______ sizing is possible when the system load is cyclical or in some cases when there are
predictable bursts or spikes in the load.
a) Left
b) Right
c) Top
d) All of the mentioned
predictable bursts or spikes in the load.
a) Left
b) Right
c) Top
d) All of the mentioned