Pump A can fill the empty bunker in 6 hours, but due to a leak in the bottom it is filled in 7.5 hours, if the bunker is full and then Pump A is closed then in how many hours the leak can empty it? a) 30 hours. b) 45 hours. c) 50 hours. d) 35 hours.

1 Answer

Answer :

A

Efficiency of A = 16.666%

Effective of leak = 13.333%when there is leakage

So, efficiency of leakage =( Efficiency of A- Effective of leak)

=16.666%-13.333%= 3.333%

It means due to leakage a full bunker will be empty in 30 hours.


Related questions

Description : A leak in the bottom of a bunker can empty the full bunker in 4 hrs. An inlet pump fills water at the rate of 3 litres a min. when the bunker is full, the inlet is opened and due to the leak, ... hrs. How many litres does the bunker field? A) 1160 litrs B) 1610 litres C) 2160 litres D) 2610 litres

Last Answer :  C Work done by the inlet in 1 hr = (1/4 – 1/6) = (3-2/12) = 1/12 Work done by the inlet in 1 min = 1/12 * 1/60 = 1/720 Volume of 1/720 part = 3 litres Volume of whole = (720 * 3 )=2160 litres.

Description : A cistern can be filled in 25 minutes. There is a leakage which can empty it in 50 minutes. In how many minutes cistern can be filled? a) 20 mints b) 25mints c) 45 mints d) 50 mints

Last Answer : D Efficiency of filling faucet= 100/25 = 4% ⇒ Efficiency of leakage faucet = 100/50= 2% ⇒ Net filling efficiency = (4-2)% =2% So, t cistern can be filled in = 100/2 = 50 minutes

Description : A dumper is normally filled in 18 hours but takes 6 hours longer to fill because of a leak in the bottom of the dumper. If the dumper is full the leak will empty it in how many hours? A) 76 hours B) 78 hours C) 72 hours D) 74 hours

Last Answer : C Work done by leak in 1 hr=(1/18-1/24) =>4-3/72 =>1/72 Leak will empty the dumper in 72 hours

Description : A Bunker has a leak which would empty the completely filled bunker in 20 hours. If the bunker is full of water and a tap is opened which admits 4 litres of water per minutes in the bunker, how many litres does the bunker holds? A) 2400 B) 4500 C) 4800 D) 7200

Last Answer : C Leak emptied the bunker per hour = 100/20 = 5% of water per hour; Quantity of water emptied per hour = 4*60 = 240; Thus, 5% = 240 liter; Hence, capacity of water, 100% = 240*100/5= 4800 liter.

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : Pipe A usually fills a tank in 2 hours. On account of a leak at the bottom of the tank, it takes pipe A 30 more minutes to fill the tank. How long will the leak take to empty a full tank if pipe A is shut? a) 4 hours b) 3 hours c) 6 hours d) 8 hours e) 10 hours

Last Answer : portion of the tank filled by the pipe A in 1 hour = ½ of the tank let the portion of the tank emptied because of the leak in 1 hour be 1/x of the tank therefore, in 1 hour , portion of the tank filled = 1/2 - 1 ... 1/2 - 1/x = 1/2.5 or x = 10 hence, it takes 10 hours to empty a full tank Answer: e)

Description : A officer undertakes to complete a job in 250 days. He employs 300 male for 50 days and they complete 1/2 of the work . He then reduces the number of male to 100, who work for 120 days, after which there ... male must be employed for the remaining period to finish the work? a) 25 b) 50 c) 45 d) 35

Last Answer : B 300 male in 50 days do = 1/2work 1 male in 1 day does = ½*1/50*1/300 work 100 male in 120 days do = ½ *1/50*1/300 *100*120 =2/5 work Total work done = ½ + 2/5 =(5+4)/10=9/10 ... is done in 50 days by 300 male 1/10 work is done in 60 days by =300*50*1*2/10*60 =50 male

Description : A tank can be filled by an inlet tap at the rate of 8 litres per minute. A leak in the bottom of a tank can empty the full tank in 16 hours. When the tank is full, the inlet is opened and due to ... hours. How many litres does the tank hold? A) 8000 litre B) 9560 litre C) 8525 litre D) 9600 litre

