Assume a systems development project effort calculation determines that the system 

will require 240 function points. If the developers choose to implement this system in the 

C programming language, approximately 31,200 lines of code will have to be written. If 

the developers choose Visual Basic to implement the system, the number of lines of code 

will be _____. 

a. about the same 

b. can't tell without more information 

c. exactly the same 

d. much greater 

e. much less

1 Answer

Answer :

e. much less

Related questions

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability

Description : The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to ... ) 25 person months (B) 75 person months (C) 62.5 person months (D) 72.5 person months

Last Answer : (C) 62.5 person months 

Description : Function points are used to measure the estimated _____ of a project.  a. complexity  b. effort required  c. program size  d. time required

Last Answer : c. program size

Description : Algorithmic cost estimation in different organisations may be different for the same application development, because a) Different organisations consider complexity factors differently b) Different organisations may use ... measurement of productivity may vary e) All of the above may be true.

Last Answer : e) All of the above may be true.

Description : . A normal system with 400 unadjusted function points would have _____ adjusted  function points when the shortcut method is use to determine the complexity of the  project.

Last Answer : c. 400

Description : In Project Management, the end users and developers require to know the a. cost of the project, b. duration c. Length d. All the above

Last Answer : d. All the above

Description : Problems with using Lines of Code to measure the size of a product include(s) a) The creation of source code is only part of the development effort b) The Lines of Code (LOC) will differ between ... The final size (kLOC) can only be determined once the product is delivered e) All of the above.

Last Answer : e) All of the above.

Description : Kathryn has little experience estimating the time it will take to complete a systems  project. She has just completed the planning phase of the project. What method should she use to estimate the ... b. function points  c. industry standards  d. Microsoft Project  e. more complex approach

Last Answer : c. industry standards

Description : The process of assigning values for the time and effort needed to perform a system  project is called _____.  a. analysis  b. estimation  c. identifying  d. planning

Last Answer : b. estimation

Description : In the project planning, which of the following is considered as the most basic parameter  based on which all other estimates are made? A. project size B. project effort C. project duration D. project schedule

Last Answer : A. project size

Description : But won't most .NET developers eventually choose C# over Visual Basic.NET? 

Last Answer : No. Because the power of the two languages is so similar, the primary factor for developers migrating to the .NET world will probably be the syntax they prefer. Since many more developers ... the dominant language for building Windows applications five years from now will still be Visual Basic. 

Description : Using the shortcut method to determine the complexity of a systems project, a very  complex system having 300 unadjusted function points would have 405 adjust function  points.

Last Answer : Ans: True

Description : Science bases its estimation of the size of a product on a) Files (Fi), Flows (Fl) and Processes (Pr) b) Lines of Code (kLOC) c) Function Points (FP) d) operands and operators e) Feature Points (FeP).

Last Answer : d) operands and operators

Description : The most significant challenge to project managers is _____.  a. lack of project management training  b. no one really understands how to manage a complex systems development project  ... tools that can assist in controlling project progress  d. unrealistic schedule demands by project sponsors

Last Answer : d. unrealistic schedule demands by project sponsors

Description : Which of the following is/are main parameters that you should use when computing the costs of a software development project? a) travel and training costs b) hardware and software costs c) effort costs (the costs of paying software engineers and managers) d) all of the mentioned

Last Answer : d) all of the mentioned

Description : Which of the following is/are main parameters that you should use when computing the costs of a  software development project? a) travel and training costs b) hardware and software costs c) effort costs (the costs of paying software engineers and managers) d) all of the mentioned

Last Answer : d) all of the mentioned

Description : Which of the following are parameters involved in  computing the total cost of a development project? a) Hardware and costs b) Effort costs c) Travel and training costs d) All of the mentioned

Last Answer : d) All of the mentioned

Description : computing the costs of a development project? (A)travel and training costs (B) hardware and costs (C) effort costs (the costs of paying engineers and managers) (D)All of the mention

Last Answer : (D)All of the mention

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : What second programming language did Google add for App Engine development? A. C++ B. Flash C. JavaD. Visual Basic

Last Answer : Java

Description : What second programming language did Google add for App Engine development? A. C++ B. Flash C. Java D. Visual Basic

Last Answer : Java

Description : A Communications Management Plan does the following:  A. Coordinates an effort to communicate in meetings effectively B. Lays out a plan on how to communicate with your Project ... and  efficiently. D. Coordinates the communication between project leaders and uninterested project  members

Last Answer : C. Lays out the approach and method for delivering information effectively and  efficiently.

Description : How do you implement binary search code in visual basic?

