1 Answer

Answer :

: 18 May 2019.

Related questions

Last Answer : : About 4 thousand.

Last Answer : : 6 thousand 708 crore 81 lakh rupees.

Last Answer : : 26 thousand 793 crore 39 lakh rupees on the main bridge.

Last Answer : : Padma Multipurpose Bridge Project.

Description : Padma The bridge In the project River governance Done How much? Kilometers ?

Last Answer : two On the bank 12 Kilometers.

Description : Padma The bridge In the project Total Expenses How much ?

Last Answer : Original On the bridge 26 Thousands 693 Crores 39 Millions Money.

Description : Padma The bridge In the project River governance Expenses How much ?

Last Answer : answer : Thousands 606 Crores 61 Millions Money.

Description : Padma The bridge In the project Contracted Of the company Name What ?

Last Answer : China Railways Group Ltd.

Last Answer : Length and width of Padma Bridge respectively - 6.15 km. And 16.10 m.

Last Answer : : Date of issuance of work order: November 26 , 2014

Last Answer : : Date of signing the contract: June 18 , 2014.

Last Answer : : The Padma Bridge has occupied the eleventh position as the longest bridge in the world, surpassing the Bangabandhu Bridge.

Last Answer : : With this bridge, the economic growth of the country will increase by 1.2 percent and poverty will be alleviated at the rate of 0.84 percent every year .

Last Answer : : 21 districts of the southern districts will be directly connected by road.

Last Answer : : This two storey bridge will be constructed of concrete and steel.

Last Answer : : Gas , electricity and optical fiber line transport facilities.

Last Answer : : 14 kilometers at both ends.

Last Answer : : 72 feet four lane road.

Last Answer : Padma The bridge Pillar 42 T.

Last Answer : Padma The bridge Budget 30,000 _ _ Crores Money.

Last Answer : Padma The bridge Economic Importance 1 . Every year 1 . 9 Percent At the rate Poverty Decrease Will get 2 . Economic Of growth Rate Will increase 1 . 2 Percent. 3 . Built To be 32 Of the year ... wheel Moving Keep it. 10 . Almost 2 crores Unemployed Of people Employment Will be Says Hope To do Goes.

Last Answer : Padma The bridge A lot These Cement With Made

Last Answer : Padma The bridge Expenses All In combination 26 Thousands 693 Crores Money.

Description : Padma On the bridge Railroad Placement Will be Where ?

Last Answer : On the Padma Bridge Railroad Placement Will be Despicable On the floor.

Description : Padma The bridge Viaduct How much? Kilometers ?

Last Answer : 3 . 16 Kilometers.

Description : Padma The bridge Connection Road How much? Kilometers ?

Last Answer : 3 . 16 Kilometers.

Description : Padma The bridge Viaduct Pillar How many ?

Last Answer : Total 61 Viaduct Pillar.

Description : water Level From Padma The bridge Height How much ?

Last Answer : water Level From The bridge Height Almost 60 Feet

Description : Padma The bridge Piling Depth How much ?

Last Answer : approx 363 Feet Deep

Description : Padma The bridge Total Piling Numbers How much ?

Last Answer : Padma On the bridge Total 264 T. Piling There are.

Description : Padma The bridge Pillar Numbers How much ?

Last Answer : Padma Total 42 Pillar There are.

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : In the construction of a two­span bridge (span length = L) by using span­by­span construction, why is a length of about 1.25L bridge segment is constructed in the first phase of construction?

Last Answer : Basically, there are mainly three reasons for this arrangement: (i) The permanent structure is a statically indeterminate structure. During construction by using span­by­span construction, if the ... 25L from the first pier where there is relatively more space to accommodate prestressing works.

Description : What is Ante’s Law about, A. The relation between the span of the bridge and the pontics B. The periodontal area of the abutment teeth C. The relation between the length of the root and the abutment.

Last Answer : B. The periodontal area of the abutment teeth

Description : Why did the engineers of the longest continuous-span suspension bridge in the world change the blueprints after construction started?

Last Answer : (Earthquake)

Description : Definition of minor bridge e) Single span less than 12m f) Total linear water way less than 18m g) Both a) & b)* h) None of the above

Last Answer : g) Both a) & b)*

Description : Definition of major bridge a) Single span of 12m & above b) Total linear water way more than 18m c) Both a) & b)* d) None of the above

Last Answer : c) Both a) & b)*

Description : In a single span bridge, the clear span is the distance between a) Centres of Abutments b) Inner faces of Abutments* c) Outer faces of Abutments d) Width of Abutment

Last Answer : b) Inner faces of Abutments*

Description : A bridge is generally specified as “Br. No. 180 (5x9.10m G) at km 345/5-6”. a) Effective Span b) Width of bridge c) Clear Span* d) Overall length of bridge

Last Answer : c) Clear Span*

Description : What type of railway line has been laid on Bangabandhu Bridge ?

Last Answer : Dual gauge railway line has been laid at Bangabandhu Bridge.

Last Answer : Longest railway bridge in Bangladesh is "Jamuna Bridge"

Last Answer : Hardinge's Bridge, the longest railway bridge in Bangladesh , Pabna.

Description : Where is the old and over 2 km-long 'Pamban Railway Bridge', which attracts tourists from all over the country? [Asstt Comm 2008] (a) Nilgiris (b) Krishna delta (c) Palk straits (d) Malabar coast

Last Answer : Ans: (c)

Description : The longest Railway bridge in India is located on which lake? A. Vembanad Lake B. Chillika Lake C. Pancha Lake D. None of these

Last Answer : A [Vembanad Lake] Explanation: Vembanad Rail Bridge is a rail connecting Edappally and Vallarpadam in Kochi, Kerala. With a total length of 4,620 metres, it is the longest railway bridge in India.