Which of the following is a quality management system that gives titles

to specialists and requires a cost-benefit analysis?

Select one:

a. Lean accounting

b. Business process re-engineering

c. Kaizen

d. Six Sigma

e. Total Quality Management

1 Answer

Answer :

d. Six Sigma

Related questions

Description : This process management initiative reduces material cost and, to a lesser degree, labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : c. Continuous Product Improvement systems (CPI)

Description : Fill in the blank. The _____ is the difference between the additional money spent on  prevention and the corresponding reduction in the cost of failure. Select one: a. cost-benefit analysis b. implicit cost c. cost of quality d. variable cost e. cost-utility analysis

Last Answer : c. cost of quality

Description : Once the project is approved and moves into the planning stage, what  happens in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : The TQM initiative reduces material costs and labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)/Six Sigma

Description : These TQM initiatives reduce administrative overhead; reduces the R&D cycle time and enhances the effectiveness of the promotion and sales budget. a. Concurrent Engineering (CCE); Channel Support systems ... Inventory d. Channel Support systems and Six Sigma e. Quality Initiative Training (QIT)

Last Answer : b. Quality Function Deployment and Benchmarking

Description : A(n) _ is a review of the quality plan, procedures, data collection, and analysis by  an outside group. Select one: a. scope document b. project appraisal c. cost performance index d. analogous estimate e. quality audit

Last Answer : e. quality audit

Description : Where can I obtain my lean six sigma certification?

Last Answer : KAIZEN course should be enough for your certification. This is a traditional school of production efficiency, Japanese way. It is available online and offline as well.

Description : What Is Six Sigma?

Last Answer : SIX sigma is one of the business management strategies. Six Sigma is used to improve quality of process outputs which identifies and removes the causes of defects and variations in manufacturing ... sequence of steps is followed by each six sigma project and has quantified financial targets.

Description : Who Forms The Part Of Six Sigma Implementation Team?

Last Answer : Attaining Six Sigma is a team effort. An organization who wants to attain Six Sigma needs a lot of restructuring and change in attitude. It includes building up the following roles to take up the ... Green Belts-These are like the soldiers on the war front who actually implement the planned action.

Description : Which of Which of the foll the following is owing is not considered not considered part of part of Total Quality? Total Quality? a. A focus on the customers and customers and stakeholders stakeholders b. A process focus A process focus c. Participation Participation and team work d. Six Sigmav

Last Answer : d. Six Sigmav

Description : Once the project is approved and moves into the planning stage, what happens  in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : According to the Project Management Institute (PMI), project  management is defined as the application of knowledge, _____, _____, and  techniques to project activities to meet the project requirements . Select ... b. tools, analysis c. analysis, theories d. skills, tools e. skills, theories

Last Answer : d. skills, tools

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : The main purpose of the Project Management Plan is to:  a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk  of alternative options.  b ... managing the project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for  managing the project.

Description : When developing a project's scope statement, which of the following should not be  included? 1. Project justification.  2. Cost/benefit analysis  3. Project deliverables  4. Measurable objectives

Last Answer : 1. Project justification.

Description : Fill in the blanks. It is during the ______________ phase that the decision should be  made regarding whether the project should continue. During this phase, ____________  must be considered and weighed ... . closeout, resources c. execution, performance d. planning, timing e. initiation, risk

Last Answer : e. initiation, risk

Description : Complete the following statement. As the project progresses into the  execution phase: Select one: a. risks need to be checked off on activities that have been performed. b. the total risk on ... risk breakdown structure needs to be examined to be sure all the risk events have  been avoided.

Last Answer : a. risks need to be checked off on activities that have been performed.

Description : When a project manager starts to plan a new project budget, the cost  of which project management process group is expected to be lowest? Select one: a. Initiating b. Executing c. Monitoring and controlling d. Closing e. Planning

Last Answer : d. Closing

Description : Which of the following statements is most correct? A. For small companies, long-term debt is the principal source of external financing. B. Current assets of the typical manufacturing firm account ... the financial manager to make a decision and not address the issue again for several months.

Last Answer : B. Current assets of the typical manufacturing firm account for over half of its total assets.

Description : )Quality costs include : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.  2. Only costs classified as prevention, detection and ... rework due to defects, customer returns and warranty costs.  4. The expense of upper management

Last Answer : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.

Description : Describe six sigma for software engineering.

Last Answer : Six Sigma is the most widely used strategy for statistical quality assurance in industry today. Originally popularized by Motorola in the 1980s, the Six Sigma strategy -is a rigorous and disciplined ... variation is sometimes called the DMADV (define, measure, analyze, design, and verify) method.

