Which of the following is a part of Test Closure Activities?
i. Checking which planned deliverables have been delivered
ii. Defect report analysis.
iii. Finalizing and archiving testware.
iv. Analyzing lessons.
a) i , ii , iv are true and iii is false
b) i , ii , iii are true and iv is false
c) i , iii , iv are true and ii is false
d) All of above are true

1 Answer

Answer :

c) i , iii , iv are true and ii is false

Related questions

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : Exit Criteria may consist of :- i. Thoroughness measures , such as coverage of code, functionality or risk ii. Estimates of Defect density or reliability measures. iii. Residual risk such as defects not fixed or ... correct and i,ii,iii are incorrect d) iii and iv are correct and i,ii are incorrect

Last Answer : b) i,ii,iii is correct and iv is incorrect

Description : Deliverables of test design phase include all the following except A. Test data B. Test data plan C. Test summary report D. Test procedure plan

Last Answer : C. Test summary report

Description : Which of the following is the task of a Test Lead / Leader: i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project. ii. Write Test Summary Reports based on the ... is true and ii,iii,iv are false d) iii and iv is correct and i and ii are incorrect

Last Answer : a) i, ii, iii is true and iv is false

Description : Coverage based analysis is best described as: A. A metric used to show the logic covered during a test session providing insight to the extent of testing. B. A tool for documenting the unique ... their status through to resolution. D. The most traditional means for analyzing a system or a program

Last Answer : A. A metric used to show the logic covered during a test session providing insight to the extent of testing.

Description : Which of the following statements is true about a software verification and validation program? I. It strives to ensure that quality is built into software. II. It provides management with insights into the state ... software development activities. A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV

Last Answer : C.I, II&IV

Description : The structure of an incident report is covered in the Standard for Software Test Documentation IEEE 829 and is called as : - a) Anomaly Report b) Defect Report c) Test Defect Report d) Test Incident Report

Last Answer : a) Anomaly Report

Description : Regression testing should be performed: i. every week ii. after the software has changed iii. as often as possible iv. when the environment has changed v. when the project manager says a) i & ii are true, iii, iv & v are ... iv are true, i, iii & v are false d) ii is true, i, iii, iv & v are false

Last Answer : c) ii & iv are true, i, iii & v are false

Description : Consider the following statements: i. 100% statement coverage guarantees 100% branch coverage. ii. 100% branch coverage guarantees 100% statement coverage. iii. 100% branch coverage guarantees 100% decision coverage. iv. 100% decision ... & v are False d) ii, iii & iv are True; i & v are False

Last Answer : d) ii, iii & iv are True; i & v are False

Description : Validation involves which of the following: i. Helps to check the Quality of the Built Product ii. Helps to check that we have built the right product. iii. Helps in developing the product iv. Monitoring tool wastage and ... , ii, iii are true and iv is false d) iii is true and i, ii, iv are false

Last Answer : b) ii is true and i, iii, iv are false

Description : Deciding how much testing is enough should take into account:- i. Level of Risk including Technical and Business product and project risk ii. Project constraints such as time and budget iii. Size of Testing Team iv. Size ... ii are true and iii, iv are false d) ii, iii, iv are true and i is false

Last Answer : c) i, ii are true and iii, iv are false

Description : Defects discovered by static analysis tools include: i. Variables that are never used. ii. Security vulnerabilities. iii. Programming Standard Violations iv. Uncalled functions and procedures a) i , ii,iii,iv is correct b ... ,iv are incorrect. c) i ,ii, iii and iv are incorrect d) iv, ii is correct

Last Answer : a) i , ii,iii,iv is correct

Description : Drivers are also known as: i. Spade ii. Test harness iii. Scaffolding a) i , ii are true and iii is false b) i , iii are true and ii is false

Last Answer : c) ii , iii are true and i is false

Description : Features to be tested, approach, item pass/fail criteria and test deliverables should be specified in which document? a) Test case specification b) Test procedure specification c) Test plan d) Test design specification

Last Answer : c) Test plan

Description : Which of the following is not decided in the test-planning phase? A. Schedules and deliverables B. Hardware and software C. Entry and exit criteria D. Types of test cases

