A drawee is need to be given a deliberation of  
A. 24 hrs
B. 48 hrs
C. 72hrs
D. 10 days

1 Answer

Answer :

B. 48 hrs

Related questions

Description : Notice of dishonour must be given A. To the drawer and drawee only B. To the drawer, acceptor and endorser(s) only C. To all the parties liable on the instrument or to their duly ... agent D. To all the parties who are secondarily liable on the instrument or to their duly authorized agent

Last Answer : D. To all the parties who are secondarily liable on the instrument or to their duly authorized agent

Description : In case of insolvency of a drawee, a bill should be presented for acceptance to the A. Official receiver B. Acceptor for honour C. Drawee incase of need

Last Answer : A. Official receiver

Description : A minor cannot be a______________ of the instrument A. Drawer B. Drawee C. Payee D. Acceptor

Last Answer : C. Payee

Description : The request information should normally be made within  a) 48 Hrs b) 24 Hrs c) 30 days d) 45 days

Last Answer : c) 30 days

Description : The information sought for concerns the life or liberty of a person, the same shall  be provided within_____ of receipt of the application. a) 48 Hrs b) 24 Hrs c) 72 Hrs d) At the same time

Last Answer : a) 48 Hrs

Description : The provisions of environmental protection in the constitution were made under: A. Article 5-A B. Article 21-B C. Article 27-B (h) D. Article 48-A and Article 51-A (g)

Last Answer : D. Article 48-A and Article 51-A (g)

Description : The functions of Central Board are given under: A. Section 16 B. Section 19 C. Section 25 D. Section 24

Last Answer : A. Section 16

Description : Why is the side walk on this side bone dry, and on the other side snow from 48 or so hrs ago?

Last Answer : Sunlight blocked on other side?

Description : Fertilisation in humans is practically feasible only if (a) the ovum and sperms are transported simultaneously to ampullary-isthmic junction of the cervix (b) the sperms are transported ... the ovum and sperms are transported simultaneously to ampullary-isthmic junction of the fallopian tube.

Last Answer : (d) the ovum and sperms are transported simultaneously to ampullary-isthmic junction of the fallopian tube.

Description : If the Prime Minister is a member of the Rajya Sabha - (1) He/she has to get elected to the Lok Sabha within 6 months (2) He/she can declare the government's policies only in the Rajya ... of no confidence is under consideration (4) He/she cannot take part in the budget deliberation in the Lok Sabha

Last Answer : (3) He/she cannot take part in the voting when a vote of no confidence is under consideration Explanation: He/she cannot take part in the voting when a vote of no confidence is under consideration.

Description : A process that involves continuously improving and detailing a plan as more detail become  available is termed as (A) project analysis (B) project enhancing (C) progressive deliberation (D) progressive elaboration

Last Answer : (D) progressive elaboration

Description : Which agent enables the deliberation about the computational entities and actions? a) Hybrid b) Reflective c) Relational d) None of the mentioned

Last Answer : b) Reflective

Description : Praneetha and Pooja together can do a piece of work in 24 days ,which pooja and priya can do in 32 days. After praneetha has been working at it for 10 days and pooja for 14 days, Priya finishes it in 26 days. In how many days Priya alone will do the work? a) 12 days b) 24 days. c) 48 days d) 50 days

Last Answer : C Praneetha's 10 day's work + Pooja 14 day's work + Priya's 26 days work = 1 (Praneetha's +pooja's) 10 day's work + (pooja + priya)'s 4 day's work +priya's 22 days work = 1 =>10/24 + 4/32 + priya' ... 13/24 =11/24 Priya's 1 day's work = 11/24 * 1/22 =1/48 Priya can finish the work in 48 days.

Description : In man, the amount of calcium in gms filtered in 24 hrs period by the renal glomeruli is (A) 5 (B) 10 (C) 15 (D) 20

Last Answer : Answer : B

Description : The earth completes one rotation on its axis in : (1) 23 hrs. 56 min. 4.9 sec (2) 23 hrs. 10 min. 2 sec (3) 23 hrs. 30 min. (4) 24 hrs.

Last Answer : (1) 23 hrs. 56 min. 4.9 sec Explanation: The Earth rotates around its axis once in about 24 hours with respect to the sun and once every 23 hours 56 minutes and 4 seconds with respect to the stars. The Earth rotates from the west towards east. Seasons are caused by Earth's rotation around its axis.