Last Answer : D Part emptied by the leak in 1 hour = 1/16 part filled by (leak & inlet open) in 1 hour = 1/80 Part filled by the inlet tap in 1 hour = 1/16 – 1/80 = 1/20 Inlet tap fills the tank in = 20 hours Inlet tap fills water at the rate of 8 litres a minute. Capacity of tank = 20 * 60 * 8= 9600 litre

Description : Faucet A basically used as inlet pipe and Faucet B is used as outlet pipe. Faucet A and B both are opened simultaneously, all the time. When Faucet A fills the tank and Faucet B empty the tank, it will take thrice the ... efficiency of Faucet A and Faucet B respectively? a) 1:2 b) 2:1 c) 1:3 d) 3:1

Last Answer : B Efficiency when both pipes used to fill = A + B And efficiency when Faucet A is used to fill and Faucet B is used to empty the tank = A-B So (A+B)/(A-B)=3/1 A/B+1/(A/B-1)=3/1 A/B+1=3(A/B-1) 3A/B-A/B=4 2A/B=4 A/B=2 Thus, the ratio of efficiency of Faucet A and B =2:1

Description : Two tap can fill a dumper in 7 hrs and 8 hrs respectively. The taps are opened simultaneously and it is found that due to leakage in the bottom it took 16 mins more to fill the dumper. When the dumper is full, in what time will the leak empty it? A) 56hrs B) 56hrs C) 46hrs D) 36hrs

Last Answer : A Work done by 2 taps in 1 hr = (1/7 + 1/8) = 15/56 Time taken by these taps to fill the dumper = 56/15 hrs =3 hrs 44 mins Due to leakage, time taken = 3 hrs +44mins+16 mins =4hrs Work done by (2 ... the leak in 1 hr = (15/56 - ¼) =15 - 4/56 =1/56 Leak will empty the full cistern in 56 hrs.

Description : A bakery P can sold 500 breads in 4 hours, bakery Q can sold the same number of bread in 5 hrs while bakery R can sold them in 6 hrs. All the bakeries are opened at 8 a.m while bakery P is closed ... complete their target. Approximately at what time will the work be finished? a) 10 b) 8 c) 12 d) 6

Last Answer : A (P+Q+R)'s 1 hour work = (1/4 +1/5+ 1/6) =(15+12+10)/60 =37/60 Remaining work = 1- 37/60 = 23/60 (Q+R)'s 1 hour work = (1/5 +1/6) =11/30 Now 11/30 work is done by Q and R ... R in(30/11*23/60) =23/22 hrs = 1hr So the work will be finished approximately 1 hr after 9.am i.e., around 10 a.m

Description : An electric pump can fill a cistern in 6 hrs. Because of a leak in the cistern it took 7 hrs to fill the cistern. If the cistern is full, how much time will the leak take to empty it? A) 42hrs B) 24hrs C) 32hrs D) 16hrs

Last Answer : A Work done by the leak in 1 hr = [1/6 – 1/7] = 7-6/42 =1/42 Therefore the leak will empty the cistern in 42 hrs.

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : M do a piece of work in 45 days and N can finish it in 40 days. They work together for 5 days and then M leaves. In how many days will N finish the remaining work? a) 30 5/9 b) 29 4/9 c) 31 3/5 d) 29 5/9

Last Answer : A Time taken by M to finish the work = 45 days. M's 1 day's work = 1/45 Time taken by N to finish the work = 40 days. N's 1 day's work = 1/40 (M + N)'s 1 day's work = (1/40+1/45) = ... be done by N in (55/72*40) days = 30and 5/9 days. Hence, the remaining work is done by B in 30 and 5/9 days.

