Padma The bridge Piling Depth How much ?

1 Answer

Answer :

approx 363 Feet Deep

Related questions

Description : Padma The bridge Total Piling Numbers How much ?

Last Answer : Padma On the bridge Total 264 T. Piling There are.

Last Answer : : The Padma Bridge has occupied the eleventh position as the longest bridge in the world, surpassing the Bangabandhu Bridge.

Last Answer : Padma The bridge Pillar 42 T.

Last Answer : Padma The bridge Budget 30,000 _ _ Crores Money.

Last Answer : Padma The bridge Expenses All In combination 26 Thousands 693 Crores Money.

Description : Padma The bridge Viaduct How much? Kilometers ?

Last Answer : 3 . 16 Kilometers.

Description : Padma The bridge Connection Road How much? Kilometers ?

Last Answer : 3 . 16 Kilometers.

Description : Padma The bridge In the project River governance Done How much? Kilometers ?

Last Answer : two On the bank 12 Kilometers.

Description : Padma The bridge In the project Total Expenses How much ?

Last Answer : Original On the bridge 26 Thousands 693 Crores 39 Millions Money.

Description : Padma The bridge In the project River governance Expenses How much ?

Last Answer : answer : Thousands 606 Crores 61 Millions Money.

Description : water Level From Padma The bridge Height How much ?

Last Answer : water Level From The bridge Height Almost 60 Feet

Description : Padma The bridge Pillar Numbers How much ?

Last Answer : Padma Total 42 Pillar There are.

Description : The arrangement of supporting an existing structure by providing supports underneath, is known as (A) Shoring (B) Underpinning (C) Jacking (D) Piling

Last Answer : Answer: Option B

Description : Suggest the degree of workability in terms of slump for the following: i) Pavements using pavers ii) Canal lining iii) Heavily reinforced sections iv) In-situ piling

Last Answer : Degree of workability in terms of slump for the following: i) Pavements using pavers: 25-75 mm ii) Canal lining: 70-80 mm iii) Heavily reinforced sections: 50-100 mm iv) In-situ piling: 100-150 mm

Last Answer : Length and width of Padma Bridge respectively - 6.15 km. And 16.10 m.

Last Answer : : Date of issuance of work order: November 26 , 2014

Last Answer : : Date of signing the contract: June 18 , 2014.

Last Answer : : With this bridge, the economic growth of the country will increase by 1.2 percent and poverty will be alleviated at the rate of 0.84 percent every year .

Last Answer : : 21 districts of the southern districts will be directly connected by road.

Last Answer : : This two storey bridge will be constructed of concrete and steel.

Last Answer : : Gas , electricity and optical fiber line transport facilities.

Last Answer : : About 4 thousand.

Last Answer : : 6 thousand 708 crore 81 lakh rupees.

Last Answer : : 26 thousand 793 crore 39 lakh rupees on the main bridge.

Last Answer : : 14 kilometers at both ends.

Last Answer : : 72 feet four lane road.

Last Answer : : Padma Multipurpose Bridge Project.

Last Answer : Padma The bridge Economic Importance 1 . Every year 1 . 9 Percent At the rate Poverty Decrease Will get 2 . Economic Of growth Rate Will increase 1 . 2 Percent. 3 . Built To be 32 Of the year ... wheel Moving Keep it. 10 . Almost 2 crores Unemployed Of people Employment Will be Says Hope To do Goes.

Last Answer : Padma The bridge A lot These Cement With Made

Description : Padma On the bridge Railroad Placement Will be Where ?

Last Answer : On the Padma Bridge Railroad Placement Will be Despicable On the floor.

Description : Padma The bridge Viaduct Pillar How many ?

Last Answer : Total 61 Viaduct Pillar.

Description : Padma The bridge In the project Contracted Of the company Name What ?

Last Answer : China Railways Group Ltd.

Last Answer : The maximum depth of Padma river is 1581 feet or 489 meters. And an average depth of 96 feet or 295 meters.

Description : What is sucker deck principle for variable depth bridge decks?

Last Answer : For a variable depth bridge deck, the depth of continuous multi­span bridge deck is increased in pier supports and this absorbs sagging moments in the ... of arches and curved soffit rather than boring uniform deck alignment. Reference is made to Brian Pritchard (1992).

Description : bridge foundation having less then 2M depth below bed level in case of arch bridges and 1.2M depth below bed level in case of other bridges is termed as

Last Answer : …Shallow foundation..

Description : When proposed depth of construction of a bridge is more than the existing depth of construction in a bridge work, the existing rail level requires a) Lowering b) Lifting* c) Slewing d) None

Last Answer : b) Lifting*

Description : Depth of construction in a girder bridge means the depth from a) RL to HFL b) RL to top of bed block * c) RL to bottom of bed block d) RL to Bed level

Last Answer : b) RL to top of bed block *

Description : The journalist who refused to accept 'Padma Bhushan' was? -Awards

Last Answer : The journalist who refused to accept 'Padma Bhushan' was Khushwant Singh.

Description : Who is the author of the book Padma Nadir Majhi ?

Last Answer : Manik Bandyopadhyay is the author of Padma Nadir Majhi.

Description : When did the Government of India confer the title of Padma Bhushan on Kazi Nazrul ?

Last Answer : In 1960 , Kazi Nazrul was awarded the Padma Bhushan by the Government of India .

Description : Where did Padma-Meghna meet ?

Last Answer : Padma-Meghna has met Chandpur.

Description : What is the confluence of Padma and Jamuna ?

Last Answer : The meeting place of Padma Jamuna is called Daulatdia.

Description : Who is the author of the book Padma Palidwip ?

Last Answer : Abu Ishaq, the author of Padma Palidwip.

Description : Who is the author of "Padma Nadir Majhi" ?

Last Answer : Author of Padma Nadir Majhi - Manik Bandyopadhyay.