………………….. means coordinated effort, to communicate the information of the system written  form.
A) System documentation
B) Resource required
C) Development schedule
D) User Document

1 Answer

Answer :

A) System documentation

Related questions

Description : Which are the following is / are the level(s) of documentation? A) Documentation for management B) Documentation for user C) Documentation for data processing department D) All of the above

Last Answer : D) All of the above

Description : To create vehicle of information to provide evidence in the development process and to monitor the process. This is one of the objectives of A) Analysis B) Design C) Development D) Documentation

Last Answer : D) Documentation

Description : . An important aim of a post-project review is to: a. validate overall progress to date against the budget and schedule. b. capture learning and document it for future usage. c. ... of all permanent documentation, signed by the sponsor. d. establish that project benefits have been identified.

Last Answer : b. capture learning and document it for future usage.

Description : An important aim of a post-project review is to:  a. validate overall progress to date against the budget and schedule.  b. capture learning and document it for future usage.  c. ... of all permanent documentation, signed by the sponsor.  d. establish that project benefits have been identified

Last Answer : b. capture learning and document it for future usage.

Description : The reasons leading to popularity of client-server systems are: A) More powerful workstations on LANs B) Needed for graphical user interfaces of end users. C) Remove computing load for presentation services from the system managing a shared database resource. D) All

Last Answer : D) All

Description : The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to ... ) 25 person months (B) 75 person months (C) 62.5 person months (D) 72.5 person months

Last Answer : (C) 62.5 person months 

Description : ………… is a sort of blueprint of the system Development Effort. A) MDP B) DMP C) MPD D) DPM

Last Answer : A) MDP

Description : Assume a systems development project effort calculation determines that the system  will require 240 function points. If the developers choose to implement this system in the  C programming language, approximately ... without more information  c. exactly the same  d. much greater  e. much less

Last Answer : e. much less

Description : A Communications Management Plan does the following:  A. Coordinates an effort to communicate in meetings effectively B. Lays out a plan on how to communicate with your Project ... and  efficiently. D. Coordinates the communication between project leaders and uninterested project  members

Last Answer : C. Lays out the approach and method for delivering information effectively and  efficiently.

Description : ………………… approach reduces time and effort required for design and lesser risk in database management. A) Single global database B) Top-down approach C) Multiple databases D) None of the above

Last Answer : C) Multiple databases

Description : State True or False. i) Master Development Plan basically is a schedule of various applications to be comprised. ii) It consists of start and finish dates of a system analysis, design implementation and maintenance activities. ... B) i-False, ii-True C) i-True, ii-False D) i-False, ii-False

Last Answer : A) i-True, ii-True

Description : Statement of scope and objectives, opportunities and performance criteria …………. A) Problem definition B) System analysis C) System Design D) Documentation

Last Answer : A) Problem definition

Description : ………… system consists of programs, data files and documentation A) Conceptual B) Logical C) Physical D) None of the above

Last Answer : C) Physical

Description : The principal reason for developing a written audit program is to help assure that the a. Audit work is properly supervised. b. Audit report contains only significant findings. c. Audit work is properly planned and documented. d. Work of different auditors is properly coordinated

Last Answer : Audit work is properly planned and documented

Description : Which of the following is typically a written document that defines what work  will be accomplished by the end of the project? Select one: a. Scope of work (SOW) b. Project logic diagram c. Milestone schedule d. Ballpark estimate e. Work breakdown structure

Last Answer : a. Scope of work (SOW)

Description : …………………… is a schedule of various applications to be computerized. A) Materials planning B) Master development Plan C) Manufacturing organization D) None of the above

Last Answer : B) Master development Plan

Description : A Project control system: 1. Monitors and controls the project's schedule, costs, scope, budgets etc  2. Is a mechanism which reacts to the current project status in order to endure ... 4. Is a system for controlling and executing project documentation in an uniform and timely  manner

Last Answer : 1. Monitors and controls the project's schedule, costs, scope, budgets etc

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester or developer IV. Dependencies of the change request.

Last Answer : A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester ... and IV B. I, II and III C. II, III and IV D. I, II and IV

Last Answer : D. I, II and IV

Description : The third type of comment is used by a tool called .................. for automatic generation of documentation. A) Java commenting B) Java generator C) Java doc D) Java loc

Last Answer : C) Java doc

Description : The jdb is used to A) Create a jar archive B) Debug a java program C) Create C header file D) Generate java documentation

Last Answer : B) Debug a java program

Description : Which one of the following is not a step of requirement engineering ? (A) Requirement elicitation (B) Requirement analysts (C) Requirement design (D) Requirement documentation

Last Answer : (C) Requirement design

Description : What information sources used for the data and documentation that they use in their work activities (such as verbal written electronic)?