Description : Two taps M and N can alone fill a tank in 80 minutes and 120 minutes respectively. But due to a leakage of tank, it took 12 more minutes to fill the tank. In how many hours, the leak can alone empty the full tank? A) 240 B) 230 C) 248 D) 256

Last Answer : A A and B can fill tank in (1/80 + 1/120) = 1/48 so 48minutes But it took 12 more minutes, this means the tank got full in 48+12= 60 minutes So (1/80 + 1/120 – 1/x) = 1/60 1/X=1/80+1/120-1/60 Solve, x = 240

Description : Rishwi can finish a work in 6 days working 4 hours a day. Dhiviksha can complete the same work in 4 days working 5 hrs a day. If both rishwi and dhiviksha work together, working 4 hrs a day, in how many days can they finished the work? a) 30/11 b) 11/120 c) 11/30 d) 30/13

Last Answer : A Rishwi can complete the work in (6*4) = 24 hrs Dhiviksha can complete the work in (4*5) = 20 hrs Rishwi's 1 hr work = 1/24 Dhiviksh's 1 hr work = 1/20(Rishwi and dhivikasha)'s 1 hr work = (1/24 ... fininsh the work in (120/11)hrs Number of days of 4 hrs each = 120/11*1/4 =120/44 =30/11 days

Description : Two taps can fill a bunker in 40 and 48 mins respectively and a waste tap can empty 6 gallons per minute. All the 3 taps working together can fill the bunker in 30 mind. The capacity of the bunker is. A) 480 B) 480 C) 680 D) 780 

Last Answer : A Work done by the waste tap in 1 min = 1/30 – (1/40 + 1/48) = 8 – (6+5)/240 = 8-11/240 = -3/240 = -1/80 (negative sign means emptying) Volume of 1/80 part = 60 gallons Volume of whole = (6*80) = 480 gallons

Description : A tap can fill a bunker in 4 hours. After half the bunker is filled, three more similar tap are opened. What is the total time taken to fill the bunker completely? A) 3 hours B) 2.5 hours C) 5 hours D) 4.2hours

Last Answer : B In One hour tap can fill = 1/4 Time is taken to fill half of the bunker = 1/2 * 4= 2hours Part filled by four taps in one hour = (4*1/4) = 1 Required Remaining Part = 1/2 Total time = 2+ 1 /2=2.5 hrs

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : P and Q finished a work in 36 days; Q and R can do it in 60 days; P and R can do it in 45 days. In what time can P alone do it. a) 30 days b) 60 days c) 90 days d) 120 days

Last Answer : B (P+Q)'s 1 day work = 1/36 ---1 (Q+R)'s 1 day work = 1/60 ----2 (P+R)'s 1 day work = 1/45 ----3 Adding 1 & 2 & 3 we get 2(P+Q+R)'s 1 day work = 1/36 + 1/60+ 1/45 =(5+3+4)/180 = 12/ ... +R)'s 1 day work - (Q+R)'s 1 days work = 1/30 - 1/60 = 2-1/60 = 1/60 P alone can do the work in 60 days.

Description : 6 boys and 5girls can do a job in 8 days. When 7 boys and 10 girls work on the same job, the work gets completed in 5 days. How many days will a boy take to do the job, if he works alone on it? a) A.25 b) B.50 c) C.75 d) D.100

Last Answer : D Let the amount of work done by a boy in a day be B′ and the amount of work done by a girl in a day be G′. Therefore, 6 boys and 5 girls will do 6B+5G amount of work in a day. If 6 boys and 5 ... 1/100 i.e. a boy does 1/100th of the work in a day. Hence he will take 100 days to do the work.

Description : Nandhu, naren and abishek can do a piece of work in 10,15, and 30 days respectively. In how many days can Nandhu do the work if he is assisted by naren and abishek on alternate days? a) 6.6 days b) 7.5 days c) 8.4 days d) 9.1 days 

Last Answer : B Nandhu's 1 day work = 1/10 Naren's 1 day work = 1/15 Abishek's 1 day work =1/30 Nandhu's 2 day's work =(1/10*2) =1/5 (nandhu + naren+abishek)'s 1 day work = 1/10+1/15+1/30 =3+2+1/30 =6/30 ... +1/5 = 2/5 Now 2/5 work is done in 3 days Whole work will be done in 3 *5/2 = 15/2 = 7.5 days

