X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

1 Answer

Answer :

X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Related questions

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Last Answer : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Description : A can complete a piece of work working along with B in 20 days. If he can complete the same work working along with C in 10 days, then between B and C

Last Answer : A can complete a piece of work working along with B in 20 days. If he can complete the same work ... , then between B and C who is more efficient ?

Description : Ram, Suresh and Shilpa, working together, can do a piece of work in 1 day. Ram is thrice as efficient as Suresh, and Suresh takes twice the number of days as Shilpa takes to do it alone. What is the difference between ... and Shilpa, each working alone, to complete the work? a) 1 b) 2 c) 3 d) 4 e) 5

Last Answer : Let the time taken by Ram, Suresh and Shilpa to finish the work alone be A, B and C respectively Therefore, 1/A + 1/B + 1/C = 1 Also it is given that, A = B/3 and C =B/2 3/B + 1/B + ... between the number of days taken by Ram and Shilpa, each working alone, to complete the work = 3-2 = 1 Answer: a)

Description : Karthik is 2 times as good workman as Raghu and together they complete a piece of work in 42 days. The number of days taken by Karthik alone to finish the work is. a) 55 days b) 60 days c) 63 days d) 67 days

Last Answer : C Karthik’s 1 day work : Raghu’s 1 day work = 2:1 (Karthik + Raghu)’s 1 day work = 1/42 Divide 1/42 in the ratio 2:1 Therefore karthick’s 1 day work = 1/42 * 2/3 =1/63 Hence karthik alone can finish the work in 63 days.

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where as X and Z can do it in 20 days. Who is the most effci

Last Answer : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where ... Z can do it in 20 days. Who is the most effcient?

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : X does half as much work as Yand Z does half as much work as X and Y together. If Z alone can finish the work in 120 days, then together ,all will finish the work in ? a) 14 1/2 b) 40 c) 24 1/2 d)17 1/3

Last Answer : B Z alone can finish the work in 120 days. As given Z does half as much work as X and Y together => (X + Y) can do it in 60 days (X+ Y)s 1 days wok = 1/60. X's 1 days work : Y's 1 days Work = 1 ... (1/90) + (1/120) =(2+4+3)/360 =9/360 = 1/40 All the three together will finish it in 40 days

Description : Twenty workers can complete a piece of work in 30 days. After how many days should 5 workers leave the job so that the work is completed in 35 days? a) 5 days b) 10 days c) 15 days d) 20 days

Last Answer : c) 15 days

Description : A is twice as fast as B and together they can complete a work in 20 days. In how many days can A alone complete the work?

Last Answer : A is twice as fast as B and together they can complete a work in 20 days. In how many days can A alone complete the work?

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : Praneetha and Pooja together can do a piece of work in 24 days ,which pooja and priya can do in 32 days. After praneetha has been working at it for 10 days and pooja for 14 days, Priya finishes it in 26 days. In how many days Priya alone will do the work? a) 12 days b) 24 days. c) 48 days d) 50 days

Last Answer : C Praneetha's 10 day's work + Pooja 14 day's work + Priya's 26 days work = 1 (Praneetha's +pooja's) 10 day's work + (pooja + priya)'s 4 day's work +priya's 22 days work = 1 =>10/24 + 4/32 + priya' ... 13/24 =11/24 Priya's 1 day's work = 11/24 * 1/22 =1/48 Priya can finish the work in 48 days.

Description :  Arfath is thrice as good workman as deekshith and together they finish a piece of work in 27 days. In how many days will arfath alone finish the work? a) 9 days b) 10 days c) 11 days d)12 days

Last Answer : A Arfath’s 1 days work = 3 Deekshith 1 day’s work = 1 Arfath 1 day’s work : Deekshith 1 days work = 3:1 (Arfath + deekshith )’s 1 day’s work = 1/27 Divide 1/27 in the ratio 3:1 Arfath’s 1 days work = 1/27 *3/1 = 3/27 =1/9 Hence Arfath’s alone can finish the work in 9 days

Description : A and B together can complete a work in 24 days. A alone can complete it in 40 days. If B does the work only for half a day daily, then in how many days A and B together will complete the work? a) 24 days b) 15 days c) 21 days d) 19 days

Last Answer : A B’s 1 day’s work = (1/24 -1/40) =(5-3)/120 =2/120=>1/60 Now, (A + B)’s 1 day’s work = (1/40 +1/60) =(3+2)/120 =5/120 So, A and B together will complete the work in 120/5 = 24 days.

