20 workers working 5hours a day can finish the work in 20 days.If the workers went to work for 4hours a day.How many more workers are required to complete the work in same 20days? 1)7 2)4 3)5 4)6

1 Answer

Answer :

3)5

Exp: workers required for 4h=>(5/4)×20=25.

25-20=5.

Related questions

Description : 6 men and 8 women can complete a work in 10 days. 26 men and 48 women can finish the same work in 2 days. 15 men and 20 women can do the same work in - days. a) 4 days b) 6 days c) 2 days d) 8 days e) 7 days

Last Answer : Let work done by 1 man in 1 day = m and work done by 1 woman in 1 day = b Work done by 6 men and 8 women in 1 day = 1/10 => 6m + 8b = 1/10 => 60m + 80b = 1 --- (1) Work done by 26 men and 48 ... 1 day = 15/100 + 20/200 =1/4 => Time taken by 15 men and 20 women in doing the work = 4 days Answer: a)

Description : Two faucet can fill a tank in 12hours and 16 hours .While a third faucet empties the full tank in 24 hours.If all the three faucet are operate simultaneously, In how much time will the tank be filled ? A) 4 hours 12mins B) 4hours 48min C) 9hours 36mins D) 5hours 48min

Last Answer : C  1/12+1/16 – 1/24 = (4+3-2)/48  =>5/48  Time taken to fill the tank = 48/5 = 9hours 36min

Description : A and B working alone can finish a job in 5 days and 7 days respectively. They work at it alternately for a day. If A starts the work, find in how many days the job will be finished? a) 29/5 b) 11/5 c) 24/5 d) 21/5 e) None of these

Last Answer : Work done by A in one day = 1/5 and work done by B in one day = 1/7 They are working alternately. Therefore, Work done in first two day = (1/5 + 1/7) = 12/35 Work done in first four day = 24/35 Work done in ... = 4/35/1/7 = 4/5 of the day. Therefore Total days taken = 5 + 4/5 = 29/5 days Answer: b)

Description : 8 men and 4 women-together can complete a piece of work in 6 days. Work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days, 4 men ... more days will the work be completed? a) 7 days b) 6 days c) 5 days d) 8 days e) 4 days 

Last Answer : 1 man = 2 women 8 men + 4 women = 20 women 2 day's work of 20 women = 20 × 6/1 = 20 × 2/x x =1/3 Remaining work = 1 – 1/3 = 2/3 Total number of females = 16 20 × 6/1 = 16 × x ÷2/ 3 x = 5 days Short Cut M1D1=M2D2+M3D3 10x6 =10x2 + 8 x 60-20= 8x x= 5 days Answer: c)

Description : A boat takes 4hours for traveling downstream from point P to point Q and coming back to point P upstream. If the velocity of the stream is 2km ph and the speed of the boat in still water is 4kmph, what is the distance between P and Q? A.9 km B.7 km C.5 km D.6km

Last Answer : Answer- D Basic Formula: Speed of stream = ½ (a-b) km/hr Speed of still water = ½ (a+b) km/hr Explanation: Time taken by boat to travel upstream and downstream = 4 hours Velocity of the stream, ½ (a-b) = 2km/hr a ... + x / 6 = 4 3x + x / 6 = 4 4x = 24 so,x = 6 distance between P and Q = 6km

Description : Sham can row a boat at 10kmph in still water. IF the speed of the stream is 6kmph, the time taken to row a distance of 80km down the stream is A.4 hours B.5hours C.3 hours D.2 hours

Last Answer : Answer- B Basic Formula: Speed of stream = ½ (a-b) km/hr Speed in still water = ½ (a+b) km/hr Explanation: Given: Speed in still water, ½ (a+b) = 10 km/hr a+b = 20 km/hr .(1) ... ) we get 2a = 32 a = 16 km/hr speed downstream =distance traveled / time taken time taken = 80/16 = 5 hours

Description : Ram, Suresh and Shilpa, working together, can do a piece of work in 1 day. Ram is thrice as efficient as Suresh, and Suresh takes twice the number of days as Shilpa takes to do it alone. What is the difference between ... and Shilpa, each working alone, to complete the work? a) 1 b) 2 c) 3 d) 4 e) 5

Last Answer : Let the time taken by Ram, Suresh and Shilpa to finish the work alone be A, B and C respectively Therefore, 1/A + 1/B + 1/C = 1 Also it is given that, A = B/3 and C =B/2 3/B + 1/B + ... between the number of days taken by Ram and Shilpa, each working alone, to complete the work = 3-2 = 1 Answer: a)

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : Rishwi can finish a work in 6 days working 4 hours a day. Dhiviksha can complete the same work in 4 days working 5 hrs a day. If both rishwi and dhiviksha work together, working 4 hrs a day, in how many days can they finished the work? a) 30/11 b) 11/120 c) 11/30 d) 30/13