Description : What is the most critical aspect in developing a project plan that meets project  specifications within the timeframe and at the lowest costs? Select one: a. Assessing risk management b ... business partners e. Developing a project execution plan that matches the complexity level of the project

Last Answer : e. Developing a project execution plan that matches the complexity level of the project

Description : In proper capital budgeting analysis we evaluate incremental cash flows. A. accounting B. operating C. before-tax D. financing

Last Answer : B. operating

Description : Fill in the blank. Risk must be considered in the _____ phase and weighed against  the potential benefit of the project’s success in order to decide if the project should  be chosen. Select one: a. completion b. closeout c. execution d. planning e. initiation

Last Answer : e. initiation

Description :  Root Cause Analysis relates to: A. Process Analysis B. Quality Audits C. Quality Control Measurements D. Performance Measurements

Last Answer : A. Process Analysis

Description : Process Analysis is a function of: A. Performance Analysis B. Quality Metrics C. Process Improvement Plan D. Quality Improvement Plan

Last Answer : C. Process Improvement Plan

Description : Root Cause Analysis relates to: A. Process Analysis B. Quality Audits C. Quality Control Measurements D. Performance Measurements

Last Answer : A. Process Analysis

Description : Process Analysis is a function of: A. Performance Analysis B. Quality Metrics C. Process Improvement Plan D. Quality Improvement Plan

Last Answer : C. Process Improvement Plan

Description : Which one of the following statements best describes the use of an issue log? a. A summary of all possible alternative resolutions of an issue. b. A summary of all the project issues, their ... for capturing all issues. d. A tool to ensure that the issue management process is adhered to.

Last Answer : b. A summary of all the project issues, their analysis and status.

Description : The process of assessing the probability and consequences of identified risks to the project objectives, assigning a risk score to each risk, and creating a list of prioritized risks describes ... Risk Analysis B. Risk Identification C. Qualitative Risk Analysis D. Risk Management Planning

Last Answer : C. Qualitative Risk Analysis

Description : Which one of the following statements best describes the use of an issue log?  a. A summary of all possible alternative resolutions of an issue.  b. A summary of all the project issues, their ... for capturing all issues.  d. A tool to ensure that the issue management process is adhered to.

Last Answer : b. A summary of all the project issues, their analysis and status.

Description : Complete the following statement. The method of incorporating change into  project planning and execution processes is called the: Select one: a. project logic diagram. b. change management process. c. milestone schedule d. critical path e. rough order of magnitude

Last Answer : b. change management process.

Description :  According to PMBOK, project management process groups are iterative, which  was originally defined by Walter Shewhart and later modified by Edward Deming.  Generally, one outcome from a previous process can serve ... -Do-Check-Act cycle c. Project phases d. PM processes e. HR process cycle

Last Answer : b. Plan-Do-Check-Act cycle

Description : What is the lean sigma training?

Last Answer : Lean Six Sigma is a management strategy used to optimize a business decision-making and improve manufacturing processes. It can be trained at www.sigmapro.com, www.lean.org or www.6sigma.us.

Description : Petri is working for Nokia in Finland. He has completed 10 months of his 12-month project, budgeted at $800,000. His earned value analysis shows that variance at  completion is $75,000. What is the estimate at completion value ... : a. 725,000 b. -725,000 c. -$875,000 d. $875,000 e. $800,000

Last Answer : d. $875,000

Description : According to the PMBOK guide, which of the following statements is  right in terms of using reserve analysis to determine a project budget? Select one: A. Reserve analysis always plans ... not practical. E. Contingency reserves have never been a concern when planning a project budget.

Last Answer : A. Reserve analysis always plans contingency reserves for unexpected project scope and  project costs, which are part of your project budget.

Description : Quality control in the final analysis is : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements  2. a production system  3. an inspection system  4. fitness for purpose

Last Answer : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements

Description : Setting the number of defects before the lot is rejected, is a direct responsibility of : 1. a functional worker  2. the project manager  3. management  4. the accounting department

Last Answer : 3. management

Description : The project scope statement furnishes the basis for: 1. Provides links to the clients functional management groups  2. Allowing the project to move to the next phase . A way to provide updated information to the accounting department

Last Answer : 1. Provides links to the clients functional management groups

Description : When was six sigma and quality software first used in commercial businesses?

Last Answer : They are first used in the early 80's and POS systems of various restaurants and retail. They are popular today when it comes to automatic inventory and overall record keeping of any size ... originally developed and used by Motorola in 1981, and was distributed on the global market in 1986.

Description : What is Six Sigma? a) It is the most widely used strategy for statistical quality assurance b) The Six Sigma refers to six standard deviations c) It is the most widely used ... refers to six standard deviations d) A Formal Technical Review(FTR) guideline for quality walkthrough or inspection

Last Answer :  Ans: c

Description : This set of Software Engineering Multiple Choice Questions & Answers (MCQs) focuses on Project  Management . 1. Which of the following is not project management goal? a) Keeping overall ... agreed time c) Maintaining a happy and well-functioning development team d) Avoiding customer complaints

Last Answer : d) Avoiding customer complaints

Description : Which one of the following best defines a benefit? a. A positive result of stakeholder management. b. The successful management of a project. c. An improvement resulting from project deliverables. d. The successful delivery of project reports and updates.

Last Answer : c. An improvement resulting from project deliverables.

Description : Which one of the following best defines a benefit?  a. A positive result of stakeholder management.  b. The successful management of a project.  c. An improvement resulting from project deliverables. d. The successful delivery of project reports and updates.

Last Answer : c. An improvement resulting from project deliverables.

Description :  Which of the following is the most important element of Project Management Plan that is useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : Choose the correct option according to given below  statement. Statement 1: Umbrella activities are independent of any one framework activity and occur throughout the process. Statement 2: quality assurance, ... . c. Only statement 3 is correct. d. Statement 1 and statement 3 are correct

Last Answer : b. Statement 1 and statement 2 are correct.

Description : Which of the following is the most important element of Project Management Plan that is  useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : Which stage of project management life cycle requires the maximum time of  completion  A.Conceptualization  B.Planning  C.Execution  D.Estimation

Last Answer : C.Execution