Give switchyard specification. 

1 Answer

Answer :

1. Type : Out door.

2. Scheme : Double main bus bar with bypass switching scheme is provided.

This allows maintenance of one bus or one CB without interruption.

3. Normal voltage : 220 kV.

4. Rated voltage : 245 kV (400 kV)

5. Impulse voltage : 1050 kV (peak)

6. One-minute level : 460 kV (rms.)

7. Dynamic current capacity: 102 kA (peak) and 40 kA for one sec.

8. Rated current capacity : 2000 A for main and 1600 A for feeder bus.

9. Clearances : Phase to earth – 2100 mm.

 Phase to phase – 2100 mm.

 Phase to ground – 5500 mm.

 Sectional clearance – 4300 mm.

 Creepage clearance – (Total) 5600 mm.

– (Protected) 2800 mm.

10. Maximum temperature rise above ambient - 45°C.

11. CB – SF6

12. Isolator – motor operated rotating type.

13. Number of bays – 16 Nos. 

Related questions

Description : Give the details of switchyard 220 kV CB, Isolator, CT, CVT and lightning arrestor.  

Last Answer : 220 kV SF6 Circuit Breaker 1. Make - ABB 2. Air pressure blocking a. Close Block - 17.3 bar. b. Open block - 16.7 bar. c. Auto reclose block - 19 bar. 3. SF6 pressure block a. Alarm - 5. ... , storage and erection. Rated voltage : 216 kV rms. Operating voltage : 184 kV rms. 

Description : Why Stones/Gravel is used in electrical Switchyard

Last Answer : Stones/Gravel is used in Electrical Switch yard because of following reasons Reasons for using Stones/Gravel in Switch yard: 1. During Short circuit current Step and Touch potential increases. ... switch yard 4. Improves yard working condition 5. Provides protection from wild life and snakes.

Description : What is the rating of switchyard battery charger and batteries? 

Last Answer : Switchyard is having Float cum boost charger of 282 V DC maximum and 100 Amps rated charger of six-pulse full wave thyristerised controlled rectifier. Batteries are tubular 220 V DC. +ve plate is made ... minutes. Specific gravity 1110 5 and specific gravity after 10 hrs discharge is 1150 5. 

Description : What is the various design of CT's in switchyard?

Last Answer : Bus coupler CT's- live tank design 2000-1000A/1A All other CT's- dead tank design 800-600-400A/1A - lines and GT. 125A/1A – SUT

Description : Why switchyard is located indoors of coastal plants?

Last Answer : Saline atmosphere will deposit on the insulators causing its flashover. The building kept under positive pressure compared with outside thus preventing the (saline) air entering from outside to inside the building. 

Description : For a fault in switchyard lightning arrestor, what protection will act?

Last Answer : Bus bar differential protection.  

Description : In 220 kV switchyard why lightning arrestor should be properly grounded?

Last Answer : a. During lightning, surges should be discharged to ground, otherwise it will puncture the equipment insulation and it is possible only when lightning arrestor is grounded properly.  b. In order to make it effective ... kV. Soil resistivity a should be minimum and may be it is 3.5 ohm per meter.  

Description : Why indoor switchyard is provided in MAPS?  

Last Answer : The salt contamination in the switchyard is avoided by providing indoor switchyard in MAPS. Because the plant is just 300 metres away from the seashore and the atmosphere is saline. This salt will get ... and to have low cost of installation and spare parts of aluminium indoor switchyard is used. 

Description : Discuss briefly subscriber loop system. Give some technical specification for subscriber lines.

Last Answer : Subscriber Loop System: Every subscriber in a telephone network is connected generally to the nearest switching office by means of a dedicated pair of wires. Subscriber loop refers to this pair of wires. It is un ... 1. Diameter of wire 2. D.C. resistance per Km 3. Attenuation per Km 

Description : How is preheat for tack welds during assembly and fit up determined? a) By the welders as they have extensive knowledge b) The fabrication specification/WPS will give the requirements c) The fabrication drawing will give all the information d) Any temperature will do as it is only a tack weld

Last Answer : b) The fabrication specification/WPS will give the requirements

Description : Explain the use of the following components in electrical wiring system and give specification of each: (i) MCB (ii) ELCB

Last Answer : i) MCB (Miniature Circuit Breaker)  * MCB provides short circuit protection. * MCB provides overload protection * ELCB provides earth fault protection. * MCB is in series with load and ELCB is ... The low sensitivity ELCB are used for electrical machine the rating is in between the 3A to 10 A

Description : Give the specification of three phase transformer as per IS 1180(Part-1) 1989. 

Last Answer : Specification of 3-phase transformer: 1) kVA rating of transformer 2) Voltage ratings for the primary and secondary voltages 3) HV and LV currents 4) Operating frequency of the transformer 5) % impedance of ... the manufacturer 16) Weight of core 17) Weight of winding 18) Volume of oil in litres.

Description : Is there a standard cross-industry scale specification for action figures?

Last Answer : http://actionfigures.about.com/od/gettingstarted/a/action_figure_scales.htm This page has tons of good information about all the different sizes and standards of action figures.

Description : If central heating system cannot be installed as per the clients original specification what should a plumber do?

Last Answer : advise their immeddiate supervisor or employer about the problem, obtain the clients verbal agreemenet to carry out the alterations, obtain the clients written agreement to carry out the alterations, proceed when the clients quantity surveoyor issues a variationorder

Description : If central heating system cannot be installed as per the clients original specification what should a plumber do?

