X persons can complete a work in Y days. Then, 3X persons can complete the same work in ……….. Days and `(x)/(3)` persons can complete the same work in

1 Answer

Answer :

X persons can complete a work in Y days. Then, 3X persons can complete the same work in .. Days ... can complete the same work in .. Days.

Related questions

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are required to complete double the work in 25 days, wo

Last Answer : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are ... work in 25 days, working 6 hours per day ?

Description : 90 persons can complete a job in 32 days. 12 days after they started working, 60 more persons joined them. How many days will they now take to complete the remaining work? a) 10 days b) 12 days c) 14 days d) 16 days

Last Answer : B (90 * 32) persons can complete the work in 1 day. 1 person 1 day's work = 1/(90 *32) i.e., 1/2880 90 person's 12 day's work = 1/32 * 12 = 3/8 Remaining work =(1- 3/8) = 5/8 150 persons 1 ... 5/96 work is done by them in 1 day . Therefore 5/8 work is done by them, = (96/5*5/8) =12 days.

Description : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Last Answer : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Description : Complete set of solution of inequation `sqrt(3x^2+5x+7)-sqrt(3x^2+5x+2)gt1` is `(-a,-b)uu(-c,-d)` then find the value of a+b+c+d

Last Answer : Complete set of solution of inequation `sqrt(3x^2+5x+7)-sqrt(3x^2+5x+2)gt1` is `(-a,-b)uu(-c,-d)` then find the ... +c+d A. `4` B. `3` C. `2` D. `1`

Description : The point (2,3) lies on the graph of the linear equation 3x - (a -1)y =2a -1. If the same point also lies on the graph of the linear equation 5x + (1-2a)y = 3b, then find the value of b. -Maths 9th

Last Answer : Given, point (2,3) lies on the line. So, the point (2, 3) is the solution of 3x - (a -1) y = 2a - 1 On putting x = 2 and y = 3 in given solution. ∴ 3 2 - (a-1) 3 = 2a - 1 ⇒ 6 - 3a + 3 = 2a - 1 ⇒ - 3a ... 2 2) 3 = 3b ⇒ 10 - 9 = 3b ⇒ 1 = 3b ⇒ 1 / 3 = b Hence, the value of b is 1 / 3.

Description : The point (2,3) lies on the graph of the linear equation 3x - (a -1)y =2a -1. If the same point also lies on the graph of the linear equation 5x + (1-2a)y = 3b, then find the value of b. -Maths 9th

Last Answer : Given, point (2,3) lies on the line. So, the point (2, 3) is the solution of 3x - (a -1) y = 2a - 1 On putting x = 2 and y = 3 in given solution. ∴ 3 2 - (a-1) 3 = 2a - 1 ⇒ 6 - 3a + 3 = 2a - 1 ⇒ - 3a ... 2 2) 3 = 3b ⇒ 10 - 9 = 3b ⇒ 1 = 3b ⇒ 1 / 3 = b Hence, the value of b is 1 / 3.

Description : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Last Answer : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Description : what- shaneese is buying peanuts and cashews. she has $12 to spend. peanuts cost $3 per pound and cashews cost $4 per pound. if she buys x pounds of peanuts and y pounds of cashews, then the equation that represents the amount of each is 3x + 4y =12?

Last Answer : what is the x- intercept

Description : what- Shaneese is buying peanuts and cashews. She has $12 to spend. Peanuts cost $3 per pound and cashews cost $4 per pound. If she buys x pounds of peanuts and y pounds of cashews, then the equation that represents the amount of each is 3x + 4y = 12.?

Last Answer : What is the x-intercept?

Description : If the function `y = ae^(x) + bx^(2)+3x` is maximum at x = 0 and minimum at x = - 3, then find the values of a and b.

Last Answer : If the function `y = ae^(x) + bx^(2)+3x` is maximum at x = 0 and minimum at x = - 3, then find the values of a and b.

Description : If `(5x+7y):(3x+11y)=2:3`, then find x:y.

Last Answer : If `(5x+7y):(3x+11y)=2:3`, then find x:y.

Description : if x:y=5:7 then find `(3x+4y):(x+2y)` .

Last Answer : if x:y=5:7 then find `(3x+4y):(x+2y)` .