Description : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Last Answer : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Description :  6 male , 8 female and 12 children can complete a work in 14 days .a female does twice the work of a male does and a child does half the work a male does . how many female alone can complete this work in 14 days? a) 15 b) 10 c) 12 d) 14

Last Answer :  D Let 1 female ‘s 1 day work= x Then 1 male’s 1 day work =x/2 And 1 child’s 1 day work =x/4 So 6x/2 + 8x +12x/4 =1/14 3x+8x+3x = 1/14 14x = 1/14 X=196 1 female alone can complete the work in 196 days So, to complete the work in 14 days number of female required = 14.

Description : Sai and Ram working together completed a job in 10 days. If sai worked twice as efficiently as he actually did and ram worked 2/3 as efficiently as he actually did, the work would have been completed in 6 days. Sai alone could complete the work in. a) 40/3 days b) 42/4 days c) 44/6 days d) 43/3 days

Last Answer : A Let sai's 1 day work = x Ram's 1 day work = y Then x+y = 1/10 ===>1 and 2x +2y /3 = 1/6 (6x+2y )/3 = 1/6 6x + 2y =1/2 ====>2 Multiply 1 by 6 =>6x+6y = 6/10 2 = ... /10 - 1/40 = 4-1/10 =3/40 Sai's 1 day work = 3/40 So sai alone could complete the work in 40/3 days.

Description : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are required to complete double the work in 25 days, wo

Last Answer : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are ... work in 25 days, working 6 hours per day ?

Description : A task was assigned to P, Q and R to be completed by not more than seven days. P alone can complete the task in ten days. Q alone can complete the task in twelve days and R alone can complete the task in fifteen days. ... will remain after four days? a) 3/10 b) 1/15 c) 1/9 d) 5/16 e) None of these

Last Answer : 1day's work of (P + Q+ R) = 1/10 + 1/12 +1/15 = 15/60 2 day's work of (P + Q+ R) = 15/60 × 2 = 1/2 1 day's work of (P+Q) = 1/10 +1/12 = 11/60 2 day's work of (P+Q) = 11/60 × 2 = 11/30 Rem. work of 4 days = 1- 1/2 + 11/30 = 2/15 Answer: e)

Description : X persons can complete a work in Y days. Then, 3X persons can complete the same work in ……….. Days and `(x)/(3)` persons can complete the same work in

Last Answer : X persons can complete a work in Y days. Then, 3X persons can complete the same work in .. Days ... can complete the same work in .. Days.

Description : Twenty two men cann complete a piece of work in 17 days. They work for 2 days. How many more men should now be employed so as to complete the work in

Last Answer : Twenty two men cann complete a piece of work in 17 days. They work for 2 days. How many more men should now be ... A. 11 B. 22 C. 33 D. none of these

Description : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the thre of them can complete the work in 24 days. In how man

Last Answer : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the ... days. In how many days can C alone complete it ?

Description : A boy and his mother together can do a piece of work in 24 days while the day, working with his father, can complete it in 18 days. If the mother and

Last Answer : A boy and his mother together can do a piece of work in 24 days while the day, working with ... take to complete the job, if they work individually.

Description : A is thrice as fast as B. If B can do a piece of work in 60 days, the number of days they take to complete the work is ……..

Last Answer : A is thrice as fast as B. If B can do a piece of work in 60 days, the number of days they take to complete the work is ……..

Description : 8 men and 4 women-together can complete a piece of work in 6 days. Work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days, 4 men ... more days will the work be completed? a) 7 days b) 6 days c) 5 days d) 8 days e) 4 days 

Last Answer : 1 man = 2 women 8 men + 4 women = 20 women 2 day's work of 20 women = 20 × 6/1 = 20 × 2/x x =1/3 Remaining work = 1 – 1/3 = 2/3 Total number of females = 16 20 × 6/1 = 16 × x ÷2/ 3 x = 5 days Short Cut M1D1=M2D2+M3D3 10x6 =10x2 + 8 x 60-20= 8x x= 5 days Answer: c)

Description : Rakchita can do a piece of work in 28 days, while Shreya can do the same work in 42 days.They started the work together but 6 days before the completion of the work, Rakchita left the work. The total number of days to complete the work is a) 3 b) 4 c) 5 d) 6 

Last Answer : D 6 days before the completion of the work Rakchita left the work means in last 6 days only Shreya has worked alone So, in last 6 days worked done by Shreya = 6*1/42=6/42=1/7 So, the rest = 1-1/7 =6/7 So 6/7work was done by Rakchita and Shreya worked together=6/7*70/10 =420/70=6 days

