. In simplex algorithm, which method is used to deal with the situation where an infeasible starting basic
solution is given?
a. Slack variable
b. Simplex method
c. Big M Method
d. None of the above

1 Answer

Answer :

b. Simplex method

Related questions

Description : 66. Which method is an iterative procedure for solving LPP in a finite number of steps? a. Simplex algorithm b. Slack variable c. Big M method d. Simplex method

Last Answer : d. Simplex method

Description : In simplex method, if there is tie between a decision variable and a slack (or surplus) variable, ______ should be selected a. Slack variable b. Surplus variable c. Decision variable d. None of the above

Last Answer : c. Decision variable

Description : In simplex method, we add _______ variables in the case of “=” a. Slack variable b. Surplus variable c. Artificial variable d. None of the above

Last Answer : c. Artificial variable

Description : _____ is another method to solve a given LPP involving some artificial variable? a. Big M method b. Method of penalties c. Two-phase simplex method d. None of the above

Last Answer : a. Big M method

Description : If in a LPP, the solution of a variable can be infinity large without violating the constraints, the solution is ___ a. Infeasible b. Unbounded c. Alternative d. None of the above

Last Answer : b. Unbounded

Description : 64. If the feasible region of a LPP is empty, the solution is _______ a. Infeasible b. Unbounded c. Alternative d. None of the above

Last Answer : a. Infeasible

Description : 61. If a non-redundant constraint is removed from an LP problem then a. Feasible region will become larger b. Feasible region will become smaller c. Solution will become infeasible d. None of the above

Last Answer : a. Feasible region will become larger

Description : 58. While solving a LP model graphically, the area bounded by the constraints is called a. Feasible region b. Infeasible region c. Unbounded solution d. None of the above

Last Answer : a. Feasible region

Description : 55. If two constraints do not intersect in the positive quadrant of the graph, then a. The problem is infeasible b. The solution is unbounded c. One of the constraints is redundant d. None of the above

Last Answer : a. The problem is infeasible

Description : 52. If an iso-profit yielding the optimal solution coincides with a constraint line, then a. The solution is unbounded b. The solution is infeasible c. The constraint which coincides is redundant d. None of the above

Last Answer : d. None of the above

Description : When a particular assignment in the given problem is not possible or restricted as a condition, it is called a __ problem a. Infeasible b. Degenerate c. Unbalanced d. Prohibited

Last Answer : d. Prohibited

Description : At the completion of the forward and backward passes, the slack for an activity is given by the a. Difference between early start and early finish b. Difference between early start and ... c. Difference between latest start and early finish d. Difference between latest start and latest finish

Last Answer : c. Difference between latest start and early finish

Description : In simplex method, ........................ should be selected when there is tie between slack/surplus variable and decision variable. a. Slack variable b. Decision variable c. Surplus variable d. None of these

Last Answer : b. Decision variable

Description : In simplex method, we add .......................... in the case of constraints with sign “=” a. Surplus variable b. Artificial variable c. Slack variable d. None of these

Last Answer : b. Artificial variable

Description : _____ refers to the combination of one or more inputs to produce a particular output a. Solution b. Variable c. Process d. None of the above

Last Answer : c. Process

Description : All the constraints are expressed as equations and the right hand side of each constraint and all variables are non-negative is called_______ a. Canonical variable b. Canonical form c. Canonical solution d. Both a & b

Last Answer : b. Canonical form

Description : A set of values X1,X2……..Xn which satisfies the constraints of the LPP is called_______ a. Solution b. Variable c. Linearity d. None of the above

Last Answer : a. Solution

Description : A basic feasible solution of a linear programming problem is said to be ............... if at least one of the basic variable is zero. (A) degenerate (B) non-degenerate (C) infeasible (D) unbounded

Last Answer : (A) degenerate 

Description : 63. Graphic method can be applied to solve a LPP when there are only ____ variable a. Four b. More than one c. Two d. three

Last Answer : Which oil is used in the floatation method for the purification of ores?

Description : Consider the following transportation problem: The initial basic feasible solution of the above transportation problem using Vogel's Approximation Method(VAM) is given below: The solution of the ... degenerate solution (B) is optimum solution (C) needs to improve (D) is infeasible solution

Last Answer : (B) is optimum solution

Description : BFS in LPP stands for: a. Best Feasible solution b. Better feasible solution c. Basic feasible solution d. None of the above

Last Answer : c. Basic feasible solution

Description : A basic solution which also satisfies the condition in which all basic variables are non-negative is called ___ a. Basic feasible solution b. Feasible solution c. Optimal solution d. None of the above

Last Answer : a. Basic feasible solution

Description : 65. Any feasible solution which optimizes (minimizes or maximizes) the objective function of the LPP is called as _______ a. Optimal solution b. Non-basic variables c. Solution d. Basic Feasible solution

Last Answer : a. Optimal solution

Description : 8. Who defined Operations Research as an aid for the executive in marketing his decisions by providing him with the quantitative information based on the scientific method of analysis? a. C. Kitte b. H.M. Wagner c. E.L. Arnoff d. None of the above