Last Answer : A Rishwi can complete the work in (6*4) = 24 hrs Dhiviksha can complete the work in (4*5) = 20 hrs Rishwi's 1 hr work = 1/24 Dhiviksh's 1 hr work = 1/20(Rishwi and dhivikasha)'s 1 hr work = (1/24 ... fininsh the work in (120/11)hrs Number of days of 4 hrs each = 120/11*1/4 =120/44 =30/11 days

Description : 8 male can finish a work in 6 days.12 female can complete the same work in 9 days. 6 male and 4 female started working and after 4 days 3 more female joined them. How many days will they now take to complete the remaining work? a) 76/41 days b) 25/62days c) 3/31days d) 4/77days

Last Answer : A 1 male's 1 day work = 1/48 1 female's 1 day work = 1/108 Work done in 4 days = 4 (6/48 +4/108) =4(1/8+1/27) =1/2+4/27 =(27+8)/54 =35/54 Remaining work = (1 - 35/54) = 19/ ... (27+14)/216 =41/216 Now 41/216 work is done by them in 1 day Therefore time taken = 216/41 * 19/54 = 76/41 days

Description : A contract is to be completed in 46 days and 117 men were set to work, each working 8 hours a day. After 33 days, 4/7 of the work completed. How many additional men may be employed so that the work may be completed in time, each man now working 9 hours a day? a) 79 b) 80 c) 81 d) 82 e) 83

Last Answer : work finished by 33 days = 33 117 8 = 30888 man hours 4/7th of the job is finished. remaining work = 1-(4/7) = 3/7 if 4/7th of the work is 30888 hours, then 3/7th of the work = [30888 ... 9 number of men = 198 since, 117 men are already working, additional men required = 198 - 117 = 81 Answer: c)

Description : P, Q and R can do a piece of work in 18,24 and 36 days on the second day and P on the third day, again R on the fourth day and so on. Then in how, many days will the work be completed? 1. 25 2. 24 3. 22 4. 20 5. 26

Last Answer : 2;

Description : A task was assigned to P, Q and R to be completed by not more than seven days. P alone can complete the task in ten days. Q alone can complete the task in twelve days and R alone can complete the task in fifteen days. ... will remain after four days? a) 3/10 b) 1/15 c) 1/9 d) 5/16 e) None of these

Last Answer : 1day's work of (P + Q+ R) = 1/10 + 1/12 +1/15 = 15/60 2 day's work of (P + Q+ R) = 15/60 × 2 = 1/2 1 day's work of (P+Q) = 1/10 +1/12 = 11/60 2 day's work of (P+Q) = 11/60 × 2 = 11/30 Rem. work of 4 days = 1- 1/2 + 11/30 = 2/15 Answer: e)

Description : 8 men and 8 boys can finish a piece of work in 10 days. 9 women and 7 boys can finish the same work in 10 days. Also 7 men and 6 women can finish the same work in 10 days. In how many days 1man, ... boy can finish the work, at their double efficiency? a) 25 days b) 20 days c) 15 days d) 10 days

Last Answer : A Efficiency of 8 men and 8 boys = 10% Efficiency of 9 women and 7boys = 10% Efficiency of 7 men and 6 women = 10% So, Efficiency of 15 men, 15women and 15boys = 30% So, efficiency of 1 man ... efficiency Efficiency of 1 man, 1 woman and 1 boy = 4% Required number of days = 100/4=25 days

Description : A officer undertakes to complete a job in 250 days. He employs 300 male for 50 days and they complete 1/2 of the work . He then reduces the number of male to 100, who work for 120 days, after which there ... male must be employed for the remaining period to finish the work? a) 25 b) 50 c) 45 d) 35

Last Answer : B 300 male in 50 days do = 1/2work 1 male in 1 day does = ½*1/50*1/300 work 100 male in 120 days do = ½ *1/50*1/300 *100*120 =2/5 work Total work done = ½ + 2/5 =(5+4)/10=9/10 ... is done in 50 days by 300 male 1/10 work is done in 60 days by =300*50*1*2/10*60 =50 male

Description : Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men work to complete the job? (a) 8 hrs (b) 7 1/2 hrs (c) 7 hrs (d) 9 hrs

Last Answer : (b) 7 1/2 hrs

Description : Kathir and Anand can do a work in 20 days and 30 days respectively. Kathir started the work and left after 4 days. Anand took over and completed the work. In how many days was the total work completed? a) 28 days b) 20 days c) 23 days d) 25 days e) 26 days 

Last Answer : a Kathir’s one day’s work= 1/20 Kathir’s 4 day’s work =4* (1/20) = 1/5 Work left= 1-1/5 = 4 /5 Anand’s one day’s work= 1/30 Anand can do work in = (4/5) *(30/ 1) = 24 days So total days = 24+4 = 28 days

Description : Twenty workers can complete a piece of work in 30 days. After how many days should 5 workers leave the job so that the work is completed in 35 days? a) 5 days b) 10 days c) 15 days d) 20 days

Last Answer : c) 15 days

Description : Prabu and balaji are two workers. Working together they can complete the whole work in 20 hours. If the Prabu worked for 5 hours and balaji worked for 17 hours, still there was half of the work to be done ... working alone, can complete the whole work? a) 17 hours b) 23 hours c) 34 hours d) 37 hours

Last Answer : C Efficiency of Prabu and balaji = 5% Prabu worked for 5 hours and balaji worked separately 17 hours. Which means it can be considered that Prabu and balaji worked together for 5 hours and balaji worked alone for ... (5-2.08) = 2.92% Thus, prabu require . = 34 hours to complete the work alone.

