A ______ is the one in which the player selects more than one strategy with fixed probabilities before
playing the game.
a. Mixed strategy
b. Pure strategy
c. Complete strategy
d. Impure strategy

1 Answer

Answer :

d. Impure strategy

Related questions

Description : A _______ provides a complete definition of how a player will play a game a. Mixed strategy b. Pure strategy c. Complete strategy d. Impure strategy

Last Answer : c. Complete strategy

Description : A ______ occurs when each player selects one of his strategies a. Profit b. Decision c. Play d. Game

Last Answer : c. Play

Description : A common assumption about the players in a game is that a. Neither player knows the payoff matrix b. The players have different information about the payoff matrix c. Only one of the players pursues a rational strategy d. The specific identify of the players is irrelevant to the play of the game

Last Answer : d. The specific identify of the players is irrelevant to the play of the game

Description : The choice of the strategy is made by both the _________ simultaneously a. Decision maker b. Manager c. Competitor d. Player

Last Answer : Player

Description : In game theory, the outcome or consequence of a strategy is referred to as the a. Payoff b. Penalty c. Reward d. End-game strategy

Last Answer : a. Payoff

Description : The various alternatives or courses of actions available to each player in a game are called as ____ a. Saddle points b. Strategies c. Pay-off d. Gains

Last Answer : b. Strategies

Description : In a game, the alternatives or courses of action available to each player are called _____ a. Options b. Choices c. Actions d. strategies

Last Answer : d. strategies

Description : . In a zero-sum game, a. What one player wins, the other loses b. The sum of each player’s winnings if the game is played many times must be zero c. The game is fair-each person has an equal chance of winning d. Long-run profits must be zero

Last Answer : a. What one player wins, the other loses

Description : The participants in a game are called ______ a. Clients b. Members c. Customers d. Players

Last Answer : d. Players

Description : A strategy that is best regardless of what rival players do is called a. First-mover advantage b. A Nash equilibrium strategy c. Tit-for-tat d. A dominant strategy

Last Answer : d. A dominant strategy

Description : In project crashing, as we systematically, crash the project, direct cost of project ______ a. Increases b. Decreases c. Remain same d. None of the above

Last Answer : a. Increases

Description : An activity whose start or end cannot be delay without affecting total project completion time is called ______ activity a. Dummy b. Non-critical c. Critical d. Important

Last Answer : c. Critical

Description : In simplex method, if there is tie between a decision variable and a slack (or surplus) variable, ______ should be selected a. Slack variable b. Surplus variable c. Decision variable d. None of the above

Last Answer : c. Decision variable

Description : 44. The word “Programming” means taking decisions ______ a. Systematically b. Rapidly c. Slowly d. Instantly

Last Answer : a. Systematically

Description : 16. Operations Research simply helps in improving the ______ of the solution but does not result in a perfect solution a. Quality b. Clarity c. Look d. None of the above

Last Answer : a. Quality

Description : 10. There is a great scope for ______ working as a team to solve problems of defence by using the Operations Research approach a. Economists b. Administrators c. Statisticians and Technicians d. All of the Above

Last Answer : d. All of the Above

Description : A situation in a game where, in the payoff matrix, maximin of row is equal to minimax of column is called___ a. Centre point b. Main point c. Saddle point d. Equal point

Last Answer : c. Saddle point

Description : Who developed the Game Theory a. J.R. Hicks b. William J. Baumol c. Neumann Morgenstern d. Samuelson P.T.

Last Answer : c. Neumann Morgenstern

Description : 33. Before formulating a formal L P model it is better to a. Express each constrain in words b. Express the objective function in words c. Verbally identify decision variables d. All of the above

Last Answer : d. All of the above

Description : 63. Graphic method can be applied to solve a LPP when there are only ____ variable a. Four b. More than one c. Two d. three

Last Answer : Which oil is used in the floatation method for the purification of ores?

Description : Is bromine a compound impure substance mixture or a pure substance?

Last Answer : Need answer

Description : Which one of the following is responsible for the working of New-ton's colour disc experiment? (1) Formation of pure spectra (2) Formation of impure spectra (3) Persistence of vision (4) Principle of complementary colour

Last Answer : (3) Persistence of vision Explanation: A Newton Disc can be created by painting a disc with the seven different colours. A combination of red, green and blue in the circular disc will yield the same result. This is due to the phenomenon called persistence of vision.