Description : The fertilized eggs of Catla take about _ to _ hrs for hatching at 30°C (a) 10 to 12 (b) 12 to 14 (c) 14 to 18 (d) 18 to 24

Last Answer : (d) 18 to 24

Description : The earth completes one rotation on its axis in : (1) 23 hrs. 56 min. 4.9 sec (2) 23 hrs. 10 min. 2 sec (3) 23 hrs. 30 min. (4) 24 hrs.

Last Answer : 23 hrs. 56 min. 4.9 sec

Description : 2 male, 6 female, and 8 girls can do a work in 192 hrs, 4 male and 16 girls can do it in 160 hrs, 4 male and 6 female can do it in 240 hrs.10 male and 24 girls can do it in. a) A.87 3/ 11 hrs b) B.78 4 /11 hrs c) C.88 6 /12 hrs d) 80 4 /5 hrs

Last Answer : A Let 1 males 1 hr work = x 1 female 1 hour work = y 1 girl 1 hour work = z Then 2x + 6y + 8z = 1/192 ------>1 4x + 16z = 1/160 --------->2 4x + 6y = 1/240 ------------->3 Adding 2 and ... 1/192 + 1/160 =(5+6) / 960 = 11/960 10 male and 24 girls can do work in 960/11 hrs i.e., 87 3 /11 hrs

Description : two pipes X and Y can fill a cistern in 18 hrs and 24 hrs respectively. If both the pumps are opened simultaneously. How much time will be taken to fill the cistern? A) 10hrs 50mints B) 10 hrs 5mints C) 10hrs 17mints D) 10hrs 44mints

Last Answer : C Part filled by x in 1hour = 1/18 Part filled by y in 1 hour = 1/24 Part filled by (x+y) in 1 hour = 1/18 + 1/24 =>4+3/72 =>7/72 The cistern will be full in 72/7 hrs = 10 hrs 17mins.

Description : Minutes should be recorded within _________ days from the date of conclusion of every meeting A. 10 B. 20 C. 30 D. 40

Last Answer : C. 30

Description : With reference to a cheque which of the following is the „drawee bank‟ ? A. The bank that collects the cheque B. The payee‘s bank C. The endorser‘s bank D. The bank upon which the cheque is drawn

Last Answer : D. The bank upon which the cheque is drawn Explanation: Drawee is a legal and banking term used to describe the party that has been directed by the depositor to pay a certain sum of money to the person presenting the check or draft. A typical example is if you are cashing a paycheck.

Description : When a customer deposits cheque to a bank, the bank is a(n) A. Drawer B. Agent C. Principal D. Drawee E. Bailee

Last Answer : B. Agent Explanation: When a customer deposits cheque to a bank then that particular bank acts as an agent for the customer. Collection occurs when the drawee bank (the bank ordered by the cheques ... of the drawer (its customer who has written the cheque) and presents it to the collecting bank.

Description : _______ is a cheque that is not crossed on the left corner and payable at the counter of the drawee bank on presentation of the cheque. A. Crossed Cheque B. Open Cheque C. General Crossing D. Restrictive Crossing E. None of the Above

Last Answer : B. Open Cheque Explanation: An open cheque is a cheque that is not crossed on the left corner and payable at the counter of the drawee bank on presentation of the cheque.

Description : The Consumer protection act 1986 enacted in A. 24 Oct 1986 B. 24 Oct 1987 C. 24 Aug 1986 D. 15 June 1986

Last Answer : A. 24 Oct 1986

Description : Satish, Goel and Khan can do a particular job in 24,36 and 48 days respectively. If they start working together and are paid ₹ 5200 for their work, th

Last Answer : Satish, Goel and Khan can do a particular job in 24,36 and 48 days respectively. If they ... 5200 for their work, then find their individual shares.

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days

Last Answer : ANSWER: C

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days

Last Answer : ANSWER: C

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days 27

Last Answer : ANSWER: C

Description : The Earth takes about _________ to complete one rotation around its axis. A. 48 hours B. One month C. 24 hours D. 365 days

Last Answer : ANSWER: C

Description : The symptoms of salmonellosis usually last about a. 24 hours. b. 48 hours. c. 5 days. d. 14 days.

Last Answer : b. 48 hours.

Description : The symptoms of salmonellosis usually last about a. 24 hours. b. 48 hours. c. 5 days. d. 14 days.

Last Answer : a. 24 hours.

