What Are The Different Phases Of Sdlc?

1 Answer

Answer :

SDLC - stands for Software Development Life Cycle.
It can be divided in to 7 phases they are:
1. Preliminary Investigation (Feasibility Study).
2. Requirement Analysis (Analysis).
3. Design of the System.
4. Software Construction.
5. System Testing.
6. System Implementation.
7. System Maintenance.

Related questions

Description : To identify the tasks for a work plan the project manager can _____.  a. control and direct the project  b. estimate the size, staff the project, and remember technical skills  c. establish a ... of the SDLC and the steps that occur in each  e. set conservative numbers for the project software

Last Answer : d. list the four phases of the SDLC and the steps that occur in each

Description : Integrated CASE tools are used to support tasks that happen throughout the SDLC.

Last Answer : Ans: True

Description :  The project team has just determined that the deadline for completion will not be met.  In order to deliver a high quality system on schedule, the team has requested that the  features be ... that a fixed deadline be imposed for the project. This technique  is referred to as SDLC methodology.

Last Answer : Ans: False

Description : Project management is the second major component of the planning phase of the  systems development life cycle (SDLC), and it includes three steps: creating the work  plan, staffing the project, and controlling and directing the project.

Last Answer : Ans: True

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : The phases of a project life cycle are: a. starting, planning, control and closing. b. concept, definition, development, handover and closure. c. initiation, definition, planning, monitoring and operations. d. concept, definition, implementation and operations.

Last Answer : b. concept, definition, development, handover and closure.

Description : One of the reasons a project life cycle is split into phases is to: a. facilitate formal go/no-go decision making during the project. b. balance the costs of work in each phase of ... the major deployments of resources throughout the project. d. chunk work into time periods of similar durations.

Last Answer : a. facilitate formal go/no-go decision making during the project.

Description : Which one of the following is captured in the Work Breakdown Structure (WBS)? a. The life cycle phases. b. The logical order of tasks. c. The scope of the project. d. Project costs.

Last Answer : c. The scope of the project.

Description :  According to PMBOK, project management process groups are iterative, which  was originally defined by Walter Shewhart and later modified by Edward Deming.  Generally, one outcome from a previous process can serve ... -Do-Check-Act cycle c. Project phases d. PM processes e. HR process cycle

Last Answer : b. Plan-Do-Check-Act cycle

Description : Project cycle is a collection of generally sequential project phases whose description and  order of occurrence are determined by the control needs of the organisation or  organisations involved in the project. (True/False)

Last Answer : Ans. True

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : The RUP is normally described from three perspectives- dynamic, static& practice. What does static perspective do? a) It shows the process activities that are enacted. b) It suggests good practices to be used during the process. c) It shows the phases of the model over time.

Last Answer : a) It shows the process activities that are enacted.

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : Which one of the following is captured in the Work Breakdown Structure (WBS)?  A.The life cycle phases  B.The logical order of tasks  C.The scope of the project  D. Project costs

Last Answer : C.The scope of the project

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : The phases of a project life cycle are:  a. starting, planning, control and closing.  b. concept, definition, development, handover and closure.  c. initiation, definition, planning, monitoring and operations.  d. concept, definition, implementation and operations.

Last Answer : b. concept, definition, development, handover and closure.

Description : One of the reasons a project life cycle is split into phases is to:  a. facilitate formal go/no-go decision making during the project.  b. balance the costs of work in each phase ... the major deployments of resources throughout the project.  d. chunk work into time periods of similar durations.

Last Answer : a. facilitate formal go/no-go decision making during the project.

Description : Which one of the following is captured in the Work Breakdown Structure (WBS)?  a. The life cycle phases.  b. The logical order of tasks.  c. The scope of the project.  d. Project costs

Last Answer : c. The scope of the project.

Description : The project closing process is essential to overall project planning. What is considered one of  the most important steps in closing the project? 1. Insuring that plans are produced to implement ... .  3. Transition the lease of equipment to the owner  4. Satisfying the contractual obligations

Last Answer : 4. Satisfying the contractual obligations

Description : A planning method, which provides details of the work to accomplish, but also provide some  preliminary description of the work to be done in later phases is called : 1. Progressive detailing  2. Rolling wave  3. Strategic  4. Operational

Last Answer : 2. Rolling wave

Description : In which of the following project phases is the project schedule developed? 1. Conceptual  2. Planning  3. Implementation  4. Design

Last Answer : 2. Planning

Description : Explain The Phases Of Software Project?

Last Answer : The different phases of software projects are follows: Initiation: Preparing scope document, requirement documents, Estimation chart, project plan and proposal documents. Planning: Designing test ... establishing change management procedure. Closure: Closing project and move it to maintenance mode.

Description : In the nine-phase approach to the SDLC defining functional and technical requirements reviewing the list and getting approval is completed during the phase of the SDLC?