Description : If a + b = 1 ,and the ordered pair (a, b) satisfies the equation 2x + y = , then it also satisfies (a) 2x + y (b) 3x + 4y = 3 (c) x + 2y = (d) 2x + 4y =

Last Answer : (c) x + 2y =

Description : If (x, y) is a solution of the following pair of linear equations in two variables, then the value of expression (√ is: x + 2y = 4 and 3x - y = 5 (a) 2 (b) 3 (c) 4 (d) √2

Last Answer : (a) 2

Description : If a function is described by F = (3x + z, y 2 − sin x 2 z, xz + ye x5 ), then the divergence theorem value in the region 0

Last Answer : c) 39

Description : Draw a graph of the equation x + Y = 5 & 3x - 2y =0 on the same graph paper. Find the coordinates of the point whose two lines intersect. -Maths 9th

Last Answer : This answer was deleted by our moderators...

Description : Draw a graph of the equation x+ y=5 & 3x -2y=0 in the same graph paper find the coordinates of the point whose two two lines intersect. -Maths 9th

Last Answer : From x + y = 5, If x = 0 0 + y = 5 y = 5 Therefore (0,5) If x = 1 1 + y = 5 y =5 - 1 y = 4 Therefore (1,4) Draw a graph for this And From 3x - 2y = 0 If x = 0 3 (0) - 2y = 0 0 - ... 2y = 0 -2y = -6 y = -6/-2 y = 3 Therefore (2,3) Draw a graph for these points And the point of intersection is (2,3)

Description : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Last Answer : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Description : A can complete a piece of work working along with B in 20 days. If he can complete the same work working along with C in 10 days, then between B and C

Last Answer : A can complete a piece of work working along with B in 20 days. If he can complete the same work ... , then between B and C who is more efficient ?

Description : If the expressions (px^3 + 3x^2 – 3) and (2x^3 – 5x + p) when divided by (x – 4) leave the same remainder, then what is the value of p ? -Maths 9th

Last Answer : Given that the following polynomials leave the same remainder when divided by (x - 4) : We are to find the value of a. Remainder theorem: When (x - b) divides a polynomial p(x), then the remainder is p(b). So, from (i) and (ii), we get Thus, the required value of a is 1.

Description : The ratio of salary of two persons X and Y is 5:8. If the salary of X increases by 60% and that of Y decreases by 35% then the new ratio of their salaries become 40:27. What is X's salary? a) Rs.15000 b) Rs.12000 c) Rs.19500 d) Data inadequate. e) NONE

Last Answer : Answer : D Ratio of salary of X and Y is 5:8 Let the original salary of X and Y be Rs.5k and Rs.8k respectively. After increasing 60%, new salary of X = 160% of 5k = 160x5k/100 = 80k/ ... does not give the value of k; so that we cannot find X's exact salary. Hence the answer is data inadequate.

Description : Draw the graph of the linear equation 3x + 4y = 6. At what points, does the graph cut the x-axis and the y-axis? -Maths 9th

Last Answer : hope it helps

Description : Draw the graph of the following equations (1) Y =3x+2 (b) Y=x -Maths 9th

Last Answer : This answer was deleted by our moderators...

Description : What is the angle between the lines whose equations are: 3x + y – 7 = 0 and x + 2y + 9 = 0. -Maths 9th

Last Answer : (c) (8, 6)Let AB be the given line 4x + 3y = 25 Let O′(a, b) be the image of O in the given line AB. Let O O′ cut AB in point P. Also OP ⊥ AB and P is the mid-point of OO′. ∴ Co-ordinates of P are \(\bigg( ... 4 imes6}{3}\) = 8∴ The image of the point O(0, 0) in the line 4x + 3y - 25 = 0 is (8, 6).

Description : 30. Radical centre of circles drawn on the sides as a diameter of triangle formed by the lines the `3x-4y+6=0`, `x-y+2=0` and `4x+3y-17=0` is

Last Answer : 30. Radical centre of circles drawn on the sides as a diameter of triangle formed by the lines the `3x-4y+6=0`, `x-y+ ... . (-2,3) C. (-2,-3) D. (2,3)

Description : Let x,y,z be real numbers such that 3x, 4y and 5z from a geometric progression while x,y,z form an H.P. If the value of `((x)/(z) +(z)/(x))` can be ex

Last Answer : Let x,y,z be real numbers such that 3x, 4y and 5z from a geometric progression while x,y,z form an H.P. If ... value equal to A. 29 B. 39 C. 49 D. 59

Description : Find the coordinates of the points on the curve `y=x^2+3x+4,` the tangents at which pass through the origin.

Last Answer : Find the coordinates of the points on the curve `y=x^2+3x+4,` the tangents at which pass through the origin.

Description : If ` x : y = 3:5`, find the duplicate ratio of `(3x+y) : (5x-y)`.

