The definition and use of configuration management standards is 

essential for quality certification in

a) ISO 9000

b) CMM

c) CMMI

d) All of the mentioned

1 Answer

Answer :

d) All of the mentioned

Related questions

Description : Configuration Management can be administered in several ways. These include a) A single configuration management team for the whole  organization b) A separate configuration management team for ... c) Configuration Management distributed among the project  members d) All of the mentioned

Last Answer : a) A single configuration management team for the whole  organization

Description : Which is a configuration management concept that helps us to  control change without seriously impeding justifiable change? a) Baselines b) Source code c) Data model d) None of the mentioned

Last Answer : a) Baselines

Description : Configuration management is best described as: a. control in the implementation of changes to project schedules. b. an organization to review proposed changes to the project deliverables ... and documentation. d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : Choose the correct option according to given below  statement. Statement 1: Umbrella activities are independent of any one framework activity and occur throughout the process. Statement 2: quality assurance, ... . c. Only statement 3 is correct. d. Statement 1 and statement 3 are correct

Last Answer : b. Statement 1 and statement 2 are correct.

Description : Configuration management is best described as:  a. control in the implementation of changes to project schedules.  b. an organisation to review proposed changes to the project deliverables ... and documentation.  d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : The ISO quality assurance standard that applies to software engineering is (A) ISO 9000 (B) ISO 9001 (C) ISO 9002 (D) ISO 9003

Last Answer : (B) ISO 9001

Description : What Are The Five Levels In Cmmi?

Last Answer : In case of development CMMI ratings are awarded from 2 to 5.  Level 2 - Managed  Level 3 - Defined  Level 4 - Quantitatively Managed  Level 5- Optimizing

Description : What Is Cmmi?

Last Answer :  CMMI stands for Capability Maturity Model Integration.  It is a process improvement approach that provides organizations with the essential elements for effective process improvement.

Description : What Is Cmmi? What Are The Five Levels In Cmmi?

Last Answer : Capability Maturity Model(CMM) is a maturity model of certain business processes in software engineering. The CMM identifies five levels of process maturity for an organization:  ... measurement takes place.  Optimizing - process management includes deliberate process optimization and improvement

Description : Describe Each Levels Of Cmmi?

Last Answer : Maturity level 1 - Initial At this level, there is no proven processes and has no stable environment in the organization. This type of organization frequently exceeds the ... 5 - optimizing These organizations persistently try to improve performance through innovative technological improvement.

Description : Compare CMMI and ISO for software w.r.to i)scope ii)Approach Iii) Implementation.

Last Answer : Difference between CMMI and ISO based on SCOPE: CMMI is rigid and extends only to businesses developing software intensive systems. ISO is flexible and applicable to all manufacturing industries. CMMI ... in-house teams, or rely on external auditors to see through the implementation process. 

Description : What is CMM? Describe its levels & compare it with ISO 9001?

Last Answer : Ans. CAPABILITY MATURITY MODEL (CMM): CMM is a strategy for improving the software process, irrespective of the actual life cycle model used. Software Engineering Institute (SEI) of Carnegie- ... in the CMM are called out in the auditing practices of the verifying implementation common feature.

Description : According to a statistical report: over 30% of all projects are cancelled before completion and over 70% of the remainder fail to deliver expected features . What must be the reason for such ... change management b) Poor requirements management c) Poor quality control d) All of the mentioned

Last Answer : b) Poor requirements management

Description : What combines procedures and tools to manage different versions of configuration objects that are created during the process? a) Change control b) Version control c) SCIs d) None of the mentioned

Last Answer : b) Version control

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : Which of the following is incorrect activity for the configuration management of a software system? a) Internship management b) Change management c) Version management d) System management

Last Answer : a) Internship management

Description : Which of the following is incorrect activity for the configuration management of a software system? a) Internship management b) Change management c) Version management d) System management

Last Answer : a) Internship management

Description : Following is (are) the tool(s) for changing a process (A)Change Management System (CMS) (B)Configuration Management (CM) (C)Both (A) and (B) (D)None of the above

Last Answer : (C)Both (A) and (B)

Description : Which of the following is not a Configuration Management  Activity? a) Configuration item identification b) Risk management c) Release management d) Branch management

Last Answer : b) Risk management

Description : Which of the following is incorrect activity for the configuration management of a system? (A)Internship management (B) Change management (C) Version management (D) System management

Last Answer : (A)Internship management

Description : Your company has asked you to be the project manager for the product introduction  of its new DeskTop Rock media system. You recently published the project scope  statement. Which ... . Constraints  B. Project specifications  C. Requested changes D. Project configuration management requirements

Last Answer : C. Requested changes

Description : The main purpose of the Project Management Plan is to:  a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk  of alternative options.  b ... managing the project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for  managing the project.

