The COCOMO model takes into account different

approaches to development, reuse, etc.

a) True

b) False

1 Answer

Answer :

b) False

Related questions

Description :  The COCOMO model to convert lines of code estimates into person-month estimates  was designed by Allen Albrecht of IBM.

Last Answer : Ans: False

Description : Which model is used during early stages of the system  design afterthe requirements have been established? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : d) An early design model

Description : Which model assumes that systems are created fromreusable  components, scripting or database programming? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : a) An application-composition model

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : . Which of the following is empirical estimation technique? (i) expert judgement (ii) Delphi estimation (iii) COCOMO (iv) Critical path Method A. only i, ii & iii B. only i & ii C. only i, iii & iv D. All of the above

Last Answer : B. only i & ii

Description : Which of the following technique overcomes drawback related to LOC? A. Project Planning Sheet B. Function Point Metric C. COCOMO D. COCOMO2

Last Answer : B. Function Point Metric

Description : In Intermediate COCOMO the mode that represents complex  products is referred to as a) Embedded b) Semidetached c) Organic d) Multiplicative e) onolithic.

Last Answer : a) Embedded

Description : Explain the development phases of the detailed COCOMO model.

Last Answer : Ans A software development is carried out in four successive phases, which are as follows: 1: plan/requirements: this is the first phase of the development cycle. The requirement is analyzed, the product ... product. This requires 16% to 34% of normal effort and 18% to 34% of the development time.

Description : Explain the development phases of the detailed COCOMO model.

Last Answer : Ans A software development is carried out in four successive phases, which are as follows: 1: plan/requirements: this is the first phase of the development cycle. The requirement is analyzed, the product ... product. This requires 16% to 34% of normal effort and 18% to 34% of the development time.

Description : The model that assumes that effort and development time are functions of product size alone is (A) Basic COCOMO model (B) Intermediate COCOMO model (C) Detailed COCOMO model (D) All the three COCOMO models

Last Answer : (A) Basic COCOMO model

Description : Boehm suggests an approach that addresses project objectives,  milestones and schedules, responsibilities, management and  technical approaches and required resources, This principle is  called as . a. W3HH principle b. WHO principle c. W5HH principle d. None of the above.

Last Answer : c. W5HH principle

Description : Feasibility analysis is the first stage in the process of project development. (True/False)

Last Answer : Ans. True

Description : Requirements Management is a prerequisite for Quality-Oriented  Development. a) True b) False

Last Answer : a) True

Description : Compare the basic COCOMO model with the detailed COCOMO model .

Last Answer : Ans. COCOMO consists of a hierarchy of three increasingly detailed and accurate forms. Basic COCOMO - is a static single-valued model that computes software development effort (and cost) as a ... cost driver's impact on each step (analysis, design, etc.) of the software engineering process.

Description : A COCOMO model is (A) Common Cost Estimation Model. (B) Constructive Cost Estimation Model. (C) Complete Cost Estimation Model. (D) Comprehensive Cost Estimation Model.

Last Answer : (B) Constructive Cost Estimation Model.

Description : COCOMO stands for (A) COmposite COst MOdel (B) COnstructive COst MOdel (C) COnstructive COmposite MOdel (D) COmprehensive COnstruction MOdel

Last Answer : (B) COnstructive COst MOdel Explanation: The Constructive Cost Model (COCOMO) is an algorithmic software cost estimation model.

Description : Problems with using Lines of Code to measure the size of a product include(s) a) The creation of source code is only part of the development effort b) The Lines of Code (LOC) will differ between ... The final size (kLOC) can only be determined once the product is delivered e) All of the above.

Last Answer : e) All of the above.

Description : The entire process of a project may be considered to be made upon a number of sub- processes placed in different stages called the Work Breakdown Structure. (True/False)

Last Answer : Ans. True

Description : The advantage of following the IEEE Standard for drawing up a Project Management Plan (SPMP) - see IEEE Standard 1059.1 1987 - is a) It is drawn up by representatives from major  ... each organisation for a  particular applicationarea, development team or  technique. e) All of the above.

Last Answer : e) All of the above.

Description : Which of the following items should not be included in the  project management plan? a) The techniques and case tools to be used b) Detailed schedules, budgets and resource ... development  organisation, project responsibilities, managerial  objectives and priorities e) None of the above.

