A 3% downgrade curve is followed by a 1% upgrade curve and rate of change of grade  adopted is 0.1% per 20 m length. The length of the respective vertical curve is :  (a) 800 m (b) 200 m (c) 100 m (d) 400 m

1 Answer

Answer :

(a) 800 m

Related questions

Description : An upgrade g1% is followed by a downgrade g2%. The equation of the parabolic curve of length L to be introduced, is given by (A) y = g [(g - g L] x² (B) y = [(g g L] x² (C) y = [(g - g L] x² (D) y = [(g g L] x²

Last Answer : Answer: Option B

Description : If +0.8% grade meets -0.7% grade and the rate of change of grade for 30 m distance is 0.05, the  length of the vertical curve will be  (A) 600 m  (B) 700 m  (C) 800 m  (D) 900 m

Last Answer : (D) 900 m

Description : If the rate of change of grade permitted along a vertical curve is r and total change of grade is g%, the length L of the curve to be provided, is (A) L = (r × 100/g) m (B) L = (g × 100/r) m (C) L = (r + g) × 100m (D) L = [100/(r + g)] m

Last Answer : Answer: Option B

Description : The total length of a valley formed by two gradients - 3% and + 2% curve between the two tangent points to provide a rate of change of centrifugal acceleration 0.6 m/sec2 , for a design speed 100 kmph, is (A) 16.0 m (B) 42.3 m (C) 84.6 m (D) None of these

Last Answer : Answer: Option C

Description : When an up gradient of a highway meets a downgrade, the vertical curve provided, is known as (A) Valley curve (B) Sag curve (C) Summit curve (D) All the above

Last Answer : Answer: Option C

Description : The mass of 2.5 m3 of a certain liquid is 2 tonnes. Its mass density is (A) 200 kg/m3 (B) 400 kg/m3 (C) 600 kg/m3 (D) 800 kg/m

Last Answer : Answer: Option D

Description : Match the following HTTP status code to their respective definitions. i) 400 a) OK ii) 500 b) Not found iii) 200 c) Continue iv) 100 d) Internal server error A) i-b, ii-d, iii-a, iv-c B) i-a, ii-b, iii-c, iv-d C) i-b, ii-c, iii-a, iv-d D) i-b, ii-a, iii-c, iv-d

Last Answer : A) i-b, ii-d, iii-a, iv-c

Description : Match the following HTTP status code to their respective definitions. i) 400 a) OK ii) 500 b) Not found iii) 200 c) Continue iv) 100 d) Internal server error A) i-b, ii-d, iii-a, iv-c B) i-a, ii-b, iii-c, iv-d C) i-b, ii-c, iii-a, iv-d D) i-b, ii-a, iii-c, iv-d

Last Answer : A) i-b, ii-d, iii-a, iv-c

Description : A long iron rod initially at a temperature of 20°C has one end dipped in boiling water (100°C) at time, t = 0. The curved surface of the rod is insulated so that heat conduction is one dimensional in the axial direction. The ... = 283 s (B) t = 356 s (C) t = 400 s (D) t = 800 s

Last Answer : (D) t = 800 s

Description : Four channels are multiplexed using TDM. If each channel sends 100 bytes/second and we multiplex 1 byte per channel, then the bit rate for the link is __________. a. 400 bps b. 800 bps c. 1600 bps d. 3200 bps

Last Answer : d. 3200 bps

Description : Four channels are multiplexed using TDM. If each channel sends 100 bytes/second and we multiplex 1 byte per channel, then the bit rate for the link is ............... (A) 400 bps (B) 800 bps (C) 1600 bps (D) 3200 bps

Last Answer : (D) 3200 bps Answer: D Explanation: The multiplexer is shown in the Figure. Each frame carries 1 byte from each channel; the size of each frame, therefore, is 4 bytes, or 32 bits. Because each ... channel, the frame rate must be 100 frames per second. The bit rate is 100 32 = 3200 bps. 

Description : To pump water from a water reservoir 3 m deep and maximum water level at 135 m, a pump is  installed to lift water up to R.L. 175 m at a constant rate of 36,00,000 litres per hour. If the length  of the ... the water horse power of the pump is  (A) 400  (B) 450  (C) 500 (D) 600

Last Answer : (D) 600

Description : The cheapest modems cantransmit A. 300 bits per second B. 1,200 bitsper second C. 2,400 bits per second D. 4,800 bits per second E. None of the above

Last Answer : 300 bits per second

Description : If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be (A) 2.3% and 84.1% (B) 97.7% and 84.1% (C) 97.7 % and 15.9% (D) 15.9% and 97.7%

Last Answer : (A) 2.3% and 84.1%

Description : The cement becomes useless if its absorbed moisture content exceeds [ A ] 1% [ B ] 2% [ C ] 3% [ D ] 5%

