Which of the following will be the best definition for Testing :-
a) The goal / purpose of testing is to demonstrate that the program works.
b) The purpose of testing is to demonstrate that the program is defect free.
c) The purpose of testing is to demonstrate that the program does what it is supposed to do.
d) Testing is executing Software for the purpose of finding defects.

1 Answer

Answer :

d) Testing is executing Software for the purpose of finding defects.

Related questions

Description : The purpose of software testing is to A. Demonstrate that the application works properly B. Detect the defects C. Validate the logical design

Last Answer : A. Demonstrate that the application works properly

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or ... software component: a) Re Testing b) Confirmation Testing c) Regression Testing d) Negative Testing

Last Answer : c) Regression Testing

Description : Software testing is (A) the process of establishing that errors are not present. (B) the process of establishing confidence that a program does what it is supposed to do. (C) the process of ... as per specifications. (D) the process of executing a program with the intent of finding errors. 

Last Answer : (D) the process of executing a program with the intent of finding errors.

Description : Coverage based analysis is best described as: A. A metric used to show the logic covered during a test session providing insight to the extent of testing. B. A tool for documenting the unique ... their status through to resolution. D. The most traditional means for analyzing a system or a program

Last Answer : A. A metric used to show the logic covered during a test session providing insight to the extent of testing.

Description : Exit Criteria may consist of :- i. Thoroughness measures , such as coverage of code, functionality or risk ii. Estimates of Defect density or reliability measures. iii. Residual risk such as defects not fixed or ... correct and i,ii,iii are incorrect d) iii and iv are correct and i,ii are incorrect

Last Answer : b) i,ii,iii is correct and iv is incorrect

Description : Defect Density' calculated in terms of A. The number of defects identified in a component or system divided by the size of the component or the system B. The number of defects found by a test phase ... The number of defects found by a test phase divided by the number found by the size of the system

Last Answer : A. The number of defects identified in a component or system divided by the size of the component or the system

Description : The primary goal of comparing a user manual with the actual behavior of the running program during system testing is to A. Find bugs in the program B. Check the technical accuracy of the document

Last Answer : B. Check the technical accuracy of the document

Description : Benefits of Independent Testing a) Independent testers are much more qualified than Developers b) Independent testers see other and different defects and are unbiased. c) Independent Testers cannot identify defects. d) Independent Testers can test better than developers

Last Answer : b) Independent testers see other and different defects and are unbiased.

Description : The selection of test cases for regression testing A. Requires knowledge on the bug fixes and how it affect the system B. Includes the area of frequent defects C. Includes the area which has undergone many/recent code changes D. All of the above

Last Answer : D. All of the above

Description : UAT is different from other testing types normally because of A. Data B. Cycles C. Defects D. None of the above

Last Answer : A. Data

Description : Testing Process comprised of A. Test Plan and Test Cases B. Test log and Test Status C. Defect Tracking D. All of the above

Last Answer : D. All of the above

Description : In preparation for developing the acceptance criteria, the user should A. Know the defects in the application B. Acquire the basic knowledge of the application for which the system is ... D. Know new enhancement and basic understanding of how the application is implemented in users organization

Last Answer : Understand the risks and benefits of the development methodology that is to be used in correcting the software system

Description : The structure of an incident report is covered in the Standard for Software Test Documentation IEEE 829 and is called as : - a) Anomaly Report b) Defect Report c) Test Defect Report d) Test Incident Report

Last Answer : a) Anomaly Report

Description : Finding Defect is not a major goal of Acceptance Testing. a) True b) False

Last Answer : ANSWER: True

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester or developer IV. Dependencies of the change request.

Last Answer : A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester ... and IV B. I, II and III C. II, III and IV D. I, II and IV

Last Answer : D. I, II and IV

Description : Defects discovered by static analysis tools include: i. Variables that are never used. ii. Security vulnerabilities. iii. Programming Standard Violations iv. Uncalled functions and procedures a) i , ii,iii,iv is correct b ... ,iv are incorrect. c) i ,ii, iii and iv are incorrect d) iv, ii is correct

Last Answer : a) i , ii,iii,iv is correct

Description : Success Factors for a review include: i. Each Review does not have a predefined objective ii. Defects found are welcomed and expressed objectively iii. Management supports a good review process. iv. There is an emphasis on ... and ii is incorrect c) i , iii , iv , ii is in correct d) ii is correct

Last Answer : a) ii,iii,iv are correct and i is incorrect

Description : The Kick Off phase of a formal review includes the following :- a) Explaining the objective b) Fixing defects found typically done by author c) Follow up d) Individual Meeting preparations

Last Answer : a) Explaining the objective

Description : ‘Be bugging’ is known as A. Preventing the defects by inspection B. Fixing the defects by debugging C. Adding known defects by seeding D. A process of fixing the defects by tester

Last Answer : C. Adding known defects by seeding

Description : Defects are least costly to correct at what stage of the development cycle? A. Requirements B. Analysis & Design C. Construction D. Implementation

Last Answer : A. Requirements

Description : __________ testing assumes that the path of logic in a unit or program is known. A. Black Box testing B. Performance Testing C. White Box testing D. Functional testing

Last Answer : C. White Box testing

Description : A testing which checks the internal logic of the program is A. Black box testing B. White box testing C. Both (A) and (B) D. None of the above

