What is the first stage in software development? A) Specification and design B) Testing C) System Analysis D) Maintenance

1 Answer

Answer :

Answer : C

Related questions

Description : What are the three generic phases of software engineering? (A) Definition, development, support (B) What, how, where (C) Programming, debugging, maintenance (D) Analysis, design, testing

Last Answer : (A) Definition, development, support

Description : IEEE 830-1993 is a IEEE recommended standard for (A) Software requirement specification. (B) Software design. (C) Testing. (D) Both (A) and (B)

Last Answer : (A) Software requirement specification.

Description : Which statement best describes the Software as a Service cloud delivery model? A. A virtual machine provisioned and provided from the cloud which allows the customer to deploy custom ... and run the application on the customer's own computers and simplifying maintenance and support.

Last Answer : An application delivered to the client from the cloud which eliminates the need to install and run the application on the customer's own computers and simplifying maintenance and support.

Description : Match every stage of the software Development Life cycle with the Testing Life cycle: i. Hi-level design a Unit tests ii. Code b Acceptance tests iii. Low-level design c System tests iv. Business requirements d Integration tests a) i-d , ii ... i-b , ii-a , iii-d , iv-c d) i-c , ii-a , iii-d , iv-b

Last Answer : d) i-c , ii-a , iii-d , iv-b

Description : Software testing activities should start A. As soon as the code is written B. During the design stage C. When the requirements have been formally documented D. As soon as possible in the development lifecycle

Last Answer : C. When the requirements have been formally documented

Description : State True or False. 1. Term of reference is the final output of Feasibility Study 2. Design specification report is the final output of System Analysis A) 1-true, 2-true B) 1-false, 2-true C) 1-true, 2-false D) 1-false, 2-false

Last Answer : A) 1-true, 2-true

Description : State True or False. i) Master Development Plan basically is a schedule of various applications to be comprised. ii) It consists of start and finish dates of a system analysis, design implementation and maintenance activities. ... B) i-False, ii-True C) i-True, ii-False D) i-False, ii-False

Last Answer : A) i-True, ii-True

Description : During which stage of new product development does the firm consider profitability ? 1. Idea Generation 2. Testing 3. Business Analysis 4. Product Development 5. Compatibility research

Last Answer : Business Analysis

Description : ) During which stage of new product development does the firm consider profitability? A)Idea generation B)Testing C)Business analysis D)Product development E)Compatibility research

Last Answer : C)Business analysis

Description : What are the stages in the compilation process? A) Feasibility study, system design and testing B) Implementation and documentation C) Lexical Analysis, syntax analysis, and code generation D) None of the above

Last Answer : Answer : C

Description : Software testing techniques are most effective if applied immediately after  (1) requirement specification (2) design (3) coding (4) integration

Last Answer : 1

Description : Which of the following uses Impact Analysis most? a) Component testing b) Non-functional system testing c) User acceptance testing d) Maintenance testing

Last Answer : d) Maintenance testing

Description : The major shortcoming of waterfall model is (A) the difficulty in accommodating changes after requirement analysis. (B) the difficult in accommodating changes after feasibility analysis. (C) the system testing. (D) the maintenance of system.

Last Answer : (A) the difficulty in accommodating changes after requirement analysis.

Description : A sales representative from a software company shows an accounting firm that a new software package can perform bookkeeping tasks that the firm's present package cannot. The accounting firm ... ? A)problem recognition B)product specification C)product supplier search D)product selection

Last Answer : A)problem recognition

Description : Defects are least costly to correct at what stage of the development cycle? A. Requirements B. Analysis & Design C. Construction D. Implementation

Last Answer : A. Requirements

Description : Adaptive maintenance is a maintenance which ............. (A) Correct errors that were not discovered till testing phase. (B) is carried out to port the existing software to a new environment. (C) improves the system performance. (D) both (B) and (C)

Last Answer : (B) is carried out to port the existing software to a new environment.