Last Answer : [ D ] 5%

Description : Pick out the wrong statement. (A) The annual depreciation rate for machinery and equipments in a chemical process plant is about 10% of the fixed capital investment (B) Annual depreciation rate ... chemical industry, research and development cost amounts to about 15% of net sales realisation (NSR)

Last Answer : (D) In a chemical industry, research and development cost amounts to about 15% of net sales realisation (NSR)

Description : Educational cess is charges at the rate of …….. A) 2% B) 1% C) 3% D) 5%

Last Answer : C) 3%

Description : If the rate of gain of radial acceleration is 0.3 m per sec3 and full centrifugal ratio is developed. On the curve the ratio of the length of the transition curve of same radius on road and railway, is (A) 2.828 (B) 3.828 (C) 1.828 (D) 0.828

Last Answer : (A) 2.828

Description : A device is sending out data at the rate of 2000 bps. How long does it take to send a file of 1,00,000 characters ? a. 50 b. 200 c. 400 d. 800

Last Answer : c. 400

Description : A device is sending out data at the rate of 2000 bps. How long does it take to send a file of 1,00,000 characters ? (A) 50 (B) 200 (C) 400 (D) 800

Last Answer : (C) 400 Explanation: 1,00,000 characters = 1,00,000 x 8 bits = 8,00,000 bits 8,00,000 bits/2000 bps = 400 seconds

Description : Flat rate parcel rates Flat Rate Parcel Boxes size Dimension of boxes (in mm) Weight (in Kg.) Tariff (in Rs.) Small - S 250*50*300 0 to 1 125 Medium - M 250*100*300 Above 1 to 2.5 200 Large - L 300*250*200 Above 2.5 to 5 400

Last Answer : Large - L 300*250*200 Above 2.5 to 5 400

Description : Pick up the correct statement from the following: (A) Detailed survey is carried out for a strip of land about 30 m at sharp curves (B) Levels are taken along the trace cut at an interval of 20 m (C) Contour interval is generally adopted at 2 metres vertical interval (D) All the above

Last Answer : Answer: Option D

Description : The grade of concrete not recommended by I.S. : 456, is (A) M 100 (B) M 200 (C) M 300 (D) M 500

Last Answer : (D) M 500

Description : Permissible compressive strength of M 200 concrete grade is (A) 100 kg/cm2 (B) 150 kg/cm2 (C) 200 kg/cm2 (D) 250 kg/cm2

Last Answer : (C) 200 kg/cm2

Description : Permissible compressive strength of M 300 concrete grade is (A) 100 kg/cm2 (B) 150 kg/cm2 (C) 200 kg/cm2 (D) 300 kg/cm2

Last Answer : (D) 300 kg/cm2

Description : Permissible compressive strength of M 200 concrete grade is (A) 100 kg/cm2 (B) 150 kg/cm2 (C) 200 kg/cm2 (D) 250 kg/cm2

Last Answer : Answer: Option C

Description : Permissible compressive strength of M 150 concrete grade is (A) 100 kg/cm2 (B) 150 kg/cm2 (C) 200 kg/cm2 (D) 250 kg/cm2

Last Answer : Answer: Option C

Description : If the various concrete ingredients i.e. cement, sand and aggregates are in the ratio of 1:3:6, the grade of concrete, is (A) M 100 (B) M 150 (C) M 200 (D) M 250

Last Answer : Answer: Option A

Description : Mr. W. Simms, the consulting Engineer to the Government of India recommended the gauge for Indian railways A. 1.435 m as adopted in England B. 1.800 m as per Indian conditions C. 1.676 m as a compromise gauge D. 1.000 m as a standard gauge

Last Answer : C [1.676 m as a compromise gauge]

Description : According to 2017 census what is the share of FATA in the total Population of Pakistan A. 3% B. 2% C. 1% D. 0.5%

Last Answer : ANSWER: B

Description : According to 2017 census what is the share of FATA in the total Population of Pakistan A. 3% B. 2% C. 1% D. 0.5%

Last Answer : ANSWER: B

Description : Decrease in field strength on top of Mount Everest is A. 10% B. 5% C. 1% D. 0.3%

Last Answer : 0.3%

Description : Rebate is allowed on advance deposit of premium on RPLI for Qtly/Half year/year is a) 1%, 2%,3% b) 0.50%,1%,2% b) 0%, 1%,2% d) No rebate in RPLI

Last Answer : b) 0.50%,1%,2%

Description : Which of the below options are called as appropriate Keyword Density?  A. 0.1-3%  B.01-0.1%  C.7-9.5%  D.3-4%

Last Answer : D.3-4%

Description : The horizontal deflection of a parabolic curved beam of span 10 m and rise 3 m when loaded with  a uniformly distributed load l t per horizontal length is (where Ic  is the M.I. at the crown, which  varies as the slope ... arch).  (A) 50/EIc (B) 100/EIc (C) 150/EIc (D) 200/E