Last Answer : c) The life cycle model to be used

Description : All of the following are true regarding the Qualitative Risk Analysis process except  which one?  A. Probability and impact and expert interview are used to help correct biases that occur  in the data ... of this process used to determine  which risks need near-term response plans.

Last Answer : C. Qualitative Risk Analysis is an easy method of determining risk probability and  impact that usually takes a good deal of time to perform.

Description : Algorithmic cost estimation in different organisations may be different for the same application development, because a) Different organisations consider complexity factors differently b) Different organisations may use ... measurement of productivity may vary e) All of the above may be true.

Last Answer : e) All of the above may be true.

Description : WBS is produced by identifying the key elements, breaking each element down into  component parts and continuing to breakdown until manageable work packages have been identified. (True/False)

Last Answer : Ans. True

Description : . An independent relationship must exist between the attribute that can be measured and the external quality attribute. a) True b) False

Last Answer : b) False

Description : Project managers have to assess the risks that may affect a project. a) True b) False

Last Answer : b) False

Description :  We can accurately estimate lines of code from the problem specification. A. True B. False C. NA D. NA

Last Answer : B. False

Description : "Larger code size doesnot necessarily mean better quality or higher efficiency." A. True B. False C. NA D. NA

Last Answer : A. True

Description : An independent relationship must exist between the attribute that can be measured and the external  quality attribute. a) True b) False

Last Answer : b) False

Description : Project managers have to assess the risks that may affect a project. a) True b) False

Last Answer : b) False

Description : Withdrawal may be the most effective way to settle conflicts. (True/False)

Last Answer : Ans. True

Description : In the method of problem-solving, a committee is set up to find a solution. (True/False)

Last Answer : Ans. True

Description : The smoothing method reduces the scale of conflict by making differences seem less  important. (True/False)

Last Answer : Ans. True

Description : The Project Leader is the person responsible for the overall project. (True/False)

Last Answer : Ans. True

Description : Project leader role will require an individual with strong management skills. (True/False)

Last Answer : ns. True

Description : . A project leader or manager is expected to be completely accountable for his team  members and meeting the team’s targets. (True/False)

Last Answer : Ans. True

Description : The purpose of project planning is to identify various areas of the project work and the  influencing factors, and subsequently define the boundaries of the project performance.  (True/False)

Last Answer : Ans. True

Description : Other reported advantages include a sharper orientation toward results, better  interdepartmental coordination, and higher worker morale. (True/False

Last Answer : Ans. True

Description : The players in project management are the individuals and the organisations.  (True/False)

Last Answer : Ans. True

Description : The planning and scoping should be such that the project manager can assess every  stage of the project and the quality of the deliverable of the project at every stage. (True/False)

Last Answer : Ans. True

Description : Good plans always do not allow for flexibility to adapt to changing circumstances.  (True/False)

Last Answer : Ans. False

Description : The technical feasibility aspect of a project relates to the earning capacity of the project.  (True/False)

Last Answer : Ans. False

Description : The purpose of the analysis is to examine the desirability of investing in pre-investment  studies. (True/False)

Last Answer : Ans. True

Description : The project manager works with the project sponsor to identify the necessary resources  and team members needed to further develop the key project parameters – Cost, Scope,  Schedule, and Quality (CSSQ). (True/False)

Last Answer : Ans. True

Description : The function of project initiation is to describe all the parameters of a project and  establish the suitable project management and excellence environment necessary to  complete the project. (True/False)

Last Answer : Ans. True

Description : Scope, cost, and schedule are some of the parameters used for project negotiation.  (True/False)

Last Answer : Ans. True

Description : Project management provides the project managers and team members with the  principles they require to effectively meet the needs of the customer. (True/False)

Last Answer : Ans. True

Description : The system of monitoring and control is more effective when, along with the time- frame, there is the linkage between the physical work to be performed in each activity and  the financial expenditure to be incurred. (True/False)

Last Answer : Ans. True

Description : The most important problem faced in the implementation phase of a project is a delay  in execution. (True/False)

Last Answer : Ans. True

Description : Project closure involves releasing the final product to the customer, handing over the  project documentation, manuals, source code, and network layouts. (True/False)

Last Answer : Ans. True

Description : Project management is a rationally planned and organised effort to achieve a specific  goal. (True/False)

Last Answer : Ans. True