Description : Pipe A can fill a water tank in 8 hours, Pipe B can fill the same tank in 12 hours and Pipe C can empty the tank in 24 hours. If all three pipes are opened together, in how many hours will the tank be completely filled or empty? a) 4.8 hours b) 5 hours c) 5.4 hours d) 6 hours e) 7.2 hours

Last Answer : If all the three pipes are opened together, in one hour they will fill 1/8 + 1/12 – 1/24 = (3+2-1)/24 = 1/6 part of tank. So, to fill it completely it will take 6 hours. Answer is: d)

Description : 60 girls can do a work in 48 days. 48 boys can finish the same work in 45 days. What is the ratio between the capacity of a boys and girls? a) 2:1 b) 3:6 c) 2:4 d) 4:3

Last Answer : D  Total number of girls =60 Total number of boys =48 (60*48) girls can complete the work in 1 day 2880 girls can complete the work in 1 day 1 girls 1 day work =1/2880 (48*45) boys can complete the work ... day 1 boys 1 day work =1/2160 So required ratio =1/2160 : 1/2880 =2880 : 2160 =4:3

Description : A pipe can fill the tank in 12 hours.Because of a leak in the tank it took 16(1/2) hours to fill the tank.If the tank is full,how much time will the leak take to empty it? A) 18hrs51mins B) 18hrs 20min C) 18hrs 40min D) 18hrs 45min E) None of these

Last Answer : A =>1/12-2/33 = 11-4/132. ==>7/132 =>132/7 hrs =>132/7 hrs=>1131 mins =>18hrs 51min

Description : Adam and Smith are working on a project. Adam takes 18 hrs to type 108 pages on a computer, while Smith takes 15 hrs to type 120 pages. How much time will they take, working together on two different computers to type a ... ? a) 23 hrs 24 min b) 45 hrs 42 min c) 25 hrs 42 min d) 42 hrs 45 min

Last Answer : C Number of pages typed by Adam=108 Number of pages typed by Adam in 1 hour = 108/18=6 Number of pages typed by Smith =120 Number of pages typed by Smith in 1 hour = 120/15 =8 Number of pages typed by both in ... (6 + 8) = 14 Time taken by both to type 360 pages, = (360 * 1/14) =25 hrs 42 min

Description : A task is done by 46 persons not all of them have the same capacity to task. Every day exactly 2 persons, do the task with no pair of persons working together twice. Even after all possible pairs have worked ... in which all the persons together will finish the whole task? a) 44 b) 45 c) 46 d) 47

Last Answer : D 46 persons task in pairs, with no same pair of persons working together. Each person will be working with other 45 which means each persons will work for 45 days in pair. Let the time taken by each ... +1/T46)= 1/47 If all the persons work together they will finish the whole task in 47 days.

Description : Two pipes A and B can fill a tank in 5 and 6hrs.Pipe C can empty it in 12hrs.If all the 3 pipes are opened together,then the tank will be filled in 1)1(13/17)hrs 2)2(8/11)hours. 3)3(9/17)hrs 4)4(1/2)hrs

Last Answer : 3)3(9/17)hrs Exp:Net part filled in 1hr=>(1/5+1/6-1/12)=17/60 Tank filled in=60/17=3(9/17).

Description : 8 men and 8 boys can finish a piece of work in 10 days. 9 women and 7 boys can finish the same work in 10 days. Also 7 men and 6 women can finish the same work in 10 days. In how many days 1man, ... boy can finish the work, at their double efficiency? a) 25 days b) 20 days c) 15 days d) 10 days

Last Answer : A Efficiency of 8 men and 8 boys = 10% Efficiency of 9 women and 7boys = 10% Efficiency of 7 men and 6 women = 10% So, Efficiency of 15 men, 15women and 15boys = 30% So, efficiency of 1 man ... efficiency Efficiency of 1 man, 1 woman and 1 boy = 4% Required number of days = 100/4=25 days