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : M & N do a certain work in 40 days and 24 days respectively. M started the work alone and then after 8 days N joined him till the completion of the work. How long did the work last? a) 16days b) 18days c) 20 days d) 22 days

Last Answer : C Work done by M in 8 days = 1/40*8 =1/5 Remaining work = 1-1/5 = 4/5 (M+N)’s 1 day work = 1/40 + 1/24 =(3+5)/120 =8/120 =1/15 Now 1/15 work is done by M & N in 1 day. So 4/5 work will be done by X and Y is, =15 / 1 * 4/5 =12 days Hence total time taken = 12+8 = 20 days

Description :  P and Q undertake to do a piece of job for Rs.1200. P alone can do it in 12 days while Q alone can do it in 16 days. With the help of R , they finish it in 6 days. Find the share of P,Q & R. a) 400,600,200 b) 200,400,600 c) 450,400,250 d) 600,450,150

Last Answer : D R;s 1 day work = 1/6 – (1/12 + 1/16) =1/6 – 1/12 – 1/16 = (8-4-3)/48 = 1/48 P:Q:R = ratio of 1 day work = 1/12:1/16 : 1/48 =4:3:1 P’s share = Rs(1200*4/8) =Rs.600 Q’s share = Rs(1200 * 3/8) =Rs.450 R’s share = Rs(1200 * 1/8) =Rs.150

Description : The half-life of an isotope of an element is 5 days. The mass of a 10 gram sample of this isotope remaining after 20 days is: w) 0.312 grams x) 0.625 grams y) 1.25 grams z) 2.50 grams

Last Answer : ANSWER: X -- 0.625 GRAMS

Description : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start the work together and work for some time, then B leaves. If A com

Last Answer : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start ... then find the number of days for which they worked together.

Description : P, Q and R can do a piece of work in 18,24 and 36 days on the second day and P on the third day, again R on the fourth day and so on. Then in how, many days will the work be completed? 1. 25 2. 24 3. 22 4. 20 5. 26

Last Answer : 2;

Description : Prabu and balaji are two workers. Working together they can complete the whole work in 20 hours. If the Prabu worked for 5 hours and balaji worked for 17 hours, still there was half of the work to be done ... working alone, can complete the whole work? a) 17 hours b) 23 hours c) 34 hours d) 37 hours

Last Answer : C Efficiency of Prabu and balaji = 5% Prabu worked for 5 hours and balaji worked separately 17 hours. Which means it can be considered that Prabu and balaji worked together for 5 hours and balaji worked alone for ... (5-2.08) = 2.92% Thus, prabu require . = 34 hours to complete the work alone.

Description : 8 men and 8 boys can finish a piece of work in 10 days. 9 women and 7 boys can finish the same work in 10 days. Also 7 men and 6 women can finish the same work in 10 days. In how many days 1man, ... boy can finish the work, at their double efficiency? a) 25 days b) 20 days c) 15 days d) 10 days

Last Answer : A Efficiency of 8 men and 8 boys = 10% Efficiency of 9 women and 7boys = 10% Efficiency of 7 men and 6 women = 10% So, Efficiency of 15 men, 15women and 15boys = 30% So, efficiency of 1 man ... efficiency Efficiency of 1 man, 1 woman and 1 boy = 4% Required number of days = 100/4=25 days

Description : P and Q together can complete a job in 30 days. Q and R together can complete the same job in 40 days. P and R together can complete the same job in 40 days. What is the respective ratio of the number of days taken by P ... R when completing the same job alone? a) A.2:5 b) B.1:2 c) C.3:4 d) D.2:3

Last Answer : B Efficiency of P and Q= 1/30 per day ___________1 ⇒ Efficiency of Q and R = 1/40 per day_________2 ⇒ Efficiency of R and P = 1/40 per day _________3 Taking equation 2 and 3 together ⇒ Q + R = ... 120 days he they work alone. ⇒ Ratio of number of days in which P and R can complete the job 1:2.

Description : X, Y, Z are engaged to do a certain piece of work for Rs.8200.Y and Z are to execute 15/26 of the work together. Amount to be paid to X is A) 4287 B) 3469 C) 6124 D) 2865

Last Answer : Answer: B)  Y and Z are execute 15/26 of week Balance =1-15/26  11/26 of work completed by X  X’s share of revenue  =11/26 *8200  =Rs 3469

Description : A officer undertakes to complete a job in 250 days. He employs 300 male for 50 days and they complete 1/2 of the work . He then reduces the number of male to 100, who work for 120 days, after which there ... male must be employed for the remaining period to finish the work? a) 25 b) 50 c) 45 d) 35