Last Answer : advise their immeddiate supervisor or employer about the problem, obtain the clients verbal agreemenet to carry out the alterations, obtain the clients written agreement to carry out the alterations, proceed when the clients quantity surveoyor issues a variationorder

Description : What type of memory is not directly addressable by the CPU and requires special softw3are called EMS (expanded memory specification)? A) Extended B) Expanded C) Base D) Conventional

Last Answer : Answer : B

Description : What is the first stage in software development? A) Specification and design B) Testing C) System Analysis D) Maintenance

Last Answer : Answer : C

Description : What is difference between a Cursor declared in a procedure and Cursor declared in a package specification ?

Last Answer : A cursor declared in a package specification is global and can be accessed by other procedures or procedures in a package. A cursor declared in a procedure is local to the procedure that can not be accessed by other procedures.

Description : And ITU-T specification code that deals with the telephone circuits. A. X series B. T series C. V series D. I series

Last Answer : C. V series

Description : What is the most important specification of loudspeakers and microphones? A. Frequency response B. Power density C. Field Strength D. Gain

Last Answer : A. Frequency response

Description : If a contractor proposes to increase concrete cover beyond contractual specification (i.e. 40mm to 70mm), shall engineers accept the proposal?

Last Answer : In contractual aspect, based on the requirement of General Specification of Civil Engineering Works (1992 Edition), the tolerance of concrete cover is between + ... larger cover. Therefore, with an increase of concrete cover, the crack width will increase which is undesirable.

Description : Which act’s important specification was the provincial autonomy.

Last Answer : 1935

Description : Which one of the following statements is true? a. Independent reviews and quality audits form part of quality assurance to ensure the project manager delivers on time and to budget. ... Quality planning enables the project manager to manage the trade-off between customer expectations  and budget

Last Answer : c. Quality control verifies that the project deliverables conform to specification, are fit for purpose and  meet stakeholder expectations.

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following can estimate size of project directly from problem specification? A. LOC B. Function Point Metric C. Both D. None

Last Answer : B. Function Point Metric

Description :  We can accurately estimate lines of code from the problem specification. A. True B. False C. NA D. NA

Last Answer : B. False

Description : Which of the following activity is undertaken immediately after feasibility study and before  the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling

Last Answer : A. Project Planning

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : It is often difficult to estimate size at an early stage in a project  when only a specification is available a) True b) False

Last Answer : a) True

Description : Which one of the following is not a fundamental activity for processes in engineering ? a) Verification b) Validation c) design and implementation d) evolution e) specification

Last Answer : a) Verification

Description : Arrange the following steps to form a basic Engineering  Process Model. i. Test ii. Design iii. Install iv. Specification v. Manufacture vi. Maintain a) 2, 4, 5, 1, 6, 3 b) 4, 2, 5, 1, 3, 6 c) 2, 4, 5, 1, 3, 6 d) 4, 2, 5, 1, 6, 3

Last Answer : a) 2, 4, 5, 1, 6, 3

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a. Specification delays b. Product competition c. Testing d. Staff turnover

Last Answer : c. Testing

Description : having one goal or purpose and that must be completed by ……. a) a specific time b) within budget, c) according to specification d) all the above

Last Answer : d) all the above

Description : In tracking, reporting and controlling, the process engage whether the project results are in accordance with a. project plans b. performance specification c. both a, b d. none of the above

Last Answer : c. both a, b

Description : Which one of the following statements is true?  a. Independent reviews and quality audits form part of quality assurance to ensure the project  manager delivers on time and to budget. ... planning enables the project manager to manage the trade-off between customer  expectations and budget.

Last Answer : c. Quality control verifies that the project deliverables conform to specification, are fit for  purpose and meet stakeholder expectations.

Description : Which technique is being investigated as an approach to automatic programming? a) generative CAI b) specification by example c) non-hierarchical planning d) all of the mentioned

Last Answer : b) specification by example

Description : Which is the complete specification of the state of the world? a) Atomic event b) Complex event c) Simple event d) None of the mentioned

Last Answer : a) Atomic event

Description : A module contains machine code with specification on_ _ a. Relative addresses b. Absolute addresses c. Object program d. None of these

Last Answer : a. Relative addresses

Description : To design a program it requires __ os a. Program specification b. Code specification c. Instruction specification d. Problem specification

Last Answer : a. Program specification

Description : A good specification should be ? Unambiguous Distinctly Specific Functional All of Above

Last Answer : All of Above

Description : SRS stands for ? Software requirement specification Software requirement solution System requirement specification None of Above

Last Answer : Software requirement specification

Description : IEEE 802.1d specification, defines _________criteria for a transparent bridges. A) two B) three C) four D) none of the above

Last Answer : three

Description : The physical layer provides __________ a. mechanical specifications of electrical connectors and cables b. electrical specification of transmission line signal level c. specification for IR over optical fiber d. all of the mentioned

Last Answer : d. all of the mentioned

Description : The physical layer provides __________ A. mechanical specifications of electrical connectors and cables B. electrical specification of transmission line signal level C. specification for IR over optical fiber D. all of the mentioned

Last Answer : D. all of the mentioned

Description : What specifications does physical layer provides __________. A. mechanical specifications of electrical connectors and cables B. electrical specification of transmission line signal level C. specification for IR over optical fiber D. all of the mentioned

Last Answer : D. all of the mentioned

Description : The physical layer provides __________ a) mechanical specifications of electrical connectors and cables b) electrical specification of transmission line signal level c) specification for IR over optical fiber d) all of the mentioned

Last Answer : d) all of the mentioned

Description : As per the world health organisation (WHO) specification, the maximum permissible concentration (i.e., TLV) of particulate matter in air is __________ μg/m3 .(μg-microgram) (A) 10 (B) 90 (C) 800 (D) 750

Last Answer : (B) 90

Description : Which of the following is a specification for multicast discovery on a LAN? a) WS-Agent b) WS-Discovery c) WS-SOAP d) All of the mentioned

Last Answer : WS-Discovery