what- By which of the following methods was parallel line n constructed?

1 Answer

Answer :

converse of the alternate exterior angles theorem

Related questions

Description : Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area? (A) Sea walls, bulk heads and groynes (B) Sea walls, bulk heads and revetments (C) Sea walls, revetments and groynes (D) Bulk heads, revetments and groynes

Last Answer : (B) Sea walls, bulk heads and revetments

Description : The earthen embankments constructed parallel to the river banks at some suitable distance for flood control, are known as (A) Floods walls (B) Dikes (C) Levees (D) Both (b) and (c)

Last Answer : Answer: Option D

Description : Study the following statements. (i) Levees are constructed parallel to river flow (ii) Spurs are constructed parallel to river flow (iii) Levees are constructed transverse to river flow (iv) Spurs are constructed transverse to ... (B) (i) and (iv) (C) (ii) and (iii) (D) (iii) and (iv)

Last Answer : Answer: Option B

Description : State the four methods of laying of cable. State precautions while laying of underground cable in the situation : (i) Minimum clearance between cable and water pipe line when running in parallel. (ii) ... is to be laid in the same trench, what should be minimum spacing between two cables ?  

Last Answer : (i) Minimum clearance between cable and water pipe line when running in parallel:- 0.5 mtr. (ii) Minimum clearance between cable and water pipe line when running in parallel:- 0.5 mtr ... should be minimum spacing between two cables :- Then minimum 30 cm spacing is provided between 2 cables 

Description : Pick up the correct statement from the following: (A) The artificial barrier constructed to enclose "n area for safe anchorage, is called break water (B) The smoothened surface at the top end of ... fending (C) The effective berthing lengths of inclined guays can be adjusted (D) All the above

Last Answer : (D) All the above

Description : Name railway line that was constructed between Roha in Maharashtra and Mangalore in Karnataka. -Geography

Last Answer : Konkan Railways

Description : Pick up the incorrect statement from the following: (A) Highways are always constructed in straight line (B) Highways may be provided horizontal curves (C) Highways may be provided vertical curves (D) Highways may be provided both horizontal and vertical curves

Last Answer : Answer: Option A

Description : A new railway line is required to be constructed beaus’ of following reasons (a) Strategic and political considerations (b) Development of backward area (c) To shorten existing rail link (d) Any of them*

Last Answer : d) Any of them*

Description : PQ and RS are two equal and parallel line segments.Any points M not lying on PQ or RS is joined to Q and S and lines through P parallel to SM meet at N.Prove that line segments MN and PQ are equal and parallel to each other. -Maths 9th

Last Answer : hope its clear

Description : is this statement true or falsethe converse of the alternate exterior angle theorem guarantees that line L and line n are parallel.?

Last Answer : 1

Description : what postulate or theorem guarantees that line L and line N are parallel?

Last Answer : converse of the corresponding angles postulate

Description : Which of the methods listed is used to maintain the division of load between two compound-wound, DC generators operating in parallel? A. The shunt fields are interconnected. B. The shunt ... generators are connected in series. D. The equalizer connection parallels the series fields of all machines.

Last Answer : Answer: D

Description : Which of the methods listed is used to maintain equal load sharing between two compound wound DC generators operating in parallel? A. The shunt fields are interconnected. B. The shunt field rheostats ... are connected in series. D. The series fields of both generators are connected in parallel.

Last Answer : Answer: D

Description : Point out the wrong statement. a) A MapReduce job usually splits the input data-set into independent chunks which are processed by the map tasks in a completely parallel manner b) The ... implement the Mapper and Reducer interfaces toprovide the map and reduce methods d) None of the mentioned

Last Answer : None of the mentioned

Description : n project financing ,sensitivity analysis is applied because a) almost all the cash flow methods involve uncertainty b) of the need to assess how sensitive the project to changes in input parameters c) what if one or more factors are different from what is predicted d) all the above situation

Last Answer : d) all the above situation