Description : For walls, columns and vertical faces of all structural members, the form work is generally removed after (A) 24 to 48 hours (B) 3 days (C) 7 days (D) 14 days

Last Answer : Answer: Option A

Description : 48 boys complete a work in 36 days. After they have worked for 24 days, 24 more boys join them. How many days will they take to complete the remaining work? a) 8 days b) 6 days c) 4 days d) 3 days

Last Answer : A 1 boy’s 1 day’s work = 1/(36*48) =1/1728 48 boy’s 24 day’s work=48*24/1728=2/3 Remaining work = 1-2/3=1/3 72 boy’s 1 day’s work =72/1728=1/24 1/24 work is done by them in 1 day. So, 1/3 work is done by them in 24/3= 8 days

Description : If 24 women and 32 girls can do a piece of work in 5 days; 26 women and 48 girls can do it in 4 days then the ratio of the daily work done by a women to that of a girl is. a) 2:1 b) 1:3 c) 3:1 d) 1:2

Last Answer : A Let 1 women's 1 day work = x 1 girl's 1 day work = y Then 24x+32y = 1/5 =>6x+8y = 1/20 ------->1 26x + 48y = 1 / 4 => 13x + 24y = 1/8 -------->2 Multiply 1 by 3 18x + 24y = 3/20 13x + ... 200 = (10 - 6)/ 200 = 4/200 8y = 1/50 Y=1/400 Required ratio = x:y = 1/200: 1/400 =400:200 =2:1

Description : A sum of amount of money is adequate to pay peter’s salary for 42 days and Harish’s salary for 56 days. The same money is adequate to pay the salary of both for. a) 12 days b) 24 days c) 36 days d) 48 days

Last Answer : B Let the total money be Rs.x Peter’s 1 day salary = Rs. x/42 Harish 1 day salary = Rs. x/56 (peter+harish)’s 1 day salary = Rs(x/42+x/56) =(4x+3x)/168 =7x/168 =x/24 Money is adequate to pay the salary of both for 24 days.

Description : X,Y and Z can do a certain job in 72,108 and 144 days respectively. They started the job but X left 16 days before the completion of the job while Y left 24 days before the completion. The number of days for which Z worked is. a) 12 days b) 24 days c) 36 days d) 48 days

Last Answer : D Suppose the work was finished in a' days Then X's (a - 16) day's work + Y's (a - 24) days + Z's a days work = 1 (a-16)/72 + (a-24)/108 + a/144 =1 lcm of 72,108,144 is 432 (6(a-16) + 4( ... = 432 6a - 96 +4a - 96 =3a = 432 13a - 192 = 432 13a = 624 => a =48 Therefore Z worked in 48 days.

Description : Can your vision become blurred 24/7 from 9 hrs a day on the computer?

Last Answer : Yeah, at least for a while. Has happened to me.

Description : How come biblical literalists are sure day means 24 hrs. but week means 6.8993839 years?

Last Answer : answer:2 Peter 3:8 But do not forget this one thing, dear friends: With the Lord a day is like a thousand years, and a thousand years are like a day. With God, time is not a constraint ... of the Virgin Birth or the Resurrection. I will mention that even Atheists often don't agree with each other.

Description : Minimum excretory urinary volume for waste products elimination during 24 hrs is (A) 200–300 ml (B) 200–400 ml (C) 500–600 ml (D) 800 ml

Last Answer : Answer : C

Description : In how many time final grinding should be done of new AT weld ? (i) Just after the welding (ii) After 8 hrs of welding (iii) With in 24 hrs* (iv) None of the above

Last Answer : iii) With in 24 hrs*

Description : In how many time rough riding should be done of new AT weld ? (i) Just after the welding* (ii) After 8 hrs of welding (iii) After 24 hrs (iv) None of the above

Last Answer : i) Just after the welding*

Description : Which of the following is not true for Geostationary Satellite? (1) Its time period is 24 hrs (2) Its angular speed is equal to that of earth about its own axis (3) It is fixed in space (4) It revolves from west to east over the equator

Last Answer :  It is fixed in space

Description : Adam and Smith are working on a project. Adam takes 18 hrs to type 108 pages on a computer, while Smith takes 15 hrs to type 120 pages. How much time will they take, working together on two different computers to type a ... ? a) 23 hrs 24 min b) 45 hrs 42 min c) 25 hrs 42 min d) 42 hrs 45 min