Description : P and Q together can complete a job in 30 days. Q and R together can complete the same job in 40 days. P and R together can complete the same job in 40 days. What is the respective ratio of the number of days taken by P ... R when completing the same job alone? a) A.2:5 b) B.1:2 c) C.3:4 d) D.2:3

Last Answer : B Efficiency of P and Q= 1/30 per day ___________1 ⇒ Efficiency of Q and R = 1/40 per day_________2 ⇒ Efficiency of R and P = 1/40 per day _________3 Taking equation 2 and 3 together ⇒ Q + R = ... 120 days he they work alone. ⇒ Ratio of number of days in which P and R can complete the job 1:2.

Description : P, Q and R together earn Rs.420 per day, while P and R together earn Rs.296 and Q and R together earn Rs.164. The daily earning of R is : a) Rs.50 b) Rs.80 c) Rs.40 d) Rs.60

Last Answer : D (P+Q+R)’s earning = Rs. 420 (P+R)’s earning=Rs 296 (Q+R)’s earning=Rs 164 Q’s daily earning = Rs. (420 ⎯296) = Rs.124 P’s daily earning = Rs. (420 ⎯164) = Rs.236 Now (P+Q)’s earning=Rs 360 R’s daily earning = Rs. [420 ⎯360] = Rs.60

Description : Praneetha and Pooja together can do a piece of work in 24 days ,which pooja and priya can do in 32 days. After praneetha has been working at it for 10 days and pooja for 14 days, Priya finishes it in 26 days. In how many days Priya alone will do the work? a) 12 days b) 24 days. c) 48 days d) 50 days

Last Answer : C Praneetha's 10 day's work + Pooja 14 day's work + Priya's 26 days work = 1 (Praneetha's +pooja's) 10 day's work + (pooja + priya)'s 4 day's work +priya's 22 days work = 1 =>10/24 + 4/32 + priya' ... 13/24 =11/24 Priya's 1 day's work = 11/24 * 1/22 =1/48 Priya can finish the work in 48 days.

Description : Hanisha can do a work in 25 days, while sudha can do the same work in 50 days. They started the work jointly.Few days sughana also joined them and thus all of them completed the whole work in 12 days. All of them were paid total Rs.900. What is the Share of sughana? a) 252 b) 346 c) 454 d).359

Last Answer : A Efficiency of Hanisha = 1/100*25 =25/100=1/4=>4% Efficiency of sudha = 2% Thus, in 12 days working together they will complete only 72% of the work. [(4+2)*12] =72 Hence, the remaining work will ... which is =(100-72)=28% Thus, sughana will get 28% of Rs. 900, =28/100*900 which is Rs.252

Description : Two pipes X and Y can fill a bunker in 24 hours. If only pipe X is open then it would take 12 hours longer to fill the bunker. Find how much longer would it take if only pipe Y is open. A) 46hrs B) 32hrs C) 48hrs D) 34hrs

Last Answer : C  X= 24+12 = 36 X+Y= 1/24 Y= 1/24 – 1/36 = 3-2/72 = 1/72 Y= 72 X alone= 72-24 = 48 HRS

Description : Rakchita can do a piece of work in 28 days, while Shreya can do the same work in 42 days.They started the work together but 6 days before the completion of the work, Rakchita left the work. The total number of days to complete the work is a) 3 b) 4 c) 5 d) 6 

Last Answer : D 6 days before the completion of the work Rakchita left the work means in last 6 days only Shreya has worked alone So, in last 6 days worked done by Shreya = 6*1/42=6/42=1/7 So, the rest = 1-1/7 =6/7 So 6/7work was done by Rakchita and Shreya worked together=6/7*70/10 =420/70=6 days

Description : 24 pumps are connected to a tank. Some of them are inlet pumps and the others are outlet pumps. Each of the inlet pumps an fill the tank in 16hours and each of the outlet pumps can empty the tank completely in ... gets filled in 48 hours. How many inlet pumps are there? A) 16 B) 18 C) 17 D) 14

