The process of hardening the concrete by keeping its surface moist is known
(A) Placing
(B) Wetting
(C) Curing
(D) Compacting

1 Answer

Answer :

Answer: Option C

Related questions

Description : The process of keeping concrete moist for a certain period after its finishing, is known as (A) Finishing of concrete (B) Curing of concrete (C) Placing of concrete (D) Compaction of concrete

Last Answer : Answer: Option B

Description : The process of consolidating concrete mix after placing it in position is termed as. (a) Curing (b) Wetting (c) Compaction (d) All of these

Last Answer : (c) Compaction

Description : The process of keeping the concrete structure moist is called [ A ] Hydration [ B ] Curing [ C ] Creep [ D ] Shrinkage

Last Answer : [ B ] Curing

Description : The property of fresh concrete, in which the water in the mix tends to rise to the surface while placing and compacting, is called (A) Segregation (B) Bleeding (C) Bulking (D) Creep

Last Answer : Answer: Option B

Description : The process of mixing, transporting, placing and compacting concrete using Ordinary Port land Cement should not take more than (A) 30 minutes (B) 40 minutes (C) 60 minutes (D) 90 minutes

Last Answer : Answer: Option A

Description : The process of mixing, transporting, placing and compacting the cement, concrete should not take more than. (a) 30 minutes (b) 60minutes (c) 90 minutes (d) 120mm

Last Answer : (a) 30 minutes

Description : The process of conversion of plastic concrete to solid stage is called [ A ] Hydration [ B ] Hardening [ C ] Setting [ D ] Curing

Last Answer : [ C ] Setting

Description : The process of hardening of concrete in the presence of water is called [ A ] Creep [ B ] Hydration [ C ] Shrinkage [ D ] Curing

Last Answer : [ B ] Hydration

Description : For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is (A) 1 (B) 2 (C) 3 (D) 4

Last Answer : (A) 1

Description : For Ordinary Portland cement concrete exposed to dry and hot weather conditions, good moist curing period is [ A ] 7 days [ B ] 10 days [ C ] 14 days [ D ] None of the above

Last Answer : [ B ] 10 days

Description : For compacting plain concrete road surface of thickness less than 20 cm, we use (A) Internal vibrator (B) Screed vibrator (C) Form vibrator (D) None of these

Last Answer : Answer: Option B

Description : For compacting plain concrete road surface of thickness less than 20 cm, the following vibrator is used. [ A ] Internal vibrator [ B ] Screed vibrator [ C ] Form vibrator [ D ] None of the above

Last Answer : [ B ] Screed vibrator

Description : The process of proper and accurate measurement of concrete ingredients for uniformity of proportion, is known (A) Grading (B) Curing (C) Mixing (D) Batching

Last Answer : (D) Batching

Description : The process of proper and accurate measurement of concrete ingredients for uniformity of proportion, is known as [ A ] Curing [ B ] Mixing [ C ] Grading [ D ] Batching

Last Answer : [ D ] Batching

Description : Pick up the correct statement from the following: (A) The sand in the sand pile is well compacted (B) The sand is kept moist at the time of placing and tamping (C) Sand piles are generally used under column loads (D) All of the above

Last Answer : Answer: Option D

Description : While compacting the concrete by a mechanical vibrator, the slump should not exceed (A) 2.5 cm (B) 5.0 cm (C) 7.5 cm (D) 10 cm

Last Answer : Answer: Option B

Description : For concreting of heavily reinforced sections without vibration, the workability of concrete expressed as compacting factor should be (A) 0.75 - 0.80 (B) 0.80 - 0.85 (C) 0.85 - 0.92 (D) Above 0.92

Last Answer : Answer: Option D

Description : Pick up the correct statement from the following: (A) For thin structures subjected to wetting and drying, the water cement ratio should be 0.45 (B) For mass concrete structures subjected to wetting and ... under water, the water-cement ratio by weight should be 0.55 (D) All the above

Last Answer : Answer: Option D

Description : Define the following special types of concretes with its one use. i) Vacuum concrete ii) Fiber reinforced concrete iii) High performance concrete iv) Self-compacting concrete

Last Answer : The uses of special types of concretes are as follows.  i) Vacuum concrete: It is the concrete in which entrained air and excess water form concrete mix is taken out from vacuum pump, ... . large bridge and machine foundations iii. Pumped concrete for floors and slabs. iv. Pre-stressed concrete

Description : Which one of the following represents an activity? (A) Excavation for foundation (B) Curing of concrete (C) Setting of question paper (D) All the above

Last Answer : (D) All the above

Description : Curing (A) Reduces the shrinkage of concrete (B) Preserves the properties of concrete (C) Prevents the loss of water by evaporation (D) All of the above

Last Answer : (D) All of the above

Description : Strength of concrete increases with (A) Increase in water-cement ratio (B) Increase in fineness of cement (C) Decrease in curing time (D) Decrease in size of aggregate

Last Answer : (B) Increase in fineness of cement

Description : The produce impermeable concrete (A) Thorough mixing of concrete is required (B) Proper compaction of concrete is required (C) Proper curing of concrete is required (D) All the above

Last Answer : Answer: Option D

Description : For providing a raft foundation, the following activities are involved 1. Ramming the foundation bed 2. Excavation of the soil upto required depth 3. Laying the reinforcement over the foundation bed 4. Curing the cement concrete placed over ... 2, 1 (C) 2, 1, 3, 5, 4 (D) 3, 2, 5, 1, 4

Last Answer : Answer: Option C

Description : Pick up the correct statement from the following: (A) Plain cement concrete is equally strong in compression as well as in tension (B) Slump test is performed to check concrete strength (C ... D) Fineness modulus is the index number expressing the relative sizes of both coarse and fine aggregates

