Each had to carry out repair work with their own hands. Probably no one avoided mistakes. Remember how you looked with bewilderment and resentment at the spoiled tiles that you so tenderly chose in the store and carefully laid. But it turned out that you overlooked the fact that everything must be done sequentially. Violation of the priority in carrying out repair work does not necessarily lead to such depressing consequences, but it happens that you have to redo the work, and this causes irritation, loss of energy, money and time.
It is advisable to start the repair with the presentation of the final result, which means that it is necessary to draw up a detailed list of all the proposed changes and the work that will have to be done. You should start with the bathroom and toilet, as these areas usually require the implementation of "dirty" work using cement. Then the repair is transferred to the farthest room and successively moved to the kitchen. If at the time of work you cannot leave the apartment, then the loggia or balcony can temporarily become a utility room, where you will store tools, building materials and even perform some work.
Decide where you will have electrical outlets, switches, lamps, in which parts of the premises you plan to put a computer and other equipment. Consider the location of spare outlets for charging your phone or for portable equipment, such as a vacuum cleaner.
The wiring in the kitchen requires special attention. Dishwashers, food processors and other household helpers are still plugged into sockets, most often those that are made according to European standards (with three wires). Correlate the power of the devices with the load of the mains. It is better to leave this part of the work to specialists, although you can continue to believe that you would have done just as well.
Having finished with an electrician, start installing (replacing) heating radiators. The order of these elements of repair can be changed in places, in more detail at
http://vipmasterok.ru/ .
The next activity is leveling concrete walls and floors. Be especially picky about corners: poorly executed wall-to-floor joints will create gaps and result in skirting problems. Repair of walls involves the detection and elimination of all voids in them for the purpose of sound and thermal insulation. When you achieve perfectly flat walls, proceed with installing and connecting outlets.
Now it was the turn of windows and doors. The parameters of window and door openings can be correctly calculated only after completing the alignment of the walls and floor, but not earlier, since the height, depth and width of the openings before alignment may be different. Having determined the dimensions of windows and doors, you can safely order the options you like, now they will definitely fall into place.
The time has come for the aesthetic design of the prepared surfaces. Putty and paint the ceiling, lay the floor. It is more convenient and safer to glue wallpaper if the sockets and switches are turned off and removed. So you do not have to align the wallpaper around the outlets, being annoyed that everything does not turn out very neatly. It is easier and more enjoyable to glue a sheet of wallpaper on a smooth wall, and then cut precise holes in them to fit the outlet. Of course, it's best to double-check that they are still offline. The renovation has come to an end. Now you can arrange furniture, invite guests and enjoy the design of the room.