Last Answer : The optimal binary search algorithm uses a sorted array as thedata container. Define the range to be searched using a half-closedrange of indices [begin:end). Initially, this will be thehalf- ... range is either empty or invalid(begin>=end), so the value does not existReturn not_foundEnd Function

Description : Which of the following is least likely to be part of the calculation of the terminal- year incremental net cash flow for an energy-related expansion project? A. An initial working capital ... Disposal/reclamation costs C. Capitalized expenditures D. Salvage value of any sold or disposed assets

Last Answer : D. Salvage value of any sold or disposed assets

Description : . When estimating project time schedules using industry standards, the estimated  project completion time for a systems project would be _____ person-months if the actual  planning phase were completed in 6 person-months.  a. 30  b. 40  c. 17.14  d. 9  e. 50

Last Answer : b. 40

Description : Lines of Code measures the size of project by counting A. the number of source instructions B. the comments in the code C. the header lines D. All of the above

Last Answer : A. the number of source instructions

Description : Complete the following statement. In a weak matrix environment, the  project manager, Eric, has to constantly make an effort to influence his  project team and stakeholders to ensure project success. ... managers. d. there are no functional managers. e. Eric has flexibility on authority.

Last Answer : b. Eric has no or little authority.

Description : The project closing process is essential to overall project planning. What is considered one of  the most important steps in closing the project? 1. Insuring that plans are produced to implement ... .  3. Transition the lease of equipment to the owner  4. Satisfying the contractual obligations

Last Answer : 4. Satisfying the contractual obligations

Description : The window version of Excel supports programming through Microsoft's Visual Basic for Applications (VBA), which is a dialect of _____: a) Visual Support b) Visual Basic c) Visual Format d) None of These

Last Answer : b) Visual Basic

Description : _____ is the process of planning and controlling the development of a system within a  specified time frame at a minimum cost with the right functionality.  a. Project management  b. Symantic timeline  c. Task identification  d. Time estimation  e. Work plan

Last Answer : a. Project management

Description : How does a project differ from an ongoing work effort?  A. It is unique B. It involves more than one person C. It has a project manager D. It is not a repetitive process that follows an organization’s existing procedures  (Ans.)

Last Answer : D. It is not a repetitive process that follows an organization’s existing procedures  (Ans.)

Description : The basic nature of a project is a/an _____ one. (A) permanent (B) temporary (C) (A) or (B) (D) Both (A) and (B)

Last Answer : (B) temporary

Description : The basic nature of a project is a/an _____ one. (A) permanent (B) temporary (C) (A) or (B) (D) Both (A) and (B)

Last Answer : (B) temporary

Description : )Methods of transmitting include: 1. Oral and written  2. Non-verbal/ visual  3. Tactile, involuntary and intuitive  4. All of the above

Last Answer : 4. All of the above

Description : During project estimation, project manager estimates following A. project cost B. project duration C. project effort D. all of the above

Last Answer : D. all of the above

Description : Project management is a rationally planned and organised effort to achieve a specific  goal. (True/False)

Last Answer : Ans. True

Description : To assist in budget control, it is suggested that the estimate occur at the _____ ____ ______  level of the WBS 1. Highest  2. Lowest  3. Major work effort  4. Third

Last Answer : 2. Lowest

Description : In Visual Basic .NET or Visual C# programming, when would you use Structured Query Language (SQL)? How are they executed? 

Last Answer : ADO.NET handles most of the database communication for you behind-thescenes. You would only use SQL statements when generating ad-hoc queries for the database. You execute SQL statements by ... returning statements, such as DELETE, INSERT INTO, or UPDATE statements, use the ExecuteNonQuery method.

Description : To the nearest rupee, what is the net present value of a replacement project whose cash flows are -Rs.104,000; Rs.34,444; Rs.39,877; Rs.25,000; and Rs.52,800 for years 0 through 4, respectively? The firm has decided to ... -free rate is 6%. A. Rs.15,115 B. Rs.26,798 C. Rs.33,346 D. Rs.48,121

Last Answer : C. Rs.33,346

Description : Adding people to a project team in order to speed up total development time _____.  a. is a standard task in timeboxing  b. is a useful way to meet a tight deadline  c. may actually increase total development time  d. simplifies communication within the team  e. none of the above

Last Answer : c. may actually increase total development time

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : Which of the following serves as metrics for project size estimation? A. Lines of codes B. function point C. Number of persons D. Only A & B

Last Answer : D. Only A & B

Description : Project management is the second major component of the planning phase of the  systems development life cycle (SDLC), and it includes three steps: creating the work  plan, staffing the project, and controlling and directing the project.

Last Answer : Ans: True

Description : Feasibility study determines -----------------  A.Whether the project is possible with resources  B.Comparing the project with world class manufacturing norms C.Calculate the cost crashing each unit  D.Add duration to each unit

Last Answer : A.Whether the project is possible with resources

Description : Political unrest, budget overruns, size and complexity of the project  Answer: B  (8)Decision trees are best used for : 1. Determining the interaction of the amount at stake and the expected ... and the associated events  4. A flow chart which determines the standard deviation of the risk event

Last Answer : 3. An illustration of how to see the interactions between decisions and the associated events