61. If a non-redundant constraint is removed from an LP problem then
a. Feasible region will become larger
b. Feasible region will become smaller
c. Solution will become infeasible
d. None of the above

1 Answer

Answer :

a. Feasible region will become larger

Related questions

Description : 62. If one of the constraint of an equation in an LP problem has an unbounded solution, then a. Solution to such LP problem must be degenerate b. Feasible region should have a line segment c. Alternative solutions exists d. None of the above

Last Answer : b. Feasible region should have a line segment

Description : 58. While solving a LP model graphically, the area bounded by the constraints is called a. Feasible region b. Infeasible region c. Unbounded solution d. None of the above

Last Answer : a. Feasible region

Description : 52. If an iso-profit yielding the optimal solution coincides with a constraint line, then a. The solution is unbounded b. The solution is infeasible c. The constraint which coincides is redundant d. None of the above

Last Answer : d. None of the above

Description : 54. A constraint in an LP model becomes redundant because a. Two iso-profits may be parallel to each other b. The solution is unbounded c. This constraint is not satisfied by the solution values d. None of the above

Last Answer : d. None of the above

Description : 55. If two constraints do not intersect in the positive quadrant of the graph, then a. The problem is infeasible b. The solution is unbounded c. One of the constraints is redundant d. None of the above

Last Answer : a. The problem is infeasible

Description : 64. If the feasible region of a LPP is empty, the solution is _______ a. Infeasible b. Unbounded c. Alternative d. None of the above

Last Answer : a. Infeasible

Description : 60. While solving a LP problem, infeasibility may be removed by a. Adding another constraint b. Adding another variable c. Removing a constraint d. Removing a variable

Last Answer : c. Removing a constraint

Description : 49. A feasible solution to an LP problem a. Must satisfy all of the problem’s constraints simultaneously b. Need not satisfy all of the constraints, only some of them c. Must be a corner point of the feasible solution d. Must optimize the value of the objective function

Last Answer : a. Must satisfy all of the problem’s constraints simultaneously

Description : 48. The graphical method of LP problem uses a. Objective function equation b. Constraint equations c. Linear equations d. All of the above

Last Answer : d. All of the above

Description : . Non-negativity condition in an LP model implies a. A positive coefficient of variables in objective function b. A positive coefficient of variables in any constraint c. Non-negative value of resources d. None of the above

Last Answer : d. None of the Above

Description : 59. Alternative solutions exist of an LP model when a. One of the constraints is redundant b. Objective function equation is parallel to one of the constraints c. Two constraints are parallel d. All of the above

Last Answer : b. Objective function equation is parallel to one of the constraints

Description : 57. The solution space(region) of an LP problem is unbounded due to a. An incorrect formulation of the LP model b. Objective function is unbounded c. Neither a nor b d. Both a & b

Last Answer : b. Objective function is unbounded c. Neither a nor b

Description : 29. A constraint in an LP model restricts a. Value of objective function b. Value of a decision variable c. Use of the available resources d. All of the above

Last Answer : d. All of the above

Description : 50. Which of the following statements is true with respect to the optimal solution of an LP problem? a. Every LP problem has an optimal solution b. Optimal solution of an LP problem always occurs ... completely used d. If an optimal solution exists, there will always be at least one at a corner

Last Answer : d. If an optimal solution exists, there will always be at least one at a corner

Description : If the feasible region of a linear programming problem is empty, the solution is .................... a. Unbounded b. Infeasible c. Infeasible d. Alternative

Last Answer : b. Infeasible

Description : When at least one of the basic variables is zero, then the basic feasible solution to a Linear Programming Problem is said to be .............................. a. Infeasible b. Unbounded c. Degenerate d. Non-degenerate

Last Answer : c. Degenerate

Description : If in a LPP, the solution of a variable can be infinity large without violating the constraints, the solution is ___ a. Infeasible b. Unbounded c. Alternative d. None of the above

Last Answer : b. Unbounded

Description : . In simplex algorithm, which method is used to deal with the situation where an infeasible starting basic solution is given? a. Slack variable b. Simplex method c. Big M Method d. None of the above

Last Answer : b. Simplex method

Description : All the constraints are expressed as equations and the right hand side of each constraint and all variables are non-negative is called_______ a. Canonical variable b. Canonical form c. Canonical solution d. Both a & b

Last Answer : b. Canonical form

Description : When a particular assignment in the given problem is not possible or restricted as a condition, it is called a __ problem a. Infeasible b. Degenerate c. Unbalanced d. Prohibited

Last Answer : d. Prohibited

Description : A basic solution which also satisfies the condition in which all basic variables are non-negative is called ___ a. Basic feasible solution b. Feasible solution c. Optimal solution d. None of the above

Last Answer : a. Basic feasible solution

Description : 65. Any feasible solution which optimizes (minimizes or maximizes) the objective function of the LPP is called as _______ a. Optimal solution b. Non-basic variables c. Solution d. Basic Feasible solution

Last Answer : a. Optimal solution

Description : A basic feasible solution of a linear programming problem is said to be ............... if at least one of the basic variable is zero. (A) degenerate (B) non-degenerate (C) infeasible (D) unbounded

Last Answer : (A) degenerate 

Description : 56. Constraints in LP problem are called active if they a. Represent optimal solutions b. At optimality do not consume all the available resources c. Both a & b d. None of the above