Last Answer : Need answer

Description : ……………. Can be defined as the permanent blocking of a set of processed that either complete for system resources or communicate with each other. A) Deadlock B) Permanent lock C) Starvation D) Mutual exclusion

Last Answer : A) Deadlock

Description : Which of the following statements is/are true w.r.t. Enterprise Resource Planning (ERP)? (A) ERP automates and integrates majority of business processes. (B) ERP provides access to information in a Real Time Environment. (C) ERP is ... (A) and (B) true; (C) false (4) (A) true; (B) and (C) are false

Last Answer : Answer: 3

Description : …………… are very effective because a mode switch is not required to switch from one thread to another. A) Kernel-level threads B) User-level threads C) Alterable threads D) Application level threads

Last Answer : B) User-level threads

Description : The Unix Kernel maintains two key data structures related to processes, the process table and the user structure. Which of following information is not the part of user structure? (A) File descriptor table (B) System call state (C) Scheduling parameters (D) Kernel stack

Last Answer : (C) Scheduling parameters

Description : In Unix operating system, special files are used to : (A) buffer data received in its input from where a process reads (B) provide a mechanism to map physical device to file names (C ... pointers associated with i-nodes (D) store information entered by a user application program or utility program

Last Answer : (B) provide a mechanism to map physical device to file names 

Description : Devices on one network can communicate with devices on another network via a ....... A) File Server B) Utility Server C) Printer Server D) Gateway

Last Answer : D) Gateway

Description : Explain the following: (i) Equivalence class testing. (ii) User and System documentation with examples. (iii) Core dumps.

Last Answer : Ans: (i) Equivalence class testing is based on partitioning the input domain of a program into a number of equivalence classes so that the test of a representative value of each ... indiscriminately. Sometimes it is difficult to interpret the dump which is represented using hexadecimal numbers.

Description : .......... displays the information about the active document such as page number, section number, number of pages, insertion point, position, etc. A) View Bar B) Menu Bar C) Status Bar D) Ruler Lin

Last Answer : C) Status Bar

Description : Scope creep is only a minor factor in projects running over schedule, and every effort  should be made to incorporate any changes into the present system if they would truly be  beneficial.

Last Answer : Ans: False

Description : With …………………. A page is written out to secondary memory only when it has been selected for replacement. A) pre-cleaning B) demand cleaning C) required cleaning D) fast cleaning

Last Answer : B) demand cleaning

Description : Which of the following is incorrect for virtual memory? (1) Large programs can be written (2) More I/O is required (3) More addressable memory available (4) Faster and easy swapping of process

Last Answer : Answer: 2

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : Which of the following statement is not correct with reference to cron daemon in UNIX O.S? (A) The cron daemon is the standard tool for running commands on a predetermined schedule. (B) It starts ... command lines and the times at which they invoked. (D) Crontab for individual users are not stored.

Last Answer : (D) Crontab for individual users are not stored.

Description : Project Integration Management ensures that various elements of a project are properly  integrated and coordinated for smooth flow of information and resources. (True/False)

Last Answer : Ans. True

Description : The document that identifies what information needs to be shared, to whom, why, when and how is called the: a. communication management plan. b. stakeholder mapping grid. c. document distribution schedule. d. responsibility assignment matrix.

Last Answer : a. communication management plan.

Description : The document that identifies what information needs to be shared, to whom, why, when and  how is called the: a. communication management plan.  b. stakeholder mapping grid.  c. document distribution schedule.  d. responsibility assignment matrix.

Last Answer : a. communication management plan.

Description : The _____ manual tells you how to use a software program: a) User b) Programming c) Documentation d) Technical e) None of These

Last Answer : a) User

Description : The..... manual tells you how to use a software program. 1) Documentation 2) Programming 3) Technical 4) User

Last Answer : 1) Documentation

Description : Pre-operatively, the nurse identified the nursing dagnosis, Knowledge Deficit: Post-operative communication strategies . Which of the following is a relevant nursing intervention? A. ... uses an alternative form of verbal communication D. Illustrate means of communicating post- operatively

Last Answer : D. Illustrate means of communicating post- operatively

Description : Suppose there are four processes in execution with 12 instances of a Resource R in a system. The maximum need of each process and current allocation are given below: With reference to current allocation, is system safe? If so, ... B) Yes, P1 P2 P3 P4 (C) Yes, P4 P3 P1 P2 (D) Yes, P2 P1 P3 P4

Last Answer : (C) Yes, P4 P3 P1 P2

Description : Consider a system with seven processes A through G and six resources R through W. Resource ownership is as follows: process A holds R and wants T process B holds nothing but wants T process C holds nothing but wants S process D holds U ... No (B) Yes, A, B, C (C) Yes, D, E, G (D) Yes, A, B, F

Last Answer : (C) Yes, D, E, G

Description : In the project planning, which of the following is considered as the most basic parameter  based on which all other estimates are made? A. project size B. project effort C. project duration D. project schedule

Last Answer : A. project size

Description : VIRUS stands for a) Very Intelligent Result Until Source b) Very Interchanged Resource Under Search c) Vital Information Resources Under Seize d) Viral Important Record User Searched

Last Answer : c) Vital Information Resources Under Seize

Description : VIRUS stands for 1) Very Important Resource Under Search 2) Virtual Information Resource Under Resize 3) Verify Interchange Result Until Source 4) Very Important Record User Searched

Last Answer : 2) Virtual Information Resource Under Resize

Description : VIRUS stands for 1 Very Important Resource Under Search 2 Virtual Information Resource Under Resize 3 Verify Interchange Result Until Source 4 Very Important Record User Searched

Last Answer : 2 Virtual Information Resource Under Resize

Description : Which is not the responsibility of customer/ user of the software A. Plan how and by whom each acceptance activity will be performed B. Prepare the acceptance plan C. Prepare resource plan D. Plan resources for providing information on which to base acceptance decisions

Last Answer : C. Prepare resource plan

Description : In the second type the information written in java after // is ignored by the ....................... A) Interpreter B) Compiler C) Programmer D) All of the above

Last Answer : B) Compiler