Last Answer : If ` x : y = 3:5`, find the duplicate ratio of `(3x+y) : (5x-y)`. A. ` 49 : 25` B. ` 25 : 9` C. ` 36 : 25` D. ` 49 : 36`

Description : What are the values of x y and k when the line y equals 3x plus 1 is a tangent to the circle x squared plus y squared equals k?

Last Answer : If y = 3x + 1 is a tangent to x² + y² = k (k > 0 since it isa square), then where they meet has a repeated root; they meetat:x² + (3x + 1)² = k→ x² + 9x² + 6x + 1 - k = 0→ 10x² + 6x + (1 - k) = 0This is the ... 3/10→ y = 3 -3/10 + 1 = 9/10 + 1 = 1/10→ point of contact is (-3/10, 1/10) with k = 1/10

Description : What is the x value such that y 15 - 3x and y 0?

Last Answer : What is the answer ?

Description : The coordinates of the vertices of region bounded by lines 3x - y = 5; x+ 2y = 4 and Y-axis are: (a) A(2,0); B(5,0) and C(1,2) (b) A(2,0); B(-5,0) and C(1,2) (c) A(0,2); B(0,-5) and C(2,1) (d) A(0,2); B(0,5) and C(2,1)

Last Answer : (c) A(0,2); B(0,-5) and C(2,1)

Description : A pair of linear equations which has a unique solution x = 2, y = -3 is (a) x + y = -1 ; 2x – 3y = -5 (b) 2x + 5y = -11 ; 4x + 10y = -22(c) 2x – y = 1 ; 3x + 2y = 0 (d) x – 4y – 14 = 0 ;5x – y – 13 = 0

Last Answer : (d) x – 4y – 14 = 0 ;5x – y – 13 = 0

Description : Evaluate the surface integral ∫∫ (3x i + 2y j). dS, where S is the sphere given by x 2 + y 2 + z 2 = 9. a) 120π b) 180π c) 240π d) 300π

Last Answer : b) 180π

Description : If x:y =3:4,in the ratio of (7x-4y) : ( 3x + y) a) 2:11 b) 4:9 c) 5:13 d) 6:5 e) 13:5

Last Answer : An easy way to solve this question is use x = 3, y=4 7x – 4y = 21 – 16 = 5 3x + y = 9+4 = 13 Required ratio = 5:13 Answer: c)

Description : I. 3x^2 – 47x + 184 = 0 II. 3y^2 – 38y + 119 = 0 1 : if x ≥ y 2 : if x ≤ y 3 : if x > y 4 : if x < y 5 : if x = y or relationship cannot be established

Last Answer : 3 : if x > y

Description : A task is done by 46 persons not all of them have the same capacity to task. Every day exactly 2 persons, do the task with no pair of persons working together twice. Even after all possible pairs have worked ... in which all the persons together will finish the whole task? a) 44 b) 45 c) 46 d) 47

Last Answer : D 46 persons task in pairs, with no same pair of persons working together. Each person will be working with other 45 which means each persons will work for 45 days in pair. Let the time taken by each ... +1/T46)= 1/47 If all the persons work together they will finish the whole task in 47 days.

Description : If Ramesh can complete 2/5th of a work in 24 days and Satish can complete 1/3rd of the work in 30 days, then in how many days can they complete the wo

Last Answer : If Ramesh can complete 2/5th of a work in 24 days and Satish can complete 1/3rd of the work ... days can they complete the work if they work together?

Description : A and B together can complete a work in 24 days. A alone can complete it in 40 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work? a) 24 days b) 15 days c) 21 days d) 19 days

Last Answer : A B’s 1 day’s work = (1/24 -1/40) =(5-3)/120 =2/120=>1/60 Now, (A + B)’s 1 day’s work = (1/40 +1/60) =(3+2)/120 =5/120 So, A and B together will complete the work in 120/5 = 24 days.

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : A officer undertakes to complete a job in 250 days. He employs 300 male for 50 days and they complete 1/2 of the work . He then reduces the number of male to 100, who work for 120 days, after which there ... male must be employed for the remaining period to finish the work? a) 25 b) 50 c) 45 d) 35

Last Answer : B 300 male in 50 days do = 1/2work 1 male in 1 day does = ½*1/50*1/300 work 100 male in 120 days do = ½ *1/50*1/300 *100*120 =2/5 work Total work done = ½ + 2/5 =(5+4)/10=9/10 ... is done in 50 days by 300 male 1/10 work is done in 60 days by =300*50*1*2/10*60 =50 male

Description : If two persons with AB' blood group marry and have sufficiently large number of children, these children could be classified as A' blood group: AB' blood group : B' blood group in 1 ... in an example of (a) partial dominance (b) complete dominance (c) codominance (d) incomplete dominance.

