Suggest the compaction factor for the following degree of workability.

1 Answer

Answer :

Suggest the compaction factor for the following degree of workability.

image

Related questions

Description : For high degree of workability , the compaction factor is (a) 0.65 (b) 0.75 (c) 0.85 (d) 0.95

Last Answer : (d) 0.95

Description : Wp and Wf are the weights of a cylinder containing partially compacted and fully compacted concrete. If the compaction factor (Wp/Wf ) is 0.95, the workability of concrete is (A) Extremely low (B) Very low (C) Low (D) High

Last Answer : Option D

Description : Workability of concrete mix with low water cement ratio is determined by (A) Tensile strength test (B) Slump test (C) Compaction factor test (D) Flexural strength test

Last Answer : Answer: Option C

Description : The workability of concrete is expressed by (a) Water-cement ratio (b) Slump value (c) Compaction factor (d) Both (a) and (b)

Last Answer : (d) Both (a) and (b)

Description : As the workability increases compaction factor [ A ] Decreases [ B ] Increases [ C ] Remains same [ D ] None of the above

Last Answer : [ B ] Increases

Description : Workability of a concrete – mix is determined by (i)Slump cone test (ii)Compaction factor test (iii)Vee bee test [ A ] i [ B ] ii [ C ] i and ii [ D ] i, ii and iii

Last Answer : [ D ] i, ii and iii

Description : Workability of concrete mix with low water cement ratio is determined by [ A ] Tensile strength test [ B ] Slump cone test [ C ] Compaction factor test [ D ] Flexural strength test

Last Answer : [ C ] Compaction factor test

Description : While determining the workability of concrete mix, the compaction factor test is ------than the slump cone test [ A ] Less accurate [ B ] More accurate [ C ] Approximate method [ D ] None of the above

Last Answer : [ B ] More accurate

Description : Describe the procedure for determination of workability by compaction factor method.

Last Answer : Procedure for determination of workability by compaction factor method: The procedure of determining the workability of concrete using compaction factor as per IS: 1199-1959 is as follows. 1. Take the freshly ... upon calculated C.F., the degree of workability can be designated as follows. 

Description : Suggest the degree of workability in terms of slump for the following: i) Pavements using pavers ii) Canal lining iii) Heavily reinforced sections iv) In-situ piling

Last Answer : Degree of workability in terms of slump for the following: i) Pavements using pavers: 25-75 mm ii) Canal lining: 70-80 mm iii) Heavily reinforced sections: 50-100 mm iv) In-situ piling: 100-150 mm

Description : For high degree of workability, the slump value should vary between (a) 0 to 25mm (b) 25 to 50mm (c) 50 to 80mm (d) 80 to 100mm

Last Answer : (d) 80 to 100mm

Description : The factor which affects the compaction, is (A) Moisture content (B) Compacting content (C) Method of compaction (D) All the above

Last Answer : (D) All the above

Description : A compaction factor of 0.75 indicates ________workability [ A ] Very low [ B ] Low [ C ] Medium [ D ] High

Last Answer : [ A ] Very low

Description : The factor which affects workability, is (A) Water content and its temperature (B) Shape and size of the aggregates (C) Air entraining agents (D) All the above

Last Answer : (D) All the above

Description : For concreting of heavily reinforced sections without vibration, the workability of concrete expressed as compacting factor should be (A) 0.75 - 0.80 (B) 0.80 - 0.85 (C) 0.85 - 0.92 (D) Above 0.92

Last Answer : Answer: Option D

Description : Soil compaction __________ yield of potato. a. Increases b. Decreases c. Does not effect d. Unknown

Last Answer : Decreases

Description : An instrument used to measure soil compaction is: a Hydrometer b Cone penetrometer c Tachometer d Hygrometer

Last Answer : b Cone penetrometer

Description : DNA compaction involves a. A Twisting And Packing Of The DNA. b. Supercoiling. c. The Formation Of Looped Domains. d. All The Above (A—C) Are Correct.

Last Answer : d. All The Above (A—C) Are Correct.

Description : The compression resulting from a long term static load and consequent escape of pore water, is known as (A) Compaction (B) Consolidation (C) Swelling (D) None of these

Last Answer : (B) Consolidation

Description : The specific yield of soil depends upon (A) Compaction of stratum (B) Distribution of pores (C) Shape and size of particles (D) All the above

Last Answer : (D) All the above

Description : Pick up the correct statement from the following: (A) O.M.C. refers to the moisture corresponding to the maximum point on the moisture content dry density curve (B) The line which shows moisture content dry ... void line (C) The free fall of hammer for compaction is 30.5 cm (D) All the above

Last Answer : (D) All the above

Description : Pick up the incorrect statement from the following: (A) Compaction has no effect on the structure of a soil (B) Permeability decreases with increase in the dry density of a compacted soil (C) ... a dry side compacted soil (D) Dry side compaction soils swell more when given access to moisture

Last Answer : (A) Compaction has no effect on the structure of a soil

Description : The maximum dry density upto which any soil can be compacted depends upon (A) Moisture content only (B) Amount of compaction energy only (C) Both moisture content and amount of compaction energy (D) None of the above

Last Answer : (C) Both moisture content and amount of compaction energy

Description : The change of moisture content of soils, changes the (A) Value of the angle of repose (B) Amount of compaction required (C) Cohesive strength of soil (D) All the above

Last Answer : Answer: Option D

Description : With the increase in the amount of compaction energy (A) Optimum water content increases but maximum dry density decreases (B) Optimum water content decreases but maximum dry density increases ( ... and maximum dry density increase (D) Both optimum water content and maximum dry density decrease