Last Answer : C Number of pages typed by Adam=108 Number of pages typed by Adam in 1 hour = 108/18=6 Number of pages typed by Smith =120 Number of pages typed by Smith in 1 hour = 120/15 =8 Number of pages typed by both in ... (6 + 8) = 14 Time taken by both to type 360 pages, = (360 * 1/14) =25 hrs 42 min

Description : A 1800 km journey of 24 hrs, if 360km is done by van and the rest by train. It takes 60 mins more, if 600km is done by van and the rest by train. The ratio of the speed of the van to that of the train is. a) 2:4 b) 4:3 c) 3:4 d) 5:3

Last Answer : C Let the speed of the van be x km/hr And that of the train be y km/hr 360/x+1440/y = 24 --------------->A Dividing by 24 on both sides 15/x+60/y = 1 ---------1 And 600/x +1200/y =25 Dividing by ... 720/y =9 Y=80 Put y value in A 360/x = 24-18 X=360/6 X=60 Ratio of speeds = 60:80 = 3:4

Description : The average speed of a bus in the upward journey is 50% more than that in the return journey. The bus halts for 2 hrs on reaching the destination. The total time taken for the complete to and from trip is 34 hrs ... speed of the bus in the upward journey is. a) 63.24 b) 65.67 c) 63.49 d) 62.49

Last Answer : D Let the speed in return journey be x km/hr Then speed in upward journey = 150 /100 x = (3/2 x)km/hr Average speed = (2*3x/2*x) / (3x/2 +x) =3x2 / (5x/2) =6x2 / 5x =6x/5 km/hr Therefore (1600 ... 192x = 8000 X = 41.66 Speed in upward journey = (3/2 x ) km/hr =(3/2*41.66) =62.49 km/hr 

Description : Two pipe P & Q fill a tab in 5 hrs and 20 hrs respectively. If both the pipes are open then due to the leakage, it took 30mins more to fill the tab. If the tab is full, how long will it take for the leakage alone to empty the tank? A) 28 B) 24 C) 36 D) 12

Last Answer : C Part filled by(P+Q) in 1 hr = 1/5 + 1/20 = ¼ So P & Q together can fill the tank in 4 hrs. Work done by the leak in 1 hr = 1 / 4 - 2/9 Leak will empty the tank in 36 hrs.

Description : Two pipes can fill a dumper in 8 hours and 24 hours .If two pipes are operate simultaneously, In how much time will the dumper be filled ? A) 3 hrs B) 4 hrs C) 8 hrs D) 6 hrs

Last Answer : D (A+B) =1/8 + 1/24 => (3+1)/24 => 4/24 =>1/6 6 hrs to filled the dumper

Description : A motorboat running upstream takes 4 hrs 24 mins to cover a certain distance, while it takes 2hrs to cover the same distance running downstream. What is the ratio between the speed of the boat and speed of the water current respectively? A) 8:3 B) 5:2 C) 3:7 D) 2:4

Last Answer : ANSWER : A Explanation: Let the man's rate upstream be x'km/hr and downstream be y'km/hr Then distance covered upstream by 4hrs 24mints = distance covered by downstream in 2hrs (x * 4 2/5) = y *2 22x/5 = 2y Y = ... = (y+x/2) : (y -x/2) = 16x/10 : 6x/10 = 16x : 6x = 8:3

Description : Faucet 'P' can fill the tank completely in12 hrs while faucet'q' can empty it by 24 hrs. By mistake, Anitha forgot to close the faucet q', As a result, both the faucet remained open. After 8 hrs, faucet realized the ... '. In how much time now onwards, would the tank be full? A) 4 B) 8 C) 12 D) 16 

Last Answer : Answer: B Explanation: Faucet P can fill the tank completely in 12 hours => In 1 hour, Faucet P can fill 1/12of the tank Faucet q can empty the tank completely in 24 hours => In 1 hour, Faucet q can empty ... tank. Time taken to fill the remaining (1−1/3)=2/3of the tank =(2/3)/(1/12) = 8 hours

Description : For the purpose of attracting the provisions of section 138 of the Negotiable Instruments Act, 1881, a cheque has to be presented to the bank A. Within a period of six months B. Within a period of six ... . Within a period of 15 days from the date on which it is drawn D. None of the above.

Last Answer : B. Within a period of six months from the date on which it is drawn or within the period of its validity, whichever is earlier