Last Answer : D. Types of test cases

Description : Defect Density' calculated in terms of A. The number of defects identified in a component or system divided by the size of the component or the system B. The number of defects found by a test phase ... The number of defects found by a test phase divided by the number found by the size of the system

Last Answer : A. The number of defects identified in a component or system divided by the size of the component or the system

Description : Suggest an alternative for requirement traceability matrix A. Test Coverage matrix B. Average defect aging C. Test Effectiveness D. Error discovery rate

Last Answer : A. Test Coverage matrix

Description : Testing Process comprised of A. Test Plan and Test Cases B. Test log and Test Status C. Defect Tracking D. All of the above

Last Answer : D. All of the above

Description : Sources of regression test cases are A. Boundary tests and other pre planned tests. B. Tests that reveal bugs in the program C. Customer reported bugs D. All of the above

Last Answer : D. All of the above

Description : Success Factors for a review include: i. Each Review does not have a predefined objective ii. Defects found are welcomed and expressed objectively iii. Management supports a good review process. iv. There is an emphasis on ... and ii is incorrect c) i , iii , iv , ii is in correct d) ii is correct

Last Answer : a) ii,iii,iv are correct and i is incorrect

Description : Match every stage of the software Development Life cycle with the Testing Life cycle: i. Hi-level design a Unit tests ii. Code b Acceptance tests iii. Low-level design c System tests iv. Business requirements d Integration tests a) i-d , ii ... i-b , ii-a , iii-d , iv-c d) i-c , ii-a , iii-d , iv-b

Last Answer : d) i-c , ii-a , iii-d , iv-b

Description : This life cycle model is basically driven by schedule and budget risks This statement is best suited for A. Water fall model B. Spiral model C. Incremental model D. V-Model Q33. The bug tracking ... these phases for each bug. I. Phase injected II. Phase detected III. Phase fixed IV. Phase removed

Last Answer : B. I, II and IV

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester or developer IV. Dependencies of the change request.

Last Answer : A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester ... and IV B. I, II and III C. II, III and IV D. I, II and IV

Last Answer : D. I, II and IV

Description : Which of the following functions is typically supported by a software quality information system? I. Record keeping II. System design III. Evaluation scheduling IV. Error reporting A.I, II&III B.II, III &IV C.I, III &IV D.I, II & IV

Last Answer : C.I, III &IV

Description : Which of the following is a requirement of an effective software environment? I. Ease of use II. Capacity for incremental implementation III. Capability of evolving with the needs of a project IV. Inclusion of advanced tools A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV

Last Answer : A.I, II &III

Description : Evaluating testability of the requirements and system are a part of which phase:- a) Test Analysis and Design b) Test Planning and control c) Test Implementation and execution d) Evaluating ... text box which accepts alphabets in lower or upper case. Identify the invalid Equivalence class value.

Last Answer : a) Test Analysis and Design

Description : A wholesaler sells printer cartridges. The minimum order quantity is 5. There is a 20% discount for orders of 100 or more printer cartridges. You have been asked to prepare test cases using various values for the number of printer cartridges ... A. 5, 6, 20 B. 4, 5, 80C. 4, 5, 99 D. 1, 20, 100

Last Answer : C. 0, 1,10,11, 50, 51, 75, 76,100,101

Description : System test can begin when? I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting II. The development team provides software to the test team 3 business days prior ... . I and II only B. II and III only C. I and III only D. I, II and III

Last Answer : D. I, II and III

Description : Which of the following will be the best definition for Testing :- a) The goal / purpose of testing is to demonstrate that the program works. b) The purpose of testing is to demonstrate that the ... does what it is supposed to do. d) Testing is executing Software for the purpose of finding defects.

Last Answer : d) Testing is executing Software for the purpose of finding defects.

