of effective depth d is (A) 0.43 d (B) 0.55 d (C) 0.68 d (D) 0.85 d

Last Answer : Answer: Option A

Description : The authorised agents 0eceipt books will be printed and supplied by the____,  Nagpur, to the___ a) National Savings Commissioner, Postal Stores Depots b) Security press Nasik, Circle stamp depot c) Security press Nasik, PSD d) None of these

Last Answer : a) National Savings Commissioner, Postal Stores Depots

Description : National Dairy Research Institute (NDRI) an umbrella institute under ICAR is located at? a. Karnal, Haryana b. Nagpur, Maharashtra c. Gandhi Nagar, Gujarat d. Indore, MP

Last Answer : a. Karnal, Haryana

Description : The first session of Indian National Congress was held at a) Bombay b) Delhi c) Kolkata d) Nagpur

Last Answer : a) Bombay

Description : The National Civil Defence college was founded in 1957 at? a. Bombay b. Nagpur c. Cochin d. Hyderabad

Last Answer : b. Nagpur

Description : National Bureau of Soil Survey and Land Use Planning (NBSSLUP) is headquartered at - a) Hyderabad b) Delhi c) Pune d) Nagpur

Last Answer : d) Nagpur

Description : National Research Centre for Citrus (NRCC) is located in - a) Pune b) Akola c) Wardha d) Nagpur

Last Answer : d) Nagpur

Description : The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage ... 15) chains (B) (6 + 12) chains (C) (6 + 18) chains (D) None of these

Last Answer : (B) (6 + 12) chains