Last Answer : Answer: Option B

Description : The infiltration capacity during rain storm, is considerably reduced due to (A) Surface detention (B) Soil moisture (C) Compaction due to rain (D) All the above

Last Answer : Answer: Option D

Description : Thickness of a pavement may be reduced considerably by (A) Compaction of soil (B) Stabilisation of soil (C) Drainage of soil (D) Combination of all the above

Last Answer : Answer: Option D

Description : The compaction of concrete, improves (A) Density (B) Strength (C) Durability (D) All the abov

Last Answer : (D) All the above

Description : Concrete is unsuitable for compaction by a vibrator if it is (A) Dry (B) Earth moist (C) Semi-plastic (D) Plastic

Last Answer : Answer: Option D

Description : The produce impermeable concrete (A) Thorough mixing of concrete is required (B) Proper compaction of concrete is required (C) Proper curing of concrete is required (D) All the above

Last Answer : Answer: Option D

Description : Non-uniform compaction may cause the concrete (A) Porous (B) Non-homogeneous (C) Reduced strength (D) All the above

Last Answer : Answer: Option D

Description : The property of the ingredients to separate from each other while placing the concrete is called (A) Segregation (B) Compaction (C) Shrinkage (D) Bulking

Last Answer : Answer: Option A

Description : Ware house pack' of cement means (A) Full capacity of the ware house (B) Pressure exertion of the bags of upper layers (C) Pressure compaction of the bags on lower layers (D) Packing the ware house

Last Answer : Answer: Option C

Description : The bulk density of aggregates, depends upon (A) Shape (B) Grading (C) Compaction (D) All the above

Last Answer : Answer: Option D

Description : The compaction of concrete in the drilled pile hole is done by compressed air in the case of (A) Simplex pile (B) Franki pile (C) Pressure pile (D) Vibro pile

Last Answer : Answer: Option C

Description : The bearing capacity of a water logged soil, may be improved by (A) Grouting (B) Chemical action (C) Drainage (D) Compaction

Last Answer : Answer: Option C

Description : The process of keeping concrete moist for a certain period after its finishing, is known as (A) Finishing of concrete (B) Curing of concrete (C) Placing of concrete (D) Compaction of concrete

Last Answer : Answer: Option B

Description : Weep holes are provided in retaining and breast walls (A) To drain off the water from the filling (B) To ventilate the stone masonry (C) To add architectural beauty (D) To increase compaction of the earth retained

Last Answer : Answer: Option A

Description : Pick up the correct statement from the following: (A) Plain cement concrete is equally strong in compression as well as in tension (B) Slump test is performed to check concrete strength (C ... D) Fineness modulus is the index number expressing the relative sizes of both coarse and fine aggregates

Last Answer : Option D

Description : For the determination of shear strength parameters, c and , of soil in the laboratory, the test to be conducted will be (a) Triaxial compression test (b) Sieve analysis (c) Compaction test (d) Relative density test

Last Answer : (a) Triaxial compression test

Description : The field density and field moisture content of a soil can be determined by 1. Core cutter method 2. Sand replacement method 3. Proctor compaction test 4. Modified proctor compaction test (a) 1, 2, 3 & 4 (b) 1 & 2 only (c) 2 & 3 only (d) 2 & 4 only

Last Answer : (b) 1 & 2 only

Description : Settlement due to creep in soils is contingent on : (a) Primary consolidation (b) Secondary consolidation (c) Initial settlement (d) Compaction settlement

Last Answer : (b) Secondary consolidation

Description : When the compaction energy increases the compaction of soils: (a) Both of OMC and maximum dry density decrease (b) Both of OMC and maximum dry density increase (c) OMC decreases but maximum dry density decrease (c) OMC increases but maximum dry density increase

Last Answer : (c) OMC decreases but maximum dry density decrease

Description : The purpose of lateral ties in short R.C. columns is to (a) Increase the load carrying capacity of column (b) Facilitate compaction of concrete (c) Facilitate construction (d) Avoid buckling of longitudinal bars

Last Answer : (d) Avoid buckling of longitudinal bars

Description : The process of consolidating concrete mix after placing it in position is termed as. (a) Curing (b) Wetting (c) Compaction (d) All of these

Last Answer : (c) Compaction

Description : The purpose of lateral ties in short reinforced concrete columns is to [ A ] Facilitate construction [ B ] Facilitate compaction of concrete [ C ] Increase the load carrying capacity of the columns [ D ] Avoid buckling of longitudinal bars

Last Answer : [ D ] Avoid buckling of longitudinal bars

Description : Concrete is unsuitable for compaction by vibration if it is [ A ] Semi – plastic [ B ] Plastic [ C ] Earth moist [ D ] Dry

Last Answer : [ B ] Plastic

Description : In dictionary techniques for data compaction, which approach of building dictionary is used for the prior knowledge of probability of the frequently occurring patterns? a. Static Dictionary b. Adaptive Dictionary c. both a and b d. None of the above

Last Answer : a. Static Dictionary

Description : The maximum dry density to which a soil may be compacted to depends upon a) Soil water content * b) The process of compaction c) The voids ratio d) Is independent of the type of soil

Last Answer : a) Soil water content *

Description : In case of compaction of soil by sheep foot roller maximum thickness of layer should not exceed buy more than -------------- centimeter of length of their teeth a) 5 centimeter* b) 4 centimeter c) 3 centimeter d) 2 centimeter

Last Answer : a) 5 centimeter*