The RUP is normally described from three perspectives- dynamic,

static& practice. What does static perspective do?

a) It shows the process activities that are enacted.

b) It suggests good practices to be used during the process.

c) It shows the phases of the model over time.

1 Answer

Answer :

a) It shows the process activities that are enacted.

Related questions

Description : RUP stands for created by a division of a) Rational Unified Program, IBM b) Rational Unified Process, Infosys c) Rational Unified Process, Microsoft d) Rational Unified Process, IBM

Last Answer : d) Rational Unified Process, IBM

Description : Which phase of the RUP is used to establish a business case for the  system? a) Transition b) Elaboration c) Construction d) Inception

Last Answer : d) Inception

Description : Constantine suggests four “organizational paradigms” for  engineering teams. The best project team organizational model to use when handling extremely complex problems is  a. Random paradigm b. Open paradigm c. Synchronous paradigm d. Closed paradigm

Last Answer : a. Random paradigm

Description : Walter’s Model suggests that a firm can always increase the value of the share by: A. Increasing dividend B. Decreasing dividend C. Constant Dividend D. None of the

Last Answer : D. None of the

Description : ER model shows the (A) Static view. (B) Functional view. (C) Dynamic view. (D) All the above.

Last Answer : (A) Static view.

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Cost controls can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on  an on-going basis.

Last Answer : 4. The process of gathering, accumulating, analyzing, reporting, and managing the costs on  an on-going basis.

Description : Cost budgeting can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on an on- going basis

Last Answer : 3. The process of establishing budgets, standards, and a monitoring system by which the  investment cost of the project can be measured and managed

Description : "To understand communication in a meeting, we need to investigate the roles, personalities and values of every participant, as well as review the minutes taken and actions resulting from previous meetings." Which ... here? (a) Socio-phychological ; (b) Cybernetic ; (c) Psychosocial ; (d) Pragmatic

Last Answer : ; (d) Pragmatic

Description :  According to PMBOK, project management process groups are iterative, which  was originally defined by Walter Shewhart and later modified by Edward Deming.  Generally, one outcome from a previous process can serve ... -Do-Check-Act cycle c. Project phases d. PM processes e. HR process cycle

Last Answer : b. Plan-Do-Check-Act cycle

Description : The project closing process is essential to overall project planning. What is considered one of  the most important steps in closing the project? 1. Insuring that plans are produced to implement ... .  3. Transition the lease of equipment to the owner  4. Satisfying the contractual obligations

Last Answer : 4. Satisfying the contractual obligations

Description : Boehm suggests an approach that addresses project objectives,  milestones and schedules, responsibilities, management and  technical approaches and required resources, This principle is  called as . a. W3HH principle b. WHO principle c. W5HH principle d. None of the above.

Last Answer : c. W5HH principle

Description : )In a program or project plan, there are always revisions to account for new or missing data.  Which one of the following provides the best reason for performing a revision of the plan? 1. ... 4. Historical data on a similar project suggests that risk events are not included in the current  plan.

Last Answer : 2. Project tasks are crashed to meet their end dates

Description : One of the reasons a project life cycle is split into phases is to: a. facilitate formal go/no-go decision making during the project. b. balance the costs of work in each phase of ... the major deployments of resources throughout the project. d. chunk work into time periods of similar durations.

Last Answer : a. facilitate formal go/no-go decision making during the project.

Description : One of the reasons a project life cycle is split into phases is to:  a. facilitate formal go/no-go decision making during the project.  b. balance the costs of work in each phase ... the major deployments of resources throughout the project.  d. chunk work into time periods of similar durations.

Last Answer : a. facilitate formal go/no-go decision making during the project.

Description : The resource-based perspective suggests that unique firm resources should be the starting point for developing successful strategies a) the business opportunity should be the starting point for ... nor unique firm resources should be the starting point for developing successful strategies.

Last Answer : unique firm resources should be the starting point for developing successful strategies.

Description : From a contract management perspective, the project manager must consider the: 1. acquisition process 2. contract administration  3. ecological environment  4. offer, acceptance, and consideration  5. a and b

Last Answer : 5. a and b

Description : From HR perspective, the project manager's responsibility in the planning role includes: 1. Hiring the team  2. Developing work schedules 3. Forecasting  4. Feedback sessions  5. Both b and c

Last Answer : 5. Both b and c

Description : Dynamic approach to teaching means (A) Teaching should be forceful and effective (B) Teachers should be energetic and dynamic (C) The topics of teaching should not be static, but dynamic (D) The students should be required to learn through activities

Last Answer : (D) The students should be required to learn through activities

Description :  During a new project planning process to sequence activities, the project  manager, Nate, decides to use the precedence diagraming method to show the  identified activity dependencies. Which of the following logical ... -finish c. Finish-to-finish d. Start-to-start e. All of these answers

Last Answer : b. Start-to-finish

Description : Leontief”s model explains a----- equilibrium. (a) static (b) dynamic © both static and dynamic (d) none of the above

Last Answer : (a) static

Description : The ____ of project closeout the assessment is to document the best practices and  lessons learned for use on future projects.

