What Are The Different Elements In Functions Points?

1 Answer

Answer :

The elements in functions points are:
 External Inputs: It is an elementary process which allows the data to cross the boundary from outside to inside.
 External Outputs: A elementary process which allows the data passes across the boundary from inside to outside
 External Inquiry: It is an elementary process which has both input and output components which results data retrieval from one or more internal logical files and external interface files.
 Internal Logical Files: An identifiable group of logically related data that resides entirely within the applications boundary and is maintained through external inputs.
 External Interface Files: An identifiable group of logically related data that is used only for reference purpose. The data is completely persisted outside the application and is maintained by another application.

Related questions

Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost

Last Answer : A. related total costs

Description : What Are The Functions Of Project Management Tool?

Last Answer : Following are some functions of Project Management tool:  Task management.  File storage.  Reporting functions.  Commenting and message boards.  Client access.  Subcontractor task assignment.  Time tracking.

Description : Science bases its estimation of the size of a product on a) Files (Fi), Flows (Fl) and Processes (Pr) b) Lines of Code (kLOC) c) Function Points (FP) d) operands and operators e) Feature Points (FeP).

Last Answer : d) operands and operators

Description : Project crashing is the method for -------------  A. Shortening the project duration by reducing the time of one or more critical  activities  B.Adding resources at critical points  C.Doing technical analysis of the finished work for review  D.Adding duration to each activity

Last Answer : A. Shortening the project duration by reducing the time of one or more critical  activities

Description : Using the shortcut method to determine the complexity of a systems project, a very  complex system having 300 unadjusted function points would have 405 adjust function  points.

Last Answer : Ans: True

Description : Assume a systems development project effort calculation determines that the system  will require 240 function points. If the developers choose to implement this system in the  C programming language, approximately ... without more information  c. exactly the same  d. much greater  e. much less

Last Answer : e. much less

Description : . A normal system with 400 unadjusted function points would have _____ adjusted  function points when the shortcut method is use to determine the complexity of the  project.

Last Answer : c. 400

Description : Function points are used to measure the estimated _____ of a project.  a. complexity  b. effort required  c. program size  d. time required

Last Answer : c. program size

Description : Kathryn has little experience estimating the time it will take to complete a systems  project. She has just completed the planning phase of the project. What method should she use to estimate the ... b. function points  c. industry standards  d. Microsoft Project  e. more complex approach

Last Answer : c. industry standards

Description : What Are Function Points?

Last Answer : FPA is a process to break system into discrete pieces and analyze them. Software application is a combination of elementary process. FPA is the way to identify elementary processes and analyze them. There are two types of elementary process:  dynamic and static elementary process.

Description : WBS is produced by identifying the key elements, breaking each element down into  component parts and continuing to breakdown until manageable work packages have been identified. (True/False)

Last Answer : Ans. True

Description : The ____ manages the four basic elements of a project: resources, time, money, and  scope

Last Answer : Ans. Project Manager

Description : Project Integration Management ensures that various elements of a project are properly  integrated and coordinated for smooth flow of information and resources. (True/False)

Last Answer : Ans. True

Description : Business Value = (A) Tangible Elements (B) Intangible Elements (C) Tangible Elements – Intangible Elements (D) Tangible Elements + Intangible Elements

Last Answer : (D) Tangible Elements + Intangible Elements

Description : . Business Value = (A) Tangible Elements (B) Intangible Elements (C) Tangible Elements – Intangible Elements (D) Tangible Elements + Intangible Elements

Last Answer : (D) Tangible Elements + Intangible Elements

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A) Technical key resources (B) Work key structure (C) Work Breakdown Structure (WBS). (D) None of the above

Last Answer : (C) Work Breakdown Structure (WBS).

Description : Which one is a true statement relating to project communications? a. A project sponsor is responsible for all communication methods and media. b. Different stakeholders typically have different communication needs ... project. d. Email is the only way to communicate with large numbers of people.

Last Answer : b. Different stakeholders typically have different communication needs.

Description : Different activity of a project management is A. project planning B. project monitoring C. project control D. All of the above

Last Answer : B. project monitoring

Description : In a ____, the employees work for different projects in a team-like structure.

Last Answer : Ans. Project-type organisational structure

Description : The entire process of a project may be considered to be made upon a number of sub- processes placed in different stages called the Work Breakdown Structure. (True/False)

Last Answer : Ans. True

Description : Algorithmic cost estimation in different organisations may be different for the same application development, because a) Different organisations consider complexity factors differently b) Different organisations may use ... measurement of productivity may vary e) All of the above may be true.

