Description : If a contractor proposes to increase concrete cover beyond contractual specification (i.e. 40mm to 70mm), shall engineers accept the proposal?
Last Answer : In contractual aspect, based on the requirement of General Specification of Civil Engineering Works (1992 Edition), the tolerance of concrete cover is between + ... larger cover. Therefore, with an increase of concrete cover, the crack width will increase which is undesirable.