Last Answer : Requirements analysis phase

Description : SDLC stands for ? Software design life cycle Software development life cycle System design life cycle System development life cycle

Last Answer : Software development life cycle

Description : What is the main difference between DDCMP and SDLC? a. DDCMP does not need special hardware to final the beginning of a message b. DDCMP has a message header c. SDLC has a IP address d. SDLC does not use CRC

Last Answer : DDCMP does not need special hardware to final the beginning of a message

Description : Choose the Protocols working in the Data Link Control Layer of OSI model below. a. ATM (Asynchronous Transfer Mode), Frame Relay b. HDLC (High Level Data Link Control), SDLC (Synchronous Data Link Control) c. ARP (Address Resolution Protocol), IEEE802.3 d. All the above

Last Answer : d. All the above

Description : What is Software Development Life Cycle? (SDLC) and draw a diagram for pure waterfall life cycle.

Last Answer : System Development Life Cycle (SDLC) is the overall process of developing information systems through a multi-step process from investigation of initial requirements through analysis, design, implementation and maintenance.

Description : Continual (Continuous) improvement cycle is based on systematic sequence of -------------- activities. a) SDLC b) PDCA c) waterfall model

Last Answer :  Ans : b.

Description : SDLC stands for ________ a) Software development life cycle b) System development life cycle c) Software design life cycle d) System design life cycle

Last Answer : Ans : a

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A) Technical key resources (B) Work key structure (C) Work Breakdown Structure (WBS). (D) None of the above

Last Answer : (C) Work Breakdown Structure (WBS).

Description : Which one is a true statement relating to project communications? a. A project sponsor is responsible for all communication methods and media. b. Different stakeholders typically have different communication needs ... project. d. Email is the only way to communicate with large numbers of people.

Last Answer : b. Different stakeholders typically have different communication needs.

Description : Different activity of a project management is A. project planning B. project monitoring C. project control D. All of the above

Last Answer : B. project monitoring

Description : In a ____, the employees work for different projects in a team-like structure.

Last Answer : Ans. Project-type organisational structure

Description : The entire process of a project may be considered to be made upon a number of sub- processes placed in different stages called the Work Breakdown Structure. (True/False)

Last Answer : Ans. True

Description : Algorithmic cost estimation in different organisations may be different for the same application development, because a) Different organisations consider complexity factors differently b) Different organisations may use ... measurement of productivity may vary e) All of the above may be true.

Last Answer : e) All of the above may be true.

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description : What combines procedures and tools to manage different versions of configuration objects that are created during the process? a) Change control b) Version control c) SCIs d) None of the mentioned

Last Answer : b) Version control

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A)Technical key resources (B)Work key structure (C)Work Breakdown Structure (WBS). (D)None of the above

Last Answer : (C)Work Breakdown Structure (WBS).

Description : The activities that make up the project are not simple, repetitive  acts, such as mowing the lawn, painting the house, washing the car, or loading the delivery truck. a. They are complex b. They are simple c. Different d. Same

Last Answer : a. They are complex

Description : Something is always................each time the activities of a project are repeated. a. Different b. Same c. Various d. None of the above

Last Answer : a. Different

Description : A project has never happened before, and it will never happen again, under the..............conditions. a. Same condition b. Different condition c. Various condition d. None of the above

Last Answer : a. Same condition

Description : Outsourced projects are susceptible to conflicts as  A. People get less pay in these projects and work is more  B.More work pressure and less time horizon  C. These projects are away from home location  D. People are unaccustomed to working together and have different values

Last Answer : D. People are unaccustomed to working together and have different values

Description : Which one is a true statement relating to project communications?  A. A project sponsor is responsible for all communication methods and media.  B.Different stakeholders typically have different communication ... project.  D. Email is the only way to communicate with large numbers of people

Last Answer : B.Different stakeholders typically have different communication needs

Description : One of the greatest weaknesses of systems consulting firms is that they try to apply  estimates and methodologies that they have developed over time and applied to other  projects, most of which are very different from the current project.

Last Answer : Ans: False

Description :  . Integrity in the project management field is accomplished through all of the  following except which one?  A. Training to learn how to manage relationships with others from different ... C. Applying established project management processes D. Following the PMP Code of Professional Conduct

Last Answer : A. Training to learn how to manage relationships with others from different cultures

Description : Why is it important to understand your Stakeholders?  A. They may work in a different department or company B. They may have different technical backgrounds C. They may not care about the project D. They can be a positive or negative influence on the project (Ans.)

Last Answer : D. They can be a positive or negative influence on the project (Ans.)

Description : Which one is a true statement relating to project communications?  a. A project sponsor is responsible for all communication methods and media.  b. Different stakeholders typically have different communication ... project.  d. Email is the only way to communicate with large numbers of people.

Last Answer : b. Different stakeholders typically have different communication needs.

Description : What Are The Different Project Management Tools?

Last Answer : The different Project Management tools are MS Project, Templates, eBooks, flowcharts Compliant with PMBOK 4th Edition, EPOs (Electronic Project Offices) etc.

Description : What Are The Different Elements In Functions Points?

Last Answer : The elements in functions points are:  External Inputs: It is an elementary process which allows the data to cross the boundary from outside to inside.  External Outputs: A elementary ... purpose. The data is completely persisted outside the application and is maintained by another application.

Description : What is the difference in outcome in baking cookies, if you use butter in different aggregate phases?

Last Answer : The softer the butter, the more they will spread when being baked.