Last Answer : e) All of the above may be true.

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description : What combines procedures and tools to manage different versions of configuration objects that are created during the process? a) Change control b) Version control c) SCIs d) None of the mentioned

Last Answer : b) Version control

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A)Technical key resources (B)Work key structure (C)Work Breakdown Structure (WBS). (D)None of the above

Last Answer : (C)Work Breakdown Structure (WBS).

Description : The activities that make up the project are not simple, repetitive  acts, such as mowing the lawn, painting the house, washing the car, or loading the delivery truck. a. They are complex b. They are simple c. Different d. Same

Last Answer : a. They are complex

Description : Something is always................each time the activities of a project are repeated. a. Different b. Same c. Various d. None of the above

Last Answer : a. Different

Description : A project has never happened before, and it will never happen again, under the..............conditions. a. Same condition b. Different condition c. Various condition d. None of the above

Last Answer : a. Same condition

Description : Outsourced projects are susceptible to conflicts as  A. People get less pay in these projects and work is more  B.More work pressure and less time horizon  C. These projects are away from home location  D. People are unaccustomed to working together and have different values

Last Answer : D. People are unaccustomed to working together and have different values

Description : Which one is a true statement relating to project communications?  A. A project sponsor is responsible for all communication methods and media.  B.Different stakeholders typically have different communication ... project.  D. Email is the only way to communicate with large numbers of people

Last Answer : B.Different stakeholders typically have different communication needs

Description : One of the greatest weaknesses of systems consulting firms is that they try to apply  estimates and methodologies that they have developed over time and applied to other  projects, most of which are very different from the current project.

Last Answer : Ans: False

Description :  . Integrity in the project management field is accomplished through all of the  following except which one?  A. Training to learn how to manage relationships with others from different ... C. Applying established project management processes D. Following the PMP Code of Professional Conduct

Last Answer : A. Training to learn how to manage relationships with others from different cultures

Description : Why is it important to understand your Stakeholders?  A. They may work in a different department or company B. They may have different technical backgrounds C. They may not care about the project D. They can be a positive or negative influence on the project (Ans.)

Last Answer : D. They can be a positive or negative influence on the project (Ans.)

Description : Which one is a true statement relating to project communications?  a. A project sponsor is responsible for all communication methods and media.  b. Different stakeholders typically have different communication ... project.  d. Email is the only way to communicate with large numbers of people.

Last Answer : b. Different stakeholders typically have different communication needs.

Description : What Are The Different Project Management Tools?

Last Answer : The different Project Management tools are MS Project, Templates, eBooks, flowcharts Compliant with PMBOK 4th Edition, EPOs (Electronic Project Offices) etc.

Description : What Are The Different Phases Of Sdlc?

Last Answer : SDLC - stands for Software Development Life Cycle. It can be divided in to 7 phases they are: 1. Preliminary Investigation (Feasibility Study). 2. Requirement Analysis (Analysis). 3. Design of the System. 4. Software Construction. 5. System Testing. 6. System Implementation. 7. System Maintenance.

Description : In which of the following systems, few rules over all

Last Answer : Oligarchy

Description : Herodatus is considered as

Last Answer : Father of History

Description : Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job. (A) Algorithmic model (B) Expert judgment (C) Bottom-up (D) Top down

Last Answer : (C) Bottom-up

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : In the initial stage of the project the probability of completing the project is ___ . (A) Zero (B) High (C) Low (D) Any of the above

Last Answer : (C) Low

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : Resorce requirement in project becomes constant while the project is in its _____ progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Five dimensions that must be managed on a project (A) Constraint, Quality, Cost, Schedule, Staff (B) Features, Quality, Cost, Schedule, Staff (C) Features, priority, Cost, Schedule, Staff (D) Features, Quality, Cost, Schedule, customer

Last Answer : (B) Features, Quality, Cost, Schedule, Staff

Description : Project performance consists of (A) Time (B) Cost (C) Quality (D) All of the above

Last Answer : (C) Quality

Description : Design phase consist of (A) Input received (B) Output received (C) Both (A) and (B) (D) None of the above

Last Answer : (C) Both (A) and (B)

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : Following is(are) the responsibility(ies) of the project manager. (A) Budgeting and cost control (B) Allocating resources (C) Tracking project expenditure

Last Answer : (C) Tracking project expenditure

Description : The project life cycle consists of (A) Understanding the scope of the project (B) Objectives of the project (C) Formulation and planning various activities (D) All of the above

Last Answer : (D) All of the above

Description : Developing a technology is an example of (A) Process (B) Project (C) Scope (D) All of the above

Last Answer : (B) Project