Last Answer : D (x/16)-[(24-x)/12] = 1/48 x/16-24/48+x/12=1/48 (3+4)x/48=97/48 7x/48=97/48 7x=97 X=14

Description : Four pipes can fill a reservoir in 15, 20, 30 and 60 hours respectively. The first one was opened at 6 AM, second at 7 AM, thir da t 8 AM and the fourth at 9 AM. When will the reservoir be filled ? (A) 11 AM (B) 12 Noon (C) 1 PM (D) 1:30 PM

Last Answer : Answer: C

Description : Three taps P,Q,R can fill a bunker in 3 hrs. After working at it together for 1 hr, R is closed and P,Q can fill the remaining part in 3 hrs. The number of hrs taken by R alone to fill the bunker. A) 9hrs B) 7hrs C) 11hrs D) 5hrs

Last Answer : A  Part filled in 1 hr = 1/3  Remaining part = 1 – 1/3 = 2/3  (P + Q)’s 3 hours work = 2/3  (P+Q)’s 1 hour work = 2/9  R’s 1 hr work = [(P+Q+R)’s 1 hr work – (P+Q)’s 1 hr work]  = 1/3 – 2/9 = 3-2/9 = 1/9  R alone can fill the tank in 9 hours.

Description : A motor bike tyre has two punctures. The 1st puncture alone would have made the tyre flat in 27 minutes and the 2nd alone would have done it in 18 minutes. If air leaks out at a constant rate, how long does it take ... flat? a) 20 4/3 minutes b) 15 4/7 minutes c) 10 4/5 minutes d) 25 4/3 minutes

Last Answer : C 1st puncture made the tyre flat in 27 mins 2nd puncture made the tyre flat in 18 mins 1 minute’s work of both the punctures = (1/27 + 1/18) =(2+3)/54 =5/54 So, both the punctures will make the tyre flat in 54/5 mins =>10 4/5 minutes

Description : If 24 women and 32 girls can do a piece of work in 5 days; 26 women and 48 girls can do it in 4 days then the ratio of the daily work done by a women to that of a girl is. a) 2:1 b) 1:3 c) 3:1 d) 1:2

Last Answer : A Let 1 women's 1 day work = x 1 girl's 1 day work = y Then 24x+32y = 1/5 =>6x+8y = 1/20 ------->1 26x + 48y = 1 / 4 => 13x + 24y = 1/8 -------->2 Multiply 1 by 3 18x + 24y = 3/20 13x + ... 200 = (10 - 6)/ 200 = 4/200 8y = 1/50 Y=1/400 Required ratio = x:y = 1/200: 1/400 =400:200 =2:1

Description : Arul can do a certain work in 9 days while Ravi can do the same work in 7 days. Both of them complete the work together and get Rs.288. what is the share of Arul? a) Rs.124 b) RS.126 c) Rs.128 d) Rs.130

Last Answer : B Arul’s 1 day work = 1/9 Ravi’s 1 day work = 1/7 Arul’s salary : Ravi’s salary = Arul’s 1 day work : Ravi’s 1 day work = 1/9 : 1/7 = 7 :9 Arul’s share = Rs.(7/16 *288) =Rs.126

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : 2 male, 6 female, and 8 girls can do a work in 192 hrs, 4 male and 16 girls can do it in 160 hrs, 4 male and 6 female can do it in 240 hrs.10 male and 24 girls can do it in. a) A.87 3/ 11 hrs b) B.78 4 /11 hrs c) C.88 6 /12 hrs d) 80 4 /5 hrs

Last Answer : A Let 1 males 1 hr work = x 1 female 1 hour work = y 1 girl 1 hour work = z Then 2x + 6y + 8z = 1/192 ------>1 4x + 16z = 1/160 --------->2 4x + 6y = 1/240 ------------->3 Adding 2 and ... 1/192 + 1/160 =(5+6) / 960 = 11/960 10 male and 24 girls can do work in 960/11 hrs i.e., 87 3 /11 hrs

Description : M & N can do a work together in 12 days. M is 2 ½ time as efficient as N. the same work can be done by M alone in. a) 84/5 b) 6/84 c) 82/5 d) 6/82

Last Answer : A M’s 1 day work = 2 ½ = 5/2 N’s 1 day work = 1 Ratio of M and N = 5/2 : 1= 5:2 Let M’s and N’s 1 day work be 5x and 2x respectively. Then 5x+2x = 1/12 7x=1/12 X= 1/(12*7) X=1/84 M’s 1 day work = 1/84 * 5 = 5/84 Hence M alone can finish the work in 84/5 days.