Last Answer : Ans. Primary purpose

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : The phases of a project life cycle are: a. starting, planning, control and closing. b. concept, definition, development, handover and closure. c. initiation, definition, planning, monitoring and operations. d. concept, definition, implementation and operations.

Last Answer : b. concept, definition, development, handover and closure.

Description : Which one of the following is captured in the Work Breakdown Structure (WBS)? a. The life cycle phases. b. The logical order of tasks. c. The scope of the project. d. Project costs.

Last Answer : c. The scope of the project.

Description : Project cycle is a collection of generally sequential project phases whose description and  order of occurrence are determined by the control needs of the organisation or  organisations involved in the project. (True/False)

Last Answer : Ans. True

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : Which one of the following is captured in the Work Breakdown Structure (WBS)?  A.The life cycle phases  B.The logical order of tasks  C.The scope of the project  D. Project costs

Last Answer : C.The scope of the project

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : To identify the tasks for a work plan the project manager can _____.  a. control and direct the project  b. estimate the size, staff the project, and remember technical skills  c. establish a ... of the SDLC and the steps that occur in each  e. set conservative numbers for the project software

Last Answer : d. list the four phases of the SDLC and the steps that occur in each

Description : The phases of a project life cycle are:  a. starting, planning, control and closing.  b. concept, definition, development, handover and closure.  c. initiation, definition, planning, monitoring and operations.  d. concept, definition, implementation and operations.

Last Answer : b. concept, definition, development, handover and closure.

Description : Which one of the following is captured in the Work Breakdown Structure (WBS)?  a. The life cycle phases.  b. The logical order of tasks.  c. The scope of the project.  d. Project costs

Last Answer : c. The scope of the project.

Description : A planning method, which provides details of the work to accomplish, but also provide some  preliminary description of the work to be done in later phases is called : 1. Progressive detailing  2. Rolling wave  3. Strategic  4. Operational

Last Answer : 2. Rolling wave

Description : In which of the following project phases is the project schedule developed? 1. Conceptual  2. Planning  3. Implementation  4. Design

Last Answer : 2. Planning

Description : Explain The Phases Of Software Project?

Last Answer : The different phases of software projects are follows: Initiation: Preparing scope document, requirement documents, Estimation chart, project plan and proposal documents. Planning: Designing test ... establishing change management procedure. Closure: Closing project and move it to maintenance mode.

Description : What Are The Different Phases Of Sdlc?

Last Answer : SDLC - stands for Software Development Life Cycle. It can be divided in to 7 phases they are: 1. Preliminary Investigation (Feasibility Study). 2. Requirement Analysis (Analysis). 3. Design of the System. 4. Software Construction. 5. System Testing. 6. System Implementation. 7. System Maintenance.

Description : Which is considered as an emerging industry best practice for dealing with dynamic and loosely coupled trust relationships in the collaboration model of an organization in Identity and Access management a) Identity federation b) Cloud federation c) Security federation d) None of the above

Last Answer : Identity federation

Description : The review of the successes and the mistakes is normally held during _____ phase. (A) initiation (B) planning (C) execution (D) closure

Last Answer : (D) closure

Description : A ____ is a set of activities which are networked in an order and aimed towards achieving the goals of a project. (A) Project (B) Process (C) Project management (D) Project cycle

Last Answer : (A) Project

Description : Which one of the following statements best defines procurement? a. A technique to establish the best approach for obtaining the resources for the project. b. A group of interrelated resources and ... product. d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description :  Which of the following is the most important element of Project Management Plan that is useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : A is a set of activities which are networked in an order and  aimed towards achieving the goals of a project. (A)Project (B)Process (C)Project management (D)Project cycle

Last Answer : (A)Project

Description : Choose the correct option according to given below  statement. Statement 1: Umbrella activities are independent of any one framework activity and occur throughout the process. Statement 2: quality assurance, ... . c. Only statement 3 is correct. d. Statement 1 and statement 3 are correct

Last Answer : b. Statement 1 and statement 2 are correct.

Description : The methods and regulation used to define goals, plan and monitor tasks and resources, identify and resolve issues, and control costs and budgets for a specific project is known as … a. project management. b. Process Management c. Process d. Activities

Last Answer : a. project management.

Description : Which of the following is the most important element of Project Management Plan that is  useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : Which one of the following statements best defines procurement?  a. A technique to establish the best approach for obtaining the resources for the project.  b. A group of interrelated resources and ... product.  d. The process by which products and services required for the project are acquired.

Last Answer : d. The process by which products and services required for the project are acquired.

Description : A is a set of activities which are networked in an order and aimed towards achieving the goals of a project. A. Project B. Process C. Project management D. Project cycle

Last Answer : A. Project

Description : The network diagram is the best tool for demonstrating:  A. Schedule variances B. Resource requirements C. The sequence of project activities  D. Schedule performance over time

Last Answer : C. The sequence of project activities

Description : The _____ is a dynamic schedule that logs and monitors all of the tasks that need to be  accomplished for the length of the project.  a. margin of error  b. project manager  c. project objective d. timebox  e. work plan

Last Answer : e. work plan

Description : Mathematical models using linear, dynamic, integer, or algorithm models are  considered  A. Project selection criteria B. A form of expert judgment C. Project selection methods D. A form of historical information

Last Answer : C. Project selection methods