Description : For final software acceptance testing, the system should include A. Delivered software B. All user documents C. Final version of oth

Last Answer : D. All of the above

Description : Which one from the following is highly associated activity of project planning? (A) Keep track of the project progress. (B) Compare actual and planned progress and costs (C) Identify the activities, milestones and deliverables produced by a project (D) Both (B) and (C)

Last Answer : (C) Identify the activities, milestones and deliverables produced by a project

Description : During the testing of a module tester X' finds a bug and assigned it to developer. But developer rejects the same, saying that it's not a bug. What X' should do? A. Report ... same bug to another developer D. Send to the detailed information of the bug encountered and check the reproducibility

Last Answer : D. Send to the detailed information of the bug encountered and check the reproducibility

Description : During the testing of a module tester X' finds a bug and assigned it to developer. But developer rejects the same, saying that it's not a bug. What X' should do? A. Report ... same bug to another developer D. Send to the detailed information of the bug encountered and check the reproducibility

Last Answer : D. Send to the detailed information of the bug encountered and check the reproducibility

Description : What are the four attributes to be present in any test problem?A. Statement, criteria, effect and cause B. Priority, fix, schedule and report C. Statement, fix effect and report D. None of the above.

Last Answer : A. Statement, criteria, effect and cause

Description : Test summary report A. Functional testing is mostly B. Validation techniques C. Verification techniques D. Both of the above E. None of the above

Last Answer : B. Validation techniques

Description : Which of the following is not phase of the Fundamental Test Process? a) Test Planning and Control b) Test implementation and Execution c) Requirement Analysis d) Evaluating Exit criteria and reporting

Last Answer : c) Requirement Analysis

Description : Impact Analysis helps to decide :- a) How much regression testing should be done. b) Exit Criteria c) How many more test cases need to written. d) Different Tools to perform Regression Testing

Last Answer : a) How much regression testing should be done.

Description : We use the output of the requirement analysis, the requirement specification as the input for writing :- a) User Acceptance Test Cases b) Integration Level Test Cases c) Unit Level Test Cases d) Program specifications

Last Answer : a) User Acceptance Test Cases

Description : Change X requires a higher level of authority than Change Y in which of the following pairs? Change X Change Y A. Code in development Code in production B. Specifications during requirements ... Documents requested by customers D. A product distributed to several sites A product with a single user

Last Answer : D. A product distributed to several sites A product with a single user

Description : In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed ... of these is a valid Boundary Value Analysis test case? A. £28000. B. £33501. C. £32001. D. £1500

Last Answer : B. £33501.

Description : Assume postal rates for 'light letters' are: $0.25 up to 10 grams; $0.35 up to 50 grams; $0.45 up to 75 grams; $0.55 up to 100 grams. Which test inputs (in grams) would be selected using boundary value analysis? A. 0, 9,19, ... C. 0, 1,10,11, 50, 51, 75, 76,100,101 D. 25, 26, 35, 36, 45, 46, 55, 56

Last Answer : C. 0, 1,10,11, 50, 51, 75, 76,100,101

Description : Test data planning essentially includes A. Network B. Operational Model C. Boundary value analysis D. Test Procedure Planning

Last Answer : C. Boundary value analysis

Description : A test harness is a A. A high level document describing the principles, approach and major objectives of the organization regarding testing B. A distance set of test activities collected into a manageable phase ... conduct a test D. A set of several test cases for a component or system under test

Last Answer : C. A test environment comprised of stubs and drives needed to conduct a test

Description : What is NOT a test log? A. Maps the test results to requirements B. Records test activities C. Maintains control over the test D. Contains pass or fail results.

Last Answer : A. Maps the test results to requirements

Description : Mutation testing is related to A. Fault seeding B. Functional testing C. Fault checking D. None of the above

Last Answer : A. Fault seeding

Description : Which of the following is true about White and Black Box Testing Technique:- a) Equivalance partitioning, Decision Table and Control flow are White box Testing Techniques. b) Equivalence partitioning ... , State Transition , Use Case Testing and Decision Table are White Box Testing Techniques.

Last Answer : c) Equivalence partitioning , State Transition , Use Case Testing are black box Testing Techniques.

Description : Software testing activities should start A. As soon as the code is written B. During the design stage C. When the requirements have been formally documented D. As soon as possible in the development lifecycle

Last Answer : C. When the requirements have been formally documented