Test planning has which of the following major tasks?
i. Determining the scope and risks, and identifying the objectives of testing.
ii. Determining the test approach (techniques, test items, coverage, identifying and interfacing
the teams involved in testing, testware)
iii. Reviewing the Test Basis (such as requirements, architecture, design, interface)
iv. Determining the exit criteria.
a) i, ii, iv are true and iii is false
b) i, iv are true and ii is false
c) i, ii are true and iii, iv are false
d) ii, iii, iv are true and i is false

2 Answers

Answer :

a) i, ii, iv are true and iii is false

Answer :

c) ii , iii are true and i is false

Related questions

Description : Exit Criteria may consist of :- i. Thoroughness measures , such as coverage of code, functionality or risk ii. Estimates of Defect density or reliability measures. iii. Residual risk such as defects not fixed or ... correct and i,ii,iii are incorrect d) iii and iv are correct and i,ii are incorrect

Last Answer : b) i,ii,iii is correct and iv is incorrect

Description : Which of the following is a part of Test Closure Activities? i. Checking which planned deliverables have been delivered ii. Defect report analysis. iii. Finalizing and archiving testware. iv. Analyzing lessons. a) i , ii , ... false c) i , iii , iv are true and ii is false d) All of above are true

Last Answer : c) i , iii , iv are true and ii is false

Description : Evaluating testability of the requirements and system are a part of which phase:- a) Test Analysis and Design b) Test Planning and control c) Test Implementation and execution d) Evaluating ... text box which accepts alphabets in lower or upper case. Identify the invalid Equivalence class value.

Last Answer : a) Test Analysis and Design

Description : Match every stage of the software Development Life cycle with the Testing Life cycle: i. Hi-level design a Unit tests ii. Code b Acceptance tests iii. Low-level design c System tests iv. Business requirements d Integration tests a) i-d , ii ... i-b , ii-a , iii-d , iv-c d) i-c , ii-a , iii-d , iv-b

Last Answer : d) i-c , ii-a , iii-d , iv-b

Description : Deciding how much testing is enough should take into account:- i. Level of Risk including Technical and Business product and project risk ii. Project constraints such as time and budget iii. Size of Testing Team iv. Size ... ii are true and iii, iv are false d) ii, iii, iv are true and i is false

Last Answer : c) i, ii are true and iii, iv are false

Description : Which of the following is the task of a Test Lead / Leader: i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project. ii. Write Test Summary Reports based on the ... is true and ii,iii,iv are false d) iii and iv is correct and i and ii are incorrect

Last Answer : a) i, ii, iii is true and iv is false

Description : Impact Analysis helps to decide :- a) How much regression testing should be done. b) Exit Criteria c) How many more test cases need to written. d) Different Tools to perform Regression Testing

Last Answer : a) How much regression testing should be done.

Description : Consider the following statements: i. 100% statement coverage guarantees 100% branch coverage. ii. 100% branch coverage guarantees 100% statement coverage. iii. 100% branch coverage guarantees 100% decision coverage. iv. 100% decision ... & v are False d) ii, iii & iv are True; i & v are False

Last Answer : d) ii, iii & iv are True; i & v are False

Description : A test harness is a A. A high level document describing the principles, approach and major objectives of the organization regarding testing B. A distance set of test activities collected into a manageable phase ... conduct a test D. A set of several test cases for a component or system under test

Last Answer : C. A test environment comprised of stubs and drives needed to conduct a test

Description : Which of the following is not phase of the Fundamental Test Process? a) Test Planning and Control b) Test implementation and Execution c) Requirement Analysis d) Evaluating Exit criteria and reporting

Last Answer : c) Requirement Analysis

Description : Which of the following is not decided in the test-planning phase? A. Schedules and deliverables B. Hardware and software C. Entry and exit criteria D. Types of test cases

Last Answer : D. Types of test cases

Description : Regression testing should be performed: i. every week ii. after the software has changed iii. as often as possible iv. when the environment has changed v. when the project manager says a) i & ii are true, iii, iv & v are ... iv are true, i, iii & v are false d) ii is true, i, iii, iv & v are false

Last Answer : c) ii & iv are true, i, iii & v are false

Description : Features to be tested, approach, item pass/fail criteria and test deliverables should be specified in which document? a) Test case specification b) Test procedure specification c) Test plan d) Test design specification

Last Answer : c) Test plan

Description : Which technique can be used to achieve input and output coverage? It can be applied to human input, input via interfaces to a system, or interface parameters in integration testing. A. Error Guessing B. Boundary Value Analysis C. Decision Table testing D. Equivalence partitioning

Last Answer : D. Equivalence partitioning

Description : Which technique can be used to achieve input and output coverage? It can be applied to human input, input via interfaces to a system, or interface parameters in integration testing. a) Error Guessing b) Boundary Value Analysis c) Decision Table testing d) Equivalence partitioning

Last Answer : d) Equivalence partitioning

Description : Decision to stop testing should be based upon A. Successful use of specific test case design methodologies B. A percentage of coverage for each coverage category C. Rate of error detection falls below a specified threshold D. All of the above

Last Answer : D. All of the above

Description : The establishment of an overall audit strategy involves I. Determining the characteristics of the engagement that define its scope. II. Ascertaining the reporting objectives of the engagement to plan the timing of the audit and the ... II only b. I and III only c. II and III only d. I, II, and III

Last Answer : I, II, and III

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : This life cycle model is basically driven by schedule and budget risks This statement is best suited for A. Water fall model B. Spiral model C. Incremental model D. V-Model Q33. The bug tracking ... these phases for each bug. I. Phase injected II. Phase detected III. Phase fixed IV. Phase removed

Last Answer : B. I, II and IV

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester or developer IV. Dependencies of the change request.

Last Answer : A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester ... and IV B. I, II and III C. II, III and IV D. I, II and IV

Last Answer : D. I, II and IV

Description : Validation involves which of the following: i. Helps to check the Quality of the Built Product ii. Helps to check that we have built the right product. iii. Helps in developing the product iv. Monitoring tool wastage and ... , ii, iii are true and iv is false d) iii is true and i, ii, iv are false

Last Answer : b) ii is true and i, iii, iv are false

Description : Coverage based analysis is best described as: A. A metric used to show the logic covered during a test session providing insight to the extent of testing. B. A tool for documenting the unique ... their status through to resolution. D. The most traditional means for analyzing a system or a program

Last Answer : A. A metric used to show the logic covered during a test session providing insight to the extent of testing.

Description : The following defines the statement of what the tester is expected to accomplish or validate during testing activity A. Test scope B. Test objective C. Test environment D. None of the above

Last Answer : B. Test objective

Description : Software testing activities should start A. As soon as the code is written B. During the design stage C. When the requirements have been formally documented D. As soon as possible in the development lifecycle

Last Answer : C. When the requirements have been formally documented

Description : In preparation for developing the acceptance criteria, the user should A. Know the defects in the application B. Acquire the basic knowledge of the application for which the system is ... D. Know new enhancement and basic understanding of how the application is implemented in users organization

Last Answer : Understand the risks and benefits of the development methodology that is to be used in correcting the software system

Description : Which of the following functions is typically supported by a software quality information system? I. Record keeping II. System design III. Evaluation scheduling IV. Error reporting A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV

Last Answer : C.I, III &IV

Description : A test plan defines A. What is selected for testing B. Objectives and results C. Expected results D. Targets and misses

Last Answer : B. Objectives and results

Description : Alpha testing is differentiated from Beta testing by A. The location where the tests are conducted. B. The types of test conducted C. The people doing the testing D. The degree to which white box techniques are used

Last Answer : A. The location where the tests are conducted.

Description : Test summary report A. Functional testing is mostly B. Validation techniques C. Verification techniques D. Both of the above E. None of the above

Last Answer : B. Validation techniques

Description : Drivers are also known as: i. Spade ii. Test harness iii. Scaffolding a) i , ii are true and iii is false b) i , iii are true and ii is false

Last Answer : c) ii , iii are true and i is false

Description : System test can begin when? I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting II. The development team provides software to the test team 3 business days prior ... . I and II only B. II and III only C. I and III only D. I, II and III

Last Answer : D. I, II and III

Description : Which of the following is true about White and Black Box Testing Technique:- a) Equivalance partitioning, Decision Table and Control flow are White box Testing Techniques. b) Equivalence partitioning ... , State Transition , Use Case Testing and Decision Table are White Box Testing Techniques.

Last Answer : c) Equivalence partitioning , State Transition , Use Case Testing are black box Testing Techniques.

Description : The establishment of the overall audit strategy involves a. Determining the characteristics of the engagement that defines its scope. b. Ascertaining the reporting objectives of the engagement to plan the timing ... will determine the focus of the engagement team's efforts. d. All of the answers

Last Answer : All of the answers

Description : In case of Large Systems :- a) Only few tests should be run b) Testing should be on the basis of Risk c) Only Good Test Cases should be executed. d) Test Cases written by good test engineers should be executed.

Last Answer : b) Testing should be on the basis of Risk

Description : Which of the following statements is true about a software verification and validation program? I. It strives to ensure that quality is built into software. II. It provides management with insights into the state ... software development activities. A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV

Last Answer : C.I, II&IV

Description : _________must be developed to describe when and how testing will occur. A. Test Strategy B. Test Plan C. Test Design D. High Level document

Last Answer : B. Test Plan

Description : It is difficult to create test scenarios for high-level risks A. True B. Fals

Last Answer : A. True

Description : a tester, what is your main objective in reviewing a requirement document? A. To ascertain that each requirement is traceable to a business need B. To ascertain that each ... business need, testable, and uniquely identifiable D. To ascertain that each requirement is uniquely identifiable

Last Answer : C. To ascertain that each requirement is traceable to a business need, testable, and uniquely identifiable

Description : As a tester, what is your main objective in reviewing a requirement document? A. To ascertain that each requirement is traceable to a business need B. To ascertain that each ... business need, testable, and uniquely identifiable D. To ascertain that each requirement is uniquely identifiable

Last Answer : B. Test objective

Description : . A key aspect of managing a project involves: a. defining which operational systems to put in place. b. identifying routine tasks. c. ensuring ongoing operations are maintained. d. planning to achieve defined objectives

Last Answer : d. planning to achieve defined objectives.

Description : A key aspect of managing a project involves:  a. defining which operational systems to put in place. b. identifying routine tasks.  c. ensuring ongoing operations are maintained.  d. planning to achieve defined objectives.

Last Answer : d. planning to achieve defined objectives.

Description : Which of the following techniques is NOT a black box technique? a) State transition testing b) LCSAJ (Linear Code Sequence and Jump) c) syntax testing d) boundary value analysis

Last Answer : b) LCSAJ (Linear Code Sequence and Jump)

Description : Testing techniques that can be used in acceptance testing are A. Structural B. Functional C. Usability D. A and B E. B and C

Last Answer : D. A and B

Description : Test design mainly emphasizes all the following except A. Data planning B. Test procedures planning C. Mapping the data and test cases D. Data synchronization

Last Answer : D. Data synchronization

Description : Which of the following is not a type of incremental testing approach? a) Top down b) Big-bang c) Bottom up d) Functional incrementation.

Last Answer : b) Big-bang

Description : Big bang approach is related to A. Regression testing B. Inter system testingC. Re-testing D. Integration testing

Last Answer : D. Integration testing

Description : Defects discovered by static analysis tools include: i. Variables that are never used. ii. Security vulnerabilities. iii. Programming Standard Violations iv. Uncalled functions and procedures a) i , ii,iii,iv is correct b ... ,iv are incorrect. c) i ,ii, iii and iv are incorrect d) iv, ii is correct

Last Answer : a) i , ii,iii,iv is correct