Description : A and B together can complete a work in 24 days. A alone can complete it in 40 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work? a) 24 days b) 15 days c) 21 days d) 19 days

Last Answer : A B’s 1 day’s work = (1/24 -1/40) =(5-3)/120 =2/120=>1/60 Now, (A + B)’s 1 day’s work = (1/40 +1/60) =(3+2)/120 =5/120 So, A and B together will complete the work in 120/5 = 24 days.

Description : M & N do a certain work in 40 days and 24 days respectively. M started the work alone and then after 8 days N joined him till the completion of the work. How long did the work last? a) 16days b) 18days c) 20 days d) 22 days

Last Answer : C Work done by M in 8 days = 1/40*8 =1/5 Remaining work = 1-1/5 = 4/5 (M+N)’s 1 day work = 1/40 + 1/24 =(3+5)/120 =8/120 =1/15 Now 1/15 work is done by M & N in 1 day. So 4/5 work will be done by X and Y is, =15 / 1 * 4/5 =12 days Hence total time taken = 12+8 = 20 days

Description : X does half as much work as Yand Z does half as much work as X and Y together. If Z alone can finish the work in 120 days, then together ,all will finish the work in ? a) 14 1/2 b) 40 c) 24 1/2 d)17 1/3

Last Answer : B Z alone can finish the work in 120 days. As given Z does half as much work as X and Y together => (X + Y) can do it in 60 days (X+ Y)s 1 days wok = 1/60. X's 1 days work : Y's 1 days Work = 1 ... (1/90) + (1/120) =(2+4+3)/360 =9/360 = 1/40 All the three together will finish it in 40 days

Description : Two pumps P & Q can fill a tank in 12 mins and 15 mins respectively while a third pipe R can empty the full tank in 6 mins. P & Q kept open for 5 mins in the beginning and then R is also opened. In what time is tank emptied? A) 30mins B) 35mins C) 40mins D) 45 mins

Last Answer : D Part filled in 5 min = 5(1/12 +1/15) = 5*9/60 = ¾ Part emptied in 1 min when all the pumps are opened, = 1/6 – (1/12 + 1/15) = 1/6 – 3/20 = 1/60 Now 1/60 is part emptied in 1 min Therefore ¾ part will be emptied in 60 * ¾ = 45 mins

Description : 48 boys complete a work in 36 days. After they have worked for 24 days, 24 more boys join them. How many days will they take to complete the remaining work? a) 8 days b) 6 days c) 4 days d) 3 days

Last Answer : A 1 boy’s 1 day’s work = 1/(36*48) =1/1728 48 boy’s 24 day’s work=48*24/1728=2/3 Remaining work = 1-2/3=1/3 72 boy’s 1 day’s work =72/1728=1/24 1/24 work is done by them in 1 day. So, 1/3 work is done by them in 24/3= 8 days

Description :  P and Q undertake to do a piece of job for Rs.1200. P alone can do it in 12 days while Q alone can do it in 16 days. With the help of R , they finish it in 6 days. Find the share of P,Q & R. a) 400,600,200 b) 200,400,600 c) 450,400,250 d) 600,450,150

Last Answer : D R;s 1 day work = 1/6 – (1/12 + 1/16) =1/6 – 1/12 – 1/16 = (8-4-3)/48 = 1/48 P:Q:R = ratio of 1 day work = 1/12:1/16 : 1/48 =4:3:1 P’s share = Rs(1200*4/8) =Rs.600 Q’s share = Rs(1200 * 3/8) =Rs.450 R’s share = Rs(1200 * 1/8) =Rs.150