Last Answer : a. C. Kitte

Description : 6. Who defined Operations Research as scientific method of providing executive departments with a quantitative basis for decisions regarding the operations under their control? a. Morse and Kimball (1946) b. P.M.S Blackett (1948) c. E.L. Arnoff and M.J. Netzorg d. None of the above

Last Answer : a. Morse and Kimball (1946)

Description : An assignment problem is a special case of transportation problem, where a. Number of rows equals number of columns b. All rim conditions are 1 c. Values of each decision variable is either 0 or 1

Last Answer : D.variable is either 0 or 1

Description : Which variables are fictitious and cannot have any physical meaning? a. Optimal variable b. Decision variable c. Artificial variable d. None of the above

Last Answer : c. Artificial variable

Description : 60. While solving a LP problem, infeasibility may be removed by a. Adding another constraint b. Adding another variable c. Removing a constraint d. Removing a variable

Last Answer : c. Removing a constraint

Description : 35. Which of the following is not a characteristic of the L P model a. Alternative courses of actions b. An objective function of maximization type c. Limited amount of resources d. Non-negativity condition on the value of decision variable

Last Answer : b. An objective function of maximization type

Description : 29. A constraint in an LP model restricts a. Value of objective function b. Value of a decision variable c. Use of the available resources d. All of the above

Last Answer : d. All of the above

Description : In an LPP, if the solution of a variable can be made infinitely large without violating the constraints, then the solution is .............................. a. Infeasible b. Alternative c. Unbounded d. Unique

Last Answer : c. Unbounded

Description : A situation in a game where, in the payoff matrix, maximin of row is equal to minimax of column is called___ a. Centre point b. Main point c. Saddle point d. Equal point

Last Answer : c. Saddle point

Description : At any iteration of simplex method, if Δj (Zj – Cj) corresponding to any nonbasic variable Xj is obtained as zero, the solution under the test is (A) Degenerate solution (B) Unbounded solution (C) Alternative solution (D) Optimal solution

Last Answer : (C) Alternative solution

Description : The basic difference between PERT and CPM is that a. PERT deals with events and CPM with activities b. Critical Path is determined in PERT only c. Costs are considered on CPM only d. Guessed times are used in PERT and evaluated times in CPM.

Last Answer : a. PERT deals with events and CPM with activities

Description : An optimal solution of an assignment problem can be obtained only if a. Each row & column has only one zero element b. Each row & columns has at least one zero element c. The data is arrangement in a square matrix d. None of the above

Last Answer : d. None of the above

Description : The purpose of a dummy row or column in an assignment problem is to a. Obtain balance between total activities and total resources b. Prevent a solution from becoming degenerate c. Provide a means of representing a dummy problem d. None of the above

Last Answer : a. Obtain balance between total activities and total resources

Description : If in an assignment problem, number of rows is not equal to number of columns then a. Maximization problem b. Problem is unbalanced c. Problem is degenerate d. Optimum solution is not possible

Last Answer : c. Problem is degenerate

Description : An optimum solution is considered the _____ among feasible solutions a. Worst b. Best c. Ineffective d. None of the above

Last Answer : b. Best

Description : 62. If one of the constraint of an equation in an LP problem has an unbounded solution, then a. Solution to such LP problem must be degenerate b. Feasible region should have a line segment c. Alternative solutions exists d. None of the above

Last Answer : b. Feasible region should have a line segment

Description : 57. The solution space(region) of an LP problem is unbounded due to a. An incorrect formulation of the LP model b. Objective function is unbounded c. Neither a nor b d. Both a & b

Last Answer : b. Objective function is unbounded c. Neither a nor b

Description : 54. A constraint in an LP model becomes redundant because a. Two iso-profits may be parallel to each other b. The solution is unbounded c. This constraint is not satisfied by the solution values d. None of the above

Last Answer : d. None of the above

Description : 50. Which of the following statements is true with respect to the optimal solution of an LP problem? a. Every LP problem has an optimal solution b. Optimal solution of an LP problem always occurs ... completely used d. If an optimal solution exists, there will always be at least one at a corner

Last Answer : d. If an optimal solution exists, there will always be at least one at a corner

Description : 49. A feasible solution to an LP problem a. Must satisfy all of the problem’s constraints simultaneously b. Need not satisfy all of the constraints, only some of them c. Must be a corner point of the feasible solution d. Must optimize the value of the objective function

Last Answer : a. Must satisfy all of the problem’s constraints simultaneously

Description : . Operations Research involves _________ attacks of complex problems to arrive at the optimum solution a. Scientific b. Systematic c. Both a & b d. Statistical

Last Answer : c. Both a & b

Description : 16. Operations Research simply helps in improving the ______ of the solution but does not result in a perfect solution a. Quality b. Clarity c. Look d. None of the above

Last Answer : a. Quality

Description : . Operations Research techniques helps to find an ________ by taking into account all the factors a. Ultimate solution b. Alternate solution c. Optimum solution d. Maximise solution

Last Answer : c. Optimum solution

Description : When at least one of the basic variables is zero, then the basic feasible solution to a Linear Programming Problem is said to be .............................. a. Infeasible b. Unbounded c. Degenerate d. Non-degenerate

Last Answer : c. Degenerate

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by employing three time estimates per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by using only one time factor per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique