Straight lines shown in a linear programming graph indicates ........................... a. Objective function
b. Constraints
c. Points
d. All of the above

1 Answer

Answer :

b. Constraints

Related questions

Description : 53. While plotting constraints on a graph paper, terminal points on both the axes are connected by straight line because a. The resources are limited in supply b. The objective function as a linear function c. The constraints are linear equations or inequalities d. All of the above

Last Answer : c. The constraints are linear equations or inequalities

Description : All the parameters in the linear programming model are assumed to be ..................... a. Variables b. Constraints c. Functions d. None of these

Last Answer : b. Constraints

Description : A constraint in a Linear Programming Model restricts: a. Value of objective function b. Value of decision variable c. Use of available resources d. All of the above

Last Answer : d. All of the above

Description : The graphical method if LPP uses: a. Linear equations b. Constraint equations c. Objective function d. All of the above

Last Answer : d. All of the above

Description : Which of the following method is used to solve mixed strategy problems: a. Probability method b. Graphic method c. Linear Programming method d. All of the above

Last Answer : d. All of the above

Description : Which of the following is true with regard to a Linear Programming Model? a. No guarantee to get integer valued solution b. The relationship among decision variables is liner c. Both a and b d. None of the these

Last Answer : d. None of the these

Description : Which of the followings is an assumption of Linear Programming Technique? a. Divisibility b. Additivity c. Proportionality d. All of the above

Last Answer : d. All of the above

Description : Linear Programming Technique helps to find an optimal use of: a. Machine b. Money c. Manpower d. All of the above

Last Answer : d. All of the above

Description : Linear Programming technique is a: a. Constrained optimisation technique b. Technique for economic allocation of resources c. Mathematical technique d. All of the above

Last Answer : d. All of the above

Description : ............................... is concerned with determination of the most economic replacement policy. a. Probabilistic programming b. Linear programming c. Search theory d. Replacement theory

Last Answer : d. Replacement theory

Description : Every Linear Programming Problem is related to another Linear Programming Problem, called .......................... a. Primal b. Dual c. Non-linear Programming d. None of these

Last Answer : b. Dual

Description : In Linear Programming Problem, degeneracy occurs in ................. stages. a. One b. Two c. Three d. Four

Last Answer : b. Two

Description : When at least one of the basic variables is zero, then the basic feasible solution to a Linear Programming Problem is said to be .............................. a. Infeasible b. Unbounded c. Degenerate d. Non-degenerate

Last Answer : c. Degenerate

Description : .................... is considered as the pioneer of Linear Programming Technique. a. churchman b. D W Miller c. James Lundy d. George B Dantzig

Last Answer : d. George B Dantzig

Description : If the feasible region of a linear programming problem is empty, the solution is .................... a. Unbounded b. Infeasible c. Infeasible d. Alternative

Last Answer : b. Infeasible

Description : The Hungarian method for solving an assignment problem can also be used to solve: a. A transportation problem b. A travelling salesman problem c. A linear programming problem d. Both a and b

Last Answer : b. A travelling salesman problem

Description : ........................may be defined as a method of determining an optimal program of interdependent activities in view of available resources. a. Goal programming b. Linear programming c. Decision making d. None of these

Last Answer : b. Linear programming

Description : Non-negativity constraints are written as ...................... a. Equality b. Non-equality c. Greater than or equal to d. Less than or equal to

Last Answer : c. Greater than or equal to

Description : A LPP model doesnot contain: a. Decision b. Constraints c. Feasible solution d. Spread Sheet

Last Answer : d. Spread Sheet

Description : While solving a LPP graphically, the area bounded by constraints is called ................. a. Feasible region b. Infeasible region c. Unbounded region d. None of these

Last Answer : a. Feasible region

Description : Constraints in an LPP are treated as active, if they: a. Do not consume all the available resources at optimality b. Represent optimal solution c. Both a and b d. None of these

Last Answer : b. Represent optimal solution

Description : In simplex method, we add .......................... in the case of constraints with sign “=” a. Surplus variable b. Artificial variable c. Slack variable d. None of these

Last Answer : b. Artificial variable

Description : In an LPP, if the solution of a variable can be made infinitely large without violating the constraints, then the solution is .............................. a. Infeasible b. Alternative c. Unbounded d. Unique

Last Answer : c. Unbounded

Description : A minimisation problem can be connected into maximisation problem by changing the signs of coefficients in the ........................... a. Constraints b. Objectives c. Both a and b d. None of these

Last Answer : b. Objectives

Description : The dummy source/destination in a transportation problem is added to ........................ a. Satisfy rim constraints b. Prevent solution from becoming degenerate c. Ensure total cost does not exceed a limit d. None of the above

Last Answer : a. Satisfy rim constraints

Description : ..................... are expressed in the form of equations a. Objectives b. Constraints c. Both a and b d. None of these