Last Answer : Option D

Description : Modulus of elasticity of concrete is increased with (a) Higher W/C ratio (b) Shorter curing period (c) Lesser vibration (d) Increase in age

Last Answer : (d) Increase in age

Description : The object of curing is to (a) Prevent the loss of water by evaporation. (b) Reduce the shrinkage of concrete (c) Preserve the properties of concrete (d) All of these

Last Answer : (d) All of these

Description : Blast furnace slag cement concrete requires ___________time for shuttering and curing. (a) Less (b) More (c) Medium (d) All the above

Last Answer : (b) More

Description : Modulus of elasticity of concrete is primarily influenced by [ A ] Elastic properties of aggregate [ B ] Curing of concrete [ C ] Age of concrete [ D ] Mix proportion and type of cement

Last Answer : [ A ] Elastic properties of aggregate

Description : At 28 days of curing concrete attains a strength of [ A ] 20 to 25% [ B ] 60 to 70% [ C ] 65 to 80% [ D ] 90 to 95%

Last Answer : [ D ] 90 to 95%

Description : Consider the following operations: 1. Drilling 2. Blasting 3. Mucking 4. Placing steel 5. Placing concrete The correct sequence of these operations in tunnel construction is (A) 1, 2, 4, 3, 5 (B) 1, 3, 2, 4, 5 (C) 1, 2, 3, 4, 5 (D) 1, 3, 4, 2,

Last Answer : (C) 1, 2, 3, 4, 5

Description : To prevent segregation, the maximum height for placing concrete, is (A) 100 cm (B) 125 cm (C) 150 cm (D) 200 cm

Last Answer : Answer: Option A

Description : The property of the ingredients to separate from each other while placing the concrete is called (A) Segregation (B) Compaction (C) Shrinkage (D) Bulking

Last Answer : Answer: Option A

Description : The removal of excess air after placing concrete helps in increasing the strength of concrete by (a) 15 to 20% (b) 20 to 30% (c) 30 to 50% (d) 50 to 70%

Last Answer : (a) 15 to 20%

Description : While placing of concrete the thickness of each layer for R.C.C. is [ A ] 150 to 300 mm [ B ] 450 mm [ C ] 500 to 750 mm [ D ] 500 mm

Last Answer : [ A ] 150 to 300 mm

Description : Pick up the correct statement from the following: (A) Water cement paste hardens due to hydration (B) During hardening cement binds the aggregates together (C) Cement provides strength, durability and water tightness to the concrete (D) All the above

Last Answer : Answer: Option D

Description : Admixtures which cause early setting and hardening of concrete are called (A) Workability admixtures (B) Accelerators (C) Retarders (D) Air entraining agents

Last Answer : Answer: Option B

Description : Which of the following cements is suitable for use in massive concrete structures such as large dams? (A) Ordinary Portland cement (B) Low heat cement (C) Rapid hardening cement (D) Sulphate resisting cement

Last Answer : Answer: Option B

Description : Which of the following statements is correct? (a) Sulphate resisting cement is particularly used for canal lining. (b) Low heat cement should not be used for thin concrete structures. (c) Rapid hardening cement should not be used for massive concrete structures (d) All of the above

Last Answer : (d) All of the above

Description : For mass concrete work, the type of cement preferable is [ A ] Ordinary Portland cement [ B ] Rapid hardening cement [ C ] Low heat cement [ D ] Blast furnace slag cement

Last Answer : [ C ] Low heat cement

Description : Concrete is unsuitable for compaction by a vibrator if it is (A) Dry (B) Earth moist (C) Semi-plastic (D) Plastic

Last Answer : Answer: Option D

Description : A concrete having a slump of 6.5 cm, is said to be (A) Dry (B) Earth moist (C) Semi-plastic (D) Plastic

Last Answer : Answer: Option D

Description : Concrete is unsuitable for compaction by vibration if it is [ A ] Semi – plastic [ B ] Plastic [ C ] Earth moist [ D ] Dry

Last Answer : [ B ] Plastic

Description : the difficulty of placing matrices on deciduous dentition is a result of, A. The small mouth of kids which result in problem keeping the matrices in their mouths B. The occlusal convergence of the deciduous teeth

Last Answer : B. The occlusal convergence of the deciduous teeth

Description : The aggregate containing moisture in pores and having its surface dry, is known as (A) Moist aggregates (B) Very dry aggregates (C) Dry aggregates (D) Saturated surface dry aggregate

Last Answer : Answer: Option D

Description : An aggregate which may contain some moisture in the pores but having dry surface is known as. (a) Dry aggregate (b) Moist aggregate (c) Saturated surface dry aggregate (d) All the above

Last Answer : (a) Dry aggregate

Description : Pick up the correct statement from the following: (A) The plastic bottles are made by the process of blowing (B) The application of thermo-setting resins on sheets of paper, is called laminating ... placing raw material in the desired moulds, is known as moulding process (D) All the above

Last Answer : Answer: Option D

Description : The factor which affects the compaction, is (A) Moisture content (B) Compacting content (C) Method of compaction (D) All the above

Last Answer : (D) All the above

Description : The most suitable equipment for compacting clayey soils is a (A) Smooth wheeled roller (B) Pneumatic tyred roller (C) Sheep foot roller (D) Vibrator

Last Answer : Answer: Option C

Description : The bearing capacity of a water logged soil can be improved by (A) Compacting the soil (B) Draining the soil (C) Increasing the depth of foundation (D) Grouting

Last Answer : Option B