Description : What is the most critical aspect in developing a project plan that meets project  specifications within the timeframe and at the lowest costs? Select one: a. Assessing risk management b ... business partners e. Developing a project execution plan that matches the complexity level of the project

Last Answer : e. Developing a project execution plan that matches the complexity level of the project

Description : What is Onion diagram illustrates? a) It illustrates the connection between the layers in communications protocols, such as the International Standards Organization Open Systems Interconnection (ISO OSI) model,or the ... with the kernel at the core c) All of the mentioned d) None of the mentioned

Last Answer : None of the mentioned

Description : What is the definition of Earned Value Management? A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.  B. ... approach that combines the scope and cost baseline into a project performance and  progress measurement tool.

Last Answer : A. An approach that combines the scope, schedule, and cost baseline into a project  performance and progress measurement tool.

Description : Project management includes the tools, techniques, and essential to  deal with the growth of products a. Knowledge b. Skill c. Attitude d. Confidence

Last Answer : a. Knowledge

Description : Which one of the following is not a key process area in CMM level 5 ? (A) Defect prevention (B) Process change management (C) Software product engineering (D) Technology change management

Last Answer : (C) Software product engineering

Description : The process each manager follows during the life of a project is known as a) Project Management b) Manager life cycle c) Project Management Life Cycle d) All of the mentioned

Last Answer : c) Project Management Life Cycle

Description :  The process each manager follows during the life of a project is known as a) Project Management b) Manager life cycle c) Project Management Life Cycle d) All of the mentioned

Last Answer : c) Project Management Life Cycle

Description : Why is Requirements Management Important ? It is due to the changes a) to the environment b) in technology c) in customer’s expectations d) in all of the mentioned.

Last Answer : d) in all of the mentioned.

Description : Which of the following is a requirement management activity ? a) Investigation b) Design c) Construction and Test d) All of the mentioned

Last Answer : d) All of the mentioned

Description : The process each manager follows during the life of a project is known as (A)Project Management (B) Manager life cycle (C) Project Management Life Cycle (D)All of the mentioned

Last Answer : (C) Project Management Life Cycle

Description : Which one of the following does project change control primarily seek to ensure? a. All variance to the project scope is evaluated. b. No reduction in the perceived quality of the project outcome. ... project do not increase. d. Any decrease in the scoped deliverable of the project is rejected.

Last Answer : a. All variance to the project scope is evaluated.

Description : . In project management, the term quality is best defined as: a. inspection, testing and measurement. b. reviews and audits. c. fitness for purpose of deliverables. d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description :  Which of the following is the most important element of Project Management Plan that is useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : Which of the following is a quality management system that gives titles to specialists and requires a cost-benefit analysis? Select one: a. Lean accounting b. Business process re-engineering c. Kaizen d. Six Sigma e. Total Quality Management

Last Answer : d. Six Sigma

Description : Requirements Management is a prerequisite for Quality-Oriented  Development. a) True b) False

Last Answer : a) True

Description : Which of the following is the most important element of Project Management Plan that is  useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : Which one of the following does project change control primarily seek to ensure?  a. All variance to the project scope is evaluated.  b. No reduction in the perceived quality of the project outcome ... project do not increase.  d. Any decrease in the scoped deliverable of the project is rejected

Last Answer : a. All variance to the project scope is evaluated.

Description : In project management, the term quality is best defined as:  a. inspection, testing and measurement.  b. reviews and audits.  c. fitness for purpose of deliverables.  d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : )Quality costs include : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.  2. Only costs classified as prevention, detection and ... rework due to defects, customer returns and warranty costs.  4. The expense of upper management

Last Answer : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.

Description : The primary components of the quality management function are : 1. quality planning  2. quality control and assurance  3. quantitative measurement  4. quantitative assessment of the project

Last Answer : 5. a and b

Description : Quality management system certificate has __________ A. ISO 9001. C. ISO 9005 B. ISO 9004. D. ISO 9006

Last Answer : ISO 9001

Description : Draw and explain axis configuration as per ISO, for horizontal spindle CNC machines.

Last Answer : Axis Configuration for Horizontal Spindle CNC Machines: The first axis to be identified is the Z axis. This is then followed by the X and Y axes respectively. Z Axis and ... are in the directions which advance right-hand screws in the positive X, Y and Z directions respectively.  

Description : Kathryn has little experience estimating the time it will take to complete a systems  project. She has just completed the planning phase of the project. What method should she use to estimate the ... b. function points  c. industry standards  d. Microsoft Project  e. more complex approach

Last Answer : c. industry standards

Description : High-performance standards are set for team members in____ style.

Last Answer : Ans. Pace-setting

Description : Jim Smith, the project manager for a high-profile project, has permitted the users to  add additional features to the systems project. The schedule and costs are now running  over. This project suffers from poor standards.

Last Answer : Ans: False

Description : Using typical industry standards for estimating project time schedules, the estimated  analysis phase would be 10 person-months for a systems project where the planning phase was completed in 7.5 person-months.

Last Answer : Ans: True

Description : Using typical industry standards for estimating project time schedules, the estimated  analysis phase would be 25 person-months for a systems project where the planning phase was completed in 30 person-months.

Last Answer : Ans: False

Description : When estimating project time schedules using industry standards for a systems project,  the following values are acceptable: 15% for planning, 25% for analysis, 50% for design,  and 10% for implementation.

Last Answer : Ans: False