Last Answer : b. Constraints

Description : Before formulating a formal L P model, it is better to: a. Verbally identify decision variables b. Express the objective function in words c. Express each constraint in words d. All of the above

Last Answer : d. All of the above

Description : In maximisation cases, ....................... are assigned to the artificial variables as their coefficients in the objective function. a. + m b. – m c. 0 d. None of these

Last Answer : a. + m

Description : 30. The distinguishing feature of an LP model is a. Relationship among all variables is linear b. It has single objective function & constraints c. Value of decision variables is non-negative d. All of the above

Last Answer : a. Relationship among all variables is linear

Description : ........................ model is a map which indicates roads, highways, towns and inter- relationships a. Iconic model b. Analogue model c. Mathematical model d. None of these

Last Answer : b. Analogue model

Description : For a minimisation Transportation Problem, the objective is to minimise: a. Profit b. Cost c. Solution d. None of these

Last Answer : b. Cost

Description : In a maximisation assignment problem, the objective is to maximise ............................. a. Profit b. Cost c. Optimisation d. None of these

Last Answer : a. Profit

Description : ...................... is a method of analysing the current movement of the some variable in an effort to predict the future movement of the same variable. a. Goal programming b. Queuing theory c. Markov Analysis d. Replacement theory

Last Answer : c. Markov Analysis

Description : Graphic method can be applied to solve a liner programming problem when there are only ........................... variables a. A one b. Two c. Three d. More than three

Last Answer : b. Two

Description : A linear programm A linear programming model CANNOT be used when whic ing model CANNOT be used when which of the followin h of the following are true? g are true? a)An optimal ... set of linear constraints may be defined d)Cross product relationships exist between two or more decision variables

Last Answer : d)Cross product relationships exist between two or more decision variables

Description : 59. Alternative solutions exist of an LP model when a. One of the constraints is redundant b. Objective function equation is parallel to one of the constraints c. Two constraints are parallel d. All of the above

Last Answer : b. Objective function equation is parallel to one of the constraints

Description : 49. A feasible solution to an LP problem a. Must satisfy all of the problem’s constraints simultaneously b. Need not satisfy all of the constraints, only some of them c. Must be a corner point of the feasible solution d. Must optimize the value of the objective function

Last Answer : a. Must satisfy all of the problem’s constraints simultaneously

Description : 42. _____ assumption means the prior knowledge of all the coefficients in the objective function , the coefficients of the constraints and the resource values a. Proportionality b. Certainty c. Finite choices d. Continuity

Last Answer : b. Certainty

Description : The graph of a linear equation in two variables is always a straight line. True/false -Maths 9th

Last Answer : answer:

Description : For which type of motion, the distance time graph is not a straight line and can be any kind of curve? (1) Uniform motion (2) Circular motion (3) Non-uniform motion (4) Linear motion

Last Answer : (3) Non-uniform motion Explanation: When the motion is uniform, the distance time graph is a straight line with a slope.When the motion is non-uniform, the distance time graph is not a straight line. It can be any kind of curve.

Description : Assume a systems development project effort calculation determines that the system  will require 240 function points. If the developers choose to implement this system in the  C programming language, approximately ... without more information  c. exactly the same  d. much greater  e. much less

Last Answer : e. much less

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : Draw the graph of the linear equation whose solutions are represented by the points having the sum of the coordinates as 10 units. -Maths 9th

Last Answer : As per question, the sum of the coordinates is 10 units. Let x and y be two coordinates, then we get x + y = 10. For x = 5, y = 5, therefore, (5, 5) lies on the graph of x + y = 10. For x = ... and (3, 7) on the graph paper and joining them by a line, we get graph of the linear equation x + y = 10.

Description : Draw the graph of the linear equation whose solutions are represented by the points having the sum of the coordinates as 10 units. -Maths 9th

Last Answer : As per question, the sum of the coordinates is 10 units. Let x and y be two coordinates, then we get x + y = 10. For x = 5, y = 5, therefore, (5, 5) lies on the graph of x + y = 10. For x = ... and (3, 7) on the graph paper and joining them by a line, we get graph of the linear equation x + y = 10.

Description : Draw the graph of the linear equation 3x + 4y = 6. At what points, does the graph cut the x-axis and the y-axis? -Maths 9th

Last Answer : hope it helps

Description : Draw the bar graph of linear equation whose solution are represented by the points having difference the co-ordinate as 25 units -Maths 9th

Last Answer : This answer was deleted by our moderators...

Description : If a simplex table shows the values 2, -3, 0 against “θ”, which should be taken as the replacement ratio. a. 2 b. -3 c. 0 d. None of these

Last Answer : c. 0

Description : Controllable variables are also called.................................. a. Slack variables b. Surplus variables c. Artificial variable d. Decision variables

Last Answer : d. Decision variables

Description : The variables which cannot be manipulated by the decision maker are called.................... a. Controllable variables b. Uncontrollable variables c. Both a and b d. None of these

Last Answer : b. Uncontrollable variables