Last Answer : a. Represent optimal solutions

Description : 37. Which of the following is not a characteristics of the LP a. Resources must be limited b. Only one objective function c. Parameters value remains constant during the planning period d. The problem must be of minimization type

Last Answer : d. The problem must be of minimization type

Description : 27. The mathematical model of an LP problem is important because a. It helps in converting the verbal description & numerical data into mathematical expression b. Decision-makers prefer to ... captures the relevant relationship among decision factors d. It enables the use of algebraic technique

Last Answer : a. It helps in converting the verbal description & numerical data into mathematical expression

Description : 51. An iso-profit line represents a. An infinite number of solutions all of which yield the same profit b. An infinite number of solutions all of which incurs the same cost c. An infinite number of optimal solutions d. A boundary of the feasible region

Last Answer : . An infinite number of solutions all of which yield the same profit

Description : 30. The distinguishing feature of an LP model is a. Relationship among all variables is linear b. It has single objective function & constraints c. Value of decision variables is non-negative d. All of the above

Last Answer : a. Relationship among all variables is linear

Description : BFS in LPP stands for: a. Best Feasible solution b. Better feasible solution c. Basic feasible solution d. None of the above

Last Answer : c. Basic feasible solution

Description : An optimum solution is considered the _____ among feasible solutions a. Worst b. Best c. Ineffective d. None of the above

Last Answer : b. Best

Description : Consider the following transportation problem: The initial basic feasible solution of the above transportation problem using Vogel's Approximation Method(VAM) is given below: The solution of the ... degenerate solution (B) is optimum solution (C) needs to improve (D) is infeasible solution

Last Answer : (B) is optimum solution

Description : 45. LP is a major innovations since _______ in the field of business decision-making, particularly under conditions of certainty a. Industrial Revolution b. World War I c. World War II d. French Revolution

Last Answer : c. World War II

Description : 40. Which of the following is a limitation associated with an LP model a. The relationship among decision variables is linear b. No guarantee to get integer valued solutions c. No considerations of effect of time & uncertainty on LP model d. All of the above

Last Answer : d. All of the above

Description : 39. Which of the following is an assumption of an LP model a. Divisibility b. Proportionality c. Additivity d. All of the above

Last Answer : d. All of the above

Description : 31. Constraints in an LP model represents a. Limitations b. Requirements c. Balancing limitations & requirements d. All of the above

Last Answer : d. All of the above

Description : While solving a LPP graphically, the area bounded by constraints is called ................. a. Feasible region b. Infeasible region c. Unbounded region d. None of these

Last Answer : a. Feasible region

Description : The second longest path in the network diagram is called a. Alternate b. Feasible c. Sub-critical d. Critical

Last Answer : c. Sub-critical

Description : An objective function which states the determinants of the quantity to be either maximized or minimized is called_______ a. Feasible function b. Optimal function c. Criterion function d. None of the above

Last Answer : b. Optimal function

Description : Operations Research techniques help to find ................... solution. a. Feasible solution b. Infeasible solution c. Optimal solution d. None of these

Last Answer : c. Optimal solution

Description : If in an assignment problem, number of rows is not equal to number of columns then a. Maximization problem b. Problem is unbalanced c. Problem is degenerate d. Optimum solution is not possible

Last Answer : c. Problem is degenerate

Description : An optimal solution of an assignment problem can be obtained only if a. Each row & column has only one zero element b. Each row & columns has at least one zero element c. The data is arrangement in a square matrix d. None of the above

Last Answer : d. None of the above

Description : The purpose of a dummy row or column in an assignment problem is to a. Obtain balance between total activities and total resources b. Prevent a solution from becoming degenerate c. Provide a means of representing a dummy problem d. None of the above

Last Answer : a. Obtain balance between total activities and total resources

Description : If no. of rows are not equal to number of columns and the matrix elements are profit elements then the problem is: a. Balanced and Maximization Transportation problem b. ... Transportation problem c. Balanced and Maximization Assignment problem d. Unbalanced and Maximization Assignment problem

Last Answer : a. Balanced and Maximization Transportation problem

Description : If no. of rows are equal to number of columns and the matrix elements are Time elements then the problem is: a. Balanced and Minimization Transportation problem b. ... Transportation problem c. Balanced and Minimization Assignment problem d. Unbalanced and Minimization Assignment problem

Last Answer : c. Balanced and Minimization Assignment problem

Description : If profit, sales, production, etc is given then it is _________ a. Balanced problem b. Unbalanced problem c. Maximization problem d. Minimization problem

Last Answer : c. Maximization problem

Description : If cost, time, etc is given, then it is ________ a. Balanced problem b. Unbalanced problem c. Maximization problem d. Minimization problem

Last Answer : d. Minimization problem

Description : Maximization problem, then convert into minimization table through _________ a. Row minimization b. Column minimization c. Regret matrix d. Profit matrix

Last Answer : c. Regret matrix

Description : If the number of jobs is not equal to the number of resources, then the problem is term as _____ assignment problem a. Balanced b. Unbalanced c. Equal d. Unequal

Last Answer : b. Unbalanced

Description : If the number of jobs is equal to the number of resources, then the problem is term as _____ assignment problem a. Balanced b. Unbalanced c. Equal d. Unequal

Last Answer : a. Balanced