Description : Intrinsic Semi-conductor is also known as-----? A. Impure-Conductor B. Pure-Conductor (Answer) C. Simple Conductor D. None of these

Last Answer : B. Pure-Conductor (Answer)

Description : Which one of the following is responsible for the working of Newton’s colour disc experiment ? (1) Formation of pure spectra (2) Formation of impure spectra (3) Persistence of vision (4) Principle of complementary colour

Last Answer : Persistence of vision

Description : _____ refers to the combination of one or more inputs to produce a particular output a. Solution b. Variable c. Process d. None of the above

Last Answer : c. Process

Description : Every combination of strategies determines an outcome known as _____ a. Regret b. Payoff c. Saddle point d. Profit matrix

Last Answer : b. Payoff

Description : What is a saddle point? a. Equilibrium point b. Balanced growth point c. Imbalanced growth point d. Unstable equilibrium point

Last Answer : c. Imbalanced growth point

Description : What is a saddle point? a. Equilibrium point b. Balanced growth point c. Imbalanced growth point d. Unstable equilibrium point

Last Answer : a. Equilibrium point

Description : Floats for critical activities will be always _____ a. One b. Zero c. Highest d. Same as duration of the activity

Last Answer : b. Zero

Description : Backward pass calculations are done to find ________ occurrence times of events a. Tentative b. Definite c. Latest d. Earliest

Last Answer : c. Latest

Description : Forward pass calculations are done to find _____ occurrence times of events a. Exact b. Earliest c. Latest d. Approximate

Last Answer : b. Earliest

Description : The second longest path in the network diagram is called a. Alternate b. Feasible c. Sub-critical d. Critical

Last Answer : c. Sub-critical

Description : Pick up the incorrect statement from the following a. The activity which consumes maximum time, is called a node b. The activity is the time consuming part of a project c. The beginning ... of a job, are called events d. Logically and sequentially connected activities and events form a network

Last Answer : a. The activity which consumes maximum time, is called a node

Description : In a PERT network, the earliest(activity) start time is the a. Earliest time that an activity can be finished without delaying the entire project b. Latest time that an activity can ... of precedence requirements d. Latest time that an activity can be finished without delaying the entire project

Last Answer : c. Earliest time that an activity can be started without violation of precedence requirements

Description : The basic difference between PERT and CPM is that a. PERT deals with events and CPM with activities b. Critical Path is determined in PERT only c. Costs are considered on CPM only d. Guessed times are used in PERT and evaluated times in CPM.

Last Answer : a. PERT deals with events and CPM with activities

Description : At the completion of the forward and backward passes, the slack for an activity is given by the a. Difference between early start and early finish b. Difference between early start and ... c. Difference between latest start and early finish d. Difference between latest start and latest finish

Last Answer : c. Difference between latest start and early finish

Description : . In what year was PERT developed? a. 1957 b. 1959 c. 1960 d. 1958

Last Answer : . 1957

Description : The CPM was developed by Rand and Walker in which year? a. 1957 b. 1958 c. 1959 d. 1960

Last Answer : a. 1957

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : For a project manager to have an effective means of identifying and communicating the planned activities and their interrelationships, he must use a network technique. One of the network ... evaluation review technique c. Path evaluation review technique d. Project execution review technique

Last Answer : b. Program evaluation review technique

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by employing three time estimates per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by using only one time factor per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : If no. of rows are not equal to number of columns and the matrix elements are profit elements then the problem is: a. Balanced and Maximization Transportation problem b. ... Transportation problem c. Balanced and Maximization Assignment problem d. Unbalanced and Maximization Assignment problem

Last Answer : a. Balanced and Maximization Transportation problem

Description : If no. of rows are equal to number of columns and the matrix elements are Time elements then the problem is: a. Balanced and Minimization Transportation problem b. ... Transportation problem c. Balanced and Minimization Assignment problem d. Unbalanced and Minimization Assignment problem

Last Answer : c. Balanced and Minimization Assignment problem

Description : ___ is one of the fundamental combinatorial optimization problems a. Assignment problem b. Transportation problem c. Optimization problem d. None of the above

Last Answer : a. Assignment problem

Description : For solving an assignment problem, which method is used? a. British b. American c. German d. None of the above

Last Answer : B. american

Description : For maximization in assignment problem, the objective is to maximize the a. Profit b. Optimization c. Cost d. None of the above

Last Answer : a. Profit

Description : An optimal solution of an assignment problem can be obtained only if a. Each row & column has only one zero element b. Each row & columns has at least one zero element c. The data is arrangement in a square matrix d. None of the above

Last Answer : d. None of the above

Description : An assignment problem is a special case of transportation problem, where a. Number of rows equals number of columns b. All rim conditions are 1 c. Values of each decision variable is either 0 or 1

Last Answer : D.variable is either 0 or 1