Last Answer : (c) codominance

Description : I think my friend is addicted to Xanax but she swears she is not because she isn't even taking her doc's recommended dosage, which is 3x per day. But sometimes she gets way stressed over her boyfriend and just ... ) and if so, how can I tell if she is addicted? We live across the US from each other.

Last Answer : Xanax is like that if she is taking it with another prscribed drug like zoloft then she may not need the Xanax until she's stressed. My husband takes both he doesn't need the Xanax until something triggers ... she's addicted. Some dr. Say to only take it when it is extreamly needed. Hope that helps.

Description : 6 men and 8 women can complete a work in 10 days. 26 men and 48 women can finish the same work in 2 days. 15 men and 20 women can do the same work in - days. a) 4 days b) 6 days c) 2 days d) 8 days e) 7 days

Last Answer : Let work done by 1 man in 1 day = m and work done by 1 woman in 1 day = b Work done by 6 men and 8 women in 1 day = 1/10 => 6m + 8b = 1/10 => 60m + 80b = 1 --- (1) Work done by 26 men and 48 ... 1 day = 15/100 + 20/200 =1/4 => Time taken by 15 men and 20 women in doing the work = 4 days Answer: a)

Description : 20 workers working 5hours a day can finish the work in 20 days.If the workers went to work for 4hours a day.How many more workers are required to complete the work in same 20days? 1)7 2)4 3)5 4)6

Last Answer : 3)5 Exp: workers required for 4h=>(5/4)×20=25. 25-20=5.

Description : Rakchita can do a piece of work in 28 days, while Shreya can do the same work in 42 days.They started the work together but 6 days before the completion of the work, Rakchita left the work. The total number of days to complete the work is a) 3 b) 4 c) 5 d) 6 

Last Answer : D 6 days before the completion of the work Rakchita left the work means in last 6 days only Shreya has worked alone So, in last 6 days worked done by Shreya = 6*1/42=6/42=1/7 So, the rest = 1-1/7 =6/7 So 6/7work was done by Rakchita and Shreya worked together=6/7*70/10 =420/70=6 days

Description : 8 male can finish a work in 6 days.12 female can complete the same work in 9 days. 6 male and 4 female started working and after 4 days 3 more female joined them. How many days will they now take to complete the remaining work? a) 76/41 days b) 25/62days c) 3/31days d) 4/77days

Last Answer : A 1 male's 1 day work = 1/48 1 female's 1 day work = 1/108 Work done in 4 days = 4 (6/48 +4/108) =4(1/8+1/27) =1/2+4/27 =(27+8)/54 =35/54 Remaining work = (1 - 35/54) = 19/ ... (27+14)/216 =41/216 Now 41/216 work is done by them in 1 day Therefore time taken = 216/41 * 19/54 = 76/41 days

Description : Arul can do a certain work in 9 days while Ravi can do the same work in 7 days. Both of them complete the work together and get Rs.288. what is the share of Arul? a) Rs.124 b) RS.126 c) Rs.128 d) Rs.130

Last Answer : B Arul’s 1 day work = 1/9 Ravi’s 1 day work = 1/7 Arul’s salary : Ravi’s salary = Arul’s 1 day work : Ravi’s 1 day work = 1/9 : 1/7 = 7 :9 Arul’s share = Rs.(7/16 *288) =Rs.126

Description : Rishwi can finish a work in 6 days working 4 hours a day. Dhiviksha can complete the same work in 4 days working 5 hrs a day. If both rishwi and dhiviksha work together, working 4 hrs a day, in how many days can they finished the work? a) 30/11 b) 11/120 c) 11/30 d) 30/13

Last Answer : A Rishwi can complete the work in (6*4) = 24 hrs Dhiviksha can complete the work in (4*5) = 20 hrs Rishwi's 1 hr work = 1/24 Dhiviksh's 1 hr work = 1/20(Rishwi and dhivikasha)'s 1 hr work = (1/24 ... fininsh the work in (120/11)hrs Number of days of 4 hrs each = 120/11*1/4 =120/44 =30/11 days

Description : Persons below the poverty line in India are classified as such based on whether (a) They are entitled to a minimum prescribed food basket (b) They get work for a prescribed minimum number of ... the scheduled caste /tribe social group (d) Their daily wages fall below the prescribed minimum wages

Last Answer : Ans: ( a ) They are entitled to a minimum prescribed food basket