Last Answer : B 300 male in 50 days do = 1/2work 1 male in 1 day does = ½*1/50*1/300 work 100 male in 120 days do = ½ *1/50*1/300 *100*120 =2/5 work Total work done = ½ + 2/5 =(5+4)/10=9/10 ... is done in 50 days by 300 male 1/10 work is done in 60 days by =300*50*1*2/10*60 =50 male

Description : A man can do a piece of work in 10 days. With the help of a boy he can do the same piece of work in 8 days. If they get Rs. 11115 for the work then what will be the share of boys? a) Rs.2223 b) Rs.2784 c) Rs.3163 d) Rs.3312 e) None of these

Last Answer : In one day boys can do = (1/8) – (1/10) = (5-4)/10 = 1/40 part so, boys can finish the work in 40 days. Now, Men’s share : Boy’s share = 40 : 10 = 4 : 1 Boys share = (11115 / 5) × 1 = Rs. 2223 Answer is: a)

Description : 6 men and 8 women can complete a work in 10 days. 26 men and 48 women can finish the same work in 2 days. 15 men and 20 women can do the same work in - days. a) 4 days b) 6 days c) 2 days d) 8 days e) 7 days

Last Answer : Let work done by 1 man in 1 day = m and work done by 1 woman in 1 day = b Work done by 6 men and 8 women in 1 day = 1/10 => 6m + 8b = 1/10 => 60m + 80b = 1 --- (1) Work done by 26 men and 48 ... 1 day = 15/100 + 20/200 =1/4 => Time taken by 15 men and 20 women in doing the work = 4 days Answer: a)

Description : Which of the following reasons explains why quartz cannot be identified by its color alone? w) Its color is too faint. x) It has no color. y) It exists in a variety of colors. z) Its color fades.

Last Answer : ANSWER: Y -- IT EXISTS IN A VARIETY OF COLORS

Description : Ten coulombs of positive charge are placed on an irregularly-shaped, solid piece of copper. Once the charge has stopped moving, the electric field inside the copper is: w) zero x) changes as one ... squared y) becomes smaller as you approach the center z) becomes larger as you approach the center

Last Answer : ANSWER: W -- ZERO

Description : A COPPER strip is placed in one compartment of a voltaic cell and a wire connects this strip to a piece of metal in the other compartment through a voltmeter. If the voltmeter reads zero, the other piece of metal is: w) zinc x) mercury y) silver z) copper

Last Answer : ANSWER: Z -- COPPER

Description : A cobalt chloride solution soaked into a piece of cotton can be used as an indicator for changes in humidity levels. Pink indicates a high-humidity environment and blue a low-humidity environment. What ... the cobalt's waters of hydration. z) This is an illustration of the Schrodinger principle.  

Last Answer : ANSWER: Y -- THE LOSS AND READSORPTION OF THE COBALT'S WATERS OF HYDRATION.

Description : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Last Answer : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Description : A and B together can do a piece of work in 20 days, while B and C together can do the same work in 15 days. If A ,B and C together can finish this wor

Last Answer : A and B together can do a piece of work in 20 days, while B and C together can do the same ... number of days in which B alone can finish the work.

Description : 4 male and 6 female do a piece of work in 20 days while 6 male and 4 female can do the same work in16 days. In how many days can 4 male and 2 female do the work? a) 3 62/142 b) 2 18/124 c) 4 81/165 d) 1 67/133

Last Answer : D Let 1 male's 1 day's work = x 1 female's 1 day's work = y Then 4x + 6y = 1/20 ---------->A 80x + 120y = 1 -----------1 6x + 4y = 1/16 ----------B 96x + 64y = ... (1/400) =132/200+1/200 = 133/200 So 4 male and 2 female together can finish the work in 200/133 = 1 67 /133 days

Description : A worker lifts a 10 kilogram block a vertical height of 2 meters. The work he does on the block is: w) 5 Joules x) 20 Joules y) 49 Joules z) 200 Joules

Last Answer : ANSWER: Z -- 200 JOULES

Description : A can build up a wall in 8 days while B can break it in 3 days. A has worked for 4 days and then B joined to work with A for another 2 days only. In how many days will A alone build up the remaining part of the wall? a) 13/3 days b) 22/3 days c) 7/4 days d) 7 days e) None of these

Last Answer : Amount of work done by A in one day = 1/8th of the total work B can break 1/3rd of the work in one day Therefore, if both of them are working together then the work done in one day = 1/8 - 1/3 = -5/24 ... = 11/12 Time taken by A to finish 11/12th of the work = 11/12 8 = 22/3 days Answer: b)