Last Answer : (D) 200/E

Description : Transport of concrete by pumps, is done for a distance of (A) 100 m (B) 200 m (C) 300 m (D) 400 m

Last Answer : (D) 400

Description : A small dairy farm daily produces 100 kilograms of average quality buffalo milk and sells it to an organised dairy at the rate of Rs. 100 per kilogram of total solids contained in the milk. How much would be the daily gross ... (D) Between Rs. 1,000 and Rs. 1,100 (E) Between Rs. 1,650 and Rs. 1,850

Last Answer : (B) Between Rs. 1,250 and Rs. 1,400

Description : A normally consolidated clay settled 10 mm when effective stress was increased from 100 kN/m² to 200 kN/m². If the effective stress is further increased from 200 kN/m² to 400 kN/m², then the settlement of the same clay is (A) 10 mm (B) 20 mm (C) 40 mm (D) None of the above

Last Answer : (A) 10 mm

Description : The normal altitude of GPS satellite is about (A) 16,200 km (B) 20,200 km (C) 24,400 km (D) 36,100 km

Last Answer : Answer: Option B

Description : If the baudrate is400 for a QPSK signal, thebit rate is ________ bps. A) 100 B) 400 C) 800 D) 1600

Last Answer : 800

Description : A Firm is considering undertaking a project that would yield annual profits (after  depreciation) of Rs 68,000 for 5 years. The initial outlay of the project would be Rs  800,000 and the project's assets would have ... accounting rate of return for this project?  A 16%  B 8.5%  C 8.0%  D 9.1%

Last Answer : A 16%

Description : CG Co manufactures a single product T. Budgeted production output of product T during June is  200 units. Each unit of product T requires 6 labour hours for completion and CG Co anticipates 20 per  cent idle time. Labour is paid at ... for March is (a) Rs 6,720 (b) 8,400 (c) 10,080 (d) 10,500

Last Answer : (d) 10,500

Description : The original cost of an equipment is Rs.10,000. Its salvage value at the end of its total useful life of five years is Rs. 1,000. Its book value at the end of two years of its useful life (as per straight line method of evaluation ... be (A) Rs. 8,800 (B) Rs. 7,600 (C) Rs. 6,400 (D) Rs. 5,000

Last Answer : (C) Rs. 6,400

Description : ECE Board Exam March 1996 What is the transmission rate of a system for transmitting the output of a microcomputer to a line printer operating at a speed of 30 lines/minute? Assume that the line printer has 8 bits ... and prints out 80 characters/line. A. 800 bps B. 400 bps C. 320 bps D. 640 bps

Last Answer : C. 320 bps

Description : If the rate of change of the super-elevation along a curved portion of a 7 metre wide road is 1 in 150 and the maximum super-elevation allowed is 1 in 15, the maximum length of the transition curve to be provided at either end, is (A) 65 m (B) 70 m (C) 75 m (D) 80 m

Last Answer : Answer: Option B

Description : Stress strain curve of high tensile steel (A) Has a definite yield point (B) Does not show definite yield point but yield point is defined by 0.1% proof stress (C) Does not show definite yield ... proof stress (D) Does not show definite yield point but yield point is defined by 2% proof stress,

Last Answer : Answer: Option C

Description : Pick up the correct statement from the following: (A) The height of head light above road surface, is taken as 0.75 m (B) The beam of head light is up to one degree upwards from the grade of road (C) While designing the valley curve, the height of the object is assumed nil (D) All the above

Last Answer : Answer: Option D

Description : The monthly incomes of A and B are in the ratio 4:5, their expenses are in the ratio 5 : 6. If 'A' saves Rs.25 per month and 'B' saves Rs.50 per month, what are their respective incomes? A) Rs.400 and Rs.500 B) Rs.240 and Rs.300 C) Rs.320 and Rs.400 D) Rs.440 and Rs.550 E) NONE

Last Answer : Answer: A Let AA's income be = 4x AA's expenses, therefore = 4x–25 Let BB's income be = 5x BB's expenses, therefore = 5x–50 We know that the ratio of their expenses = 5:6 ⇒24x−150=25x−250 ⇒ Therefore, x=100 A's income =4x=400 and B's income =5x=500 

Description : In an experiment, the percentage of error occurred in the measurement of physical quantities A, B, C and D are 1%, 2%, 3% and 4% respectively.

Last Answer : In an experiment, the percentage of error occurred in the measurement of physical quantities A, B, C and D are 1%, 2%, ... % (C) (3/13) % (D) 16 %

Description : The % of ‘K’ in Extracellular fluid is about (A) 1% (B) 2 to 3% (C) 10% (D) 15%

Last Answer : Answer : A