Last Answer : B. White box testing

Description : Which of the following is a part of Test Closure Activities? i. Checking which planned deliverables have been delivered ii. Defect report analysis. iii. Finalizing and archiving testware. iv. Analyzing lessons. a) i , ii , ... false c) i , iii , iv are true and ii is false d) All of above are true

Last Answer : c) i , iii , iv are true and ii is false

Description : Suggest an alternative for requirement traceability matrix A. Test Coverage matrix B. Average defect aging C. Test Effectiveness D. Error discovery rate

Last Answer : A. Test Coverage matrix

Description : Regression testing should be performed: i. every week ii. after the software has changed iii. as often as possible iv. when the environment has changed v. when the project manager says a) i & ii are true, iii, iv & v are ... iv are true, i, iii & v are false d) ii is true, i, iii, iv & v are false

Last Answer : c) ii & iv are true, i, iii & v are false

Description : Match every stage of the software Development Life cycle with the Testing Life cycle: i. Hi-level design a Unit tests ii. Code b Acceptance tests iii. Low-level design c System tests iv. Business requirements d Integration tests a) i-d , ii ... i-b , ii-a , iii-d , iv-c d) i-c , ii-a , iii-d , iv-b

Last Answer : d) i-c , ii-a , iii-d , iv-b

Description : System test can begin when? I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting II. The development team provides software to the test team 3 business days prior ... . I and II only B. II and III only C. I and III only D. I, II and III

Last Answer : D. I, II and III

Description : Testing of software used to convert data from existing systems for use in replacement systems A. Data driven testing B. Migration testing C. Configuration testing D. Back to back testing

Last Answer : B. Migration testing

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing ... after system testing. A. Water Fall Model B.V-Model C. Spiral Model D. RAD Model

Last Answer : B.V-Model

Description : A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages. A. System Testing B. Big-Bang Testing C. Integration Testing D. Unit Testing

Last Answer : B. Big-Bang Testing

Description : A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages. A. System Testing B. Big-Bang Testing C. Integration Testing D. Unit Testing

Last Answer : B. Check the technical accuracy of the document

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and

Last Answer : B.V-Model

Description : A type of integration testing in which software elements, hardware elements, or both are combined all at once into a component or an overall system, rather than in stages. A. System Testing B. Big-Bang Testing C. Integration Testing D. Unit Testing

Last Answer : B. Big-Bang Testing

Description : For final software acceptance testing, the system should include A. Delivered software B. All user documents C. Final version of oth

Last Answer : D. All of the above

Description : Which testing methods are used by end-users who actually test software before they use it? A. Alpha & Beta Testing B. White Box Testing C. Black Box Testing D. Trial & Error Testing

Last Answer : A. Alpha & Beta Testing

Description : Software testing activities should start A. As soon as the code is written B. During the design stage C. When the requirements have been formally documented D. As soon as possible in the development lifecycle

Last Answer : C. When the requirements have been formally documented

Description : What is COTS? A. Commercial On-the-shelf software B. Commercial off-the-shelf software C. Common Offshore testing Software

Last Answer : B. Commercial off-the-shelf software

Description : Which of the following statements is true about a software verification and validation program? I. It strives to ensure that quality is built into software. II. It provides management with insights into the state ... software development activities. A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV

Last Answer : C.I, II&IV

Description : In case of Large Systems :- a) Only few tests should be run b) Testing should be on the basis of Risk c) Only Good Test Cases should be executed. d) Test Cases written by good test engineers should be executed.

Last Answer : b) Testing should be on the basis of Risk

Description : Which of the following is not a type of incremental testing approach? a) Top down b) Big-bang c) Bottom up d) Functional incrementation.

Last Answer : b) Big-bang

Description : Which of the following is the task of a Test Lead / Leader: i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project. ii. Write Test Summary Reports based on the ... is true and ii,iii,iv are false d) iii and iv is correct and i and ii are incorrect

Last Answer : a) i, ii, iii is true and iv is false

Description : Which of the following is true about White and Black Box Testing Technique:- a) Equivalance partitioning, Decision Table and Control flow are White box Testing Techniques. b) Equivalence partitioning ... , State Transition , Use Case Testing and Decision Table are White Box Testing Techniques.

Last Answer : c) Equivalence partitioning , State Transition , Use Case Testing are black box Testing Techniques.

Description : Which of the following techniques is NOT a black box technique? a) State transition testing b) LCSAJ (Linear Code Sequence and Jump) c) syntax testing d) boundary value analysis

Last Answer : b) LCSAJ (Linear Code Sequence and Jump)

Description : Functional system testing is: a) testing that the system functions with other systems b) testing that the components that comprise the system function together c) testing the end to end functionality of the system as a whole d) testing the system performs functions within specified response times

Last Answer : c) testing the end to end functionality of the system as a whole

Description : Impact Analysis helps to decide :- a) How much regression testing should be done. b) Exit Criteria c) How many more test cases need to written. d) Different Tools to perform Regression Testing

Last Answer : a) How much regression testing should be done.

Description : Which of the following uses Impact Analysis most? a) Component testing b) Non-functional system testing c) User acceptance testing d) Maintenance testing

Last Answer : d) Maintenance testing