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : There are several primary categories of procedures. Which of the following is not a primary category of procedures? 1) Testing 2) Backup and recovery 3) Firewall development 4) Design

Last Answer : 3) Firewall development

Description : There are several primary categories of procedures. Which of the following is not a primary category of procedures? 1 Testing 2 Backup and recovery 3 Firewall development 4 Design

Last Answer : 3 Firewall development

Description : Which phase is not available in software life cycle? (A) Coding (B) Testing (C) Maintenance (D) Abstraction

Last Answer : (D) Abstraction

Description : Which of the following statement(s) is/are TRUE with regard to software testing? I. Regression testing technique ensures that the software product runs correctly after the changes during maintenance. II. Equivalence partitioning is a ... (1) only I (2) only II (3) both I and II (4) neither I nor II

Last Answer : (1) only I 

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a. Specification delays b. Product competition c. Testing d. Staff turnover

Last Answer : c. Testing

Description : When examining a completed bend test, the angle of the bend was found to be 185°. The testing specification calls for the sample to have been formed through 180°? a) They should be acceptable as ... then re-examined d) They should be rejected as the angle is not close enough to be acceptable

Last Answer : c) New bends should be produced and bent to 180° then re-examined

Description : SRS is also known as specification of (A) White box testing (B) Stress testing (C) Integrated testing (D) Black box testing

Last Answer : (D) Black box testing

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : The main purpose of integration testing is to find (A) design errors (B) analysis errors (C) procedure errors (D) interface errors

Last Answer : (D) interface errors

Description : Which of the following activity is undertaken immediately after feasibility study and before  the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling

Last Answer : A. Project Planning

Description : We use the output of the requirement analysis, the requirement specification as the input for writing :- a) User Acceptance Test Cases b) Integration Level Test Cases c) Unit Level Test Cases d) Program specifications

Last Answer : a) User Acceptance Test Cases

Description : In which testing strategy requirements established during requirements analysis are validated against developed software? (A) Validation testing (B) Integration testing (C) Regression testing (D) System testing

Last Answer : (A) Validation testing

Description : Which one of the following statements is incorrect ? (A) Pareto analysis is a statistical method used for analyzing causes, and is one of the primary tools for quality management. (B) Reliability of ... (D) In white-box testing, the test cases are decided from the specifications or the requirements.

Last Answer : (D) In white-box testing, the test cases are decided from the specifications or the requirements.

Description : It is often difficult to estimate size at an early stage in a project  when only a specification is available a) True b) False

Last Answer : a) True

Description : After deciding to order replacement parts for aging machinery, the buyer for a construction company examines catalogues and trade publications. The buyer is probably at which stage of the ... recognition B)product specification C)product-supplier search D)product selection E)product evauation

Last Answer : C)product-supplier search

Description : After deciding to order replacement parts for aging machinery, the buyer for a construction company examines catalogues and trade publications. The buyer is probably at which stage of the ... recognition B)product specification C)product-supplier search D)product selection E)product evauation

Last Answer : C)product-supplier

Description : After deciding to order replacement parts for ageing machinery, the buyer for a construction company examines catalogues and trade publications. The buyer is probably at which stage of the ... recognition B)product specification C)product-supplier search D)product selection E)product evauation

Last Answer : C)product-supplier search

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : What is a Research Design? (A) A way of conducting research that is not grounded in theory. (B) The choice between using qualitative or quantitative methods. (C) The style in which you present your research ... e.g. a graph. (D) A framework for every stage of the collection and analysis of data. 

Last Answer : (D) A framework for every stage of the collection and analysis of data.

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Which one of the following is not a fundamental activity for processes in engineering ? a) Verification b) Validation c) design and implementation d) evolution e) specification

Last Answer : a) Verification

Description : Arrange the following steps to form a basic Engineering  Process Model. i. Test ii. Design iii. Install iv. Specification v. Manufacture vi. Maintain a) 2, 4, 5, 1, 6, 3 b) 4, 2, 5, 1, 3, 6 c) 2, 4, 5, 1, 3, 6 d) 4, 2, 5, 1, 6, 3

Last Answer : a) 2, 4, 5, 1, 6, 3

Description : To design a program it requires __ os a. Program specification b. Code specification c. Instruction specification d. Problem specification

Last Answer : a. Program specification

Description : Features to be tested, approach, item pass/fail criteria and test deliverables should be specified in which document? a) Test case specification b) Test procedure specification c) Test plan d) Test design specification

Last Answer : c) Test plan

Description : Compared with other phases of the new product development process, the largest number of new product ideas are rejected during the ______ phase 1. idea generation 2. concept testing 3. business analysis 4. screening 5. test marketing

Last Answer : screening

Description : When a company reviews sales, costs, and profit projections for a new product to find out whether these factors satisfy the company's objectives, they are in which of the following new ... testing 2. Commercialization 3. Business analysis 4. Marketing strategy development 5. none of these

Last Answer : Business analysis

Description : Compared with other phases of the new product development process, the largest number of new -product ideas are rejected during the __________ phase. A)idea generation B)concept testing C)business analysis D)screening E)test marketing

Last Answer : D)screening

Description : SRS stands for ? Software requirement specification Software requirement solution System requirement specification None of Above

Last Answer : Software requirement specification