Description : Three pipes A, B and C can fill a tank in 6 hours. After working at it together for 2 hours, C is closed and A and B can fill the remaining part in 7 hours. The number of hours taken by C alone to fill the tank is: a) 10 b) 14 c) 12 d) 13 e) 15

Last Answer : (A+B+C) - (A+B) (A+B+C) =1/6 and (A+B+C) in 2hrs=2/6 and remaining part 1-2/6=2/3. So (A+B) in 7 hrs is 2/ (3*7) =2/21. 1/6-2/21=1/14 so answer is 14. Answer: b)

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : A can build up a wall in 8 days while B can break it in 3 days. A has worked for 4 days and then B joined to work with A for another 2 days only. In how many days will A alone build up the remaining part of the wall? a) 13/3 days b) 22/3 days c) 7/4 days d) 7 days e) None of these

Last Answer : Amount of work done by A in one day = 1/8th of the total work B can break 1/3rd of the work in one day Therefore, if both of them are working together then the work done in one day = 1/8 - 1/3 = -5/24 ... = 11/12 Time taken by A to finish 11/12th of the work = 11/12 8 = 22/3 days Answer: b)

Description : The peak of a 4 hour flood hydrograph is 240 m3 /sec. If the rainfall excess is 80 mm and base flow which is constant is 40 m3 /sec, peak of 4hours unit hydrograph will be (A) 20 m3 /sec (B) 25 m3 /sec (C) 30 m3 /sec (D) 35 m3 /sec

Last Answer : Answer: Option B

Description : 13 6 7 9 20 47.5 ? a) 149.5 b) 140.5 c) 150.5 d) 147.5 e) 145.5

Last Answer : The series is × 0.5 – 0.5, × 1 + 1, ×1.5 – 1.5, ×2 + 2, ... Answer: e)

Description : A and B enter into a partnership. A contributes Rs. 16,000 and B Rs. 12,000. At the end of 6 months C joins them with a capital of Rs. 20,000. In what ratio should they divide their annual profit? a) 8:6:5 b) 4 :3 :5 c) 5:6:8 d) 5:3:4 e) 5:7:8

Last Answer : a) 8:6:5

Description : A shopkeeper declares that he sells rice at the cost price. However he uses a weight of 425 grams. Instead of 500 grams, what is his percentage of profit? a) a) 16 5/6 b) 15 c) c) 20 7/23 d) 25 e) None of these

Last Answer : % profit = Loss/Actual Weight x 100 = 500 – 425/500 × 100 = 75/500 x 100 = 15% Answer: b)

Description : Ajay reads at an average rate of 30 pages per hour, while Vikram reads at an average rate of 40 pages per hour. If Ajay starts reading a novel at 4:30 PM and Vikram begins reading an identical copy of the same book at 5:20 PM, at ... same page? a) 7:50 PM b) 8:15 PM c) 8:40 PM d) 9:00 PM e) 9:25 PM

Last Answer : Ajay reads at average rate of 30 pages per hour ie. 1 page in every two minutes. Therefore, by 5:20 PM, he would have covered 25 pages By 6:20 PM, Ajay would have read 25+30 pages and Vikram would have ... and he will also finish 100 pages Hence, both of them will be on same page at 7:50 Answer: a)

Description : Two trains are running at 40 km/hr and 20 km/hr respectively in the same direction. Fast train completely passes a man sitting in the slower train in 5 seconds. What is the length of the fast train? A.27 7/9 m B.28 m C.29 m D.30 2/7 m E.None of these 

Last Answer : Answer – A (27 7/9 m) Explanation – When SAME direction- MINUS Relative speed = (40-20) km/hr = [20 x 5/18] m/sec = [50/9] m/sec. Length of faster train = sxt=[50/9 x 5] m = 250/9 m = 27 7/9 m.

Description : A task is done by 46 persons not all of them have the same capacity to task. Every day exactly 2 persons, do the task with no pair of persons working together twice. Even after all possible pairs have worked ... in which all the persons together will finish the whole task? a) 44 b) 45 c) 46 d) 47

Last Answer : D 46 persons task in pairs, with no same pair of persons working together. Each person will be working with other 45 which means each persons will work for 45 days in pair. Let the time taken by each ... +1/T46)= 1/47 If all the persons work together they will finish the whole task in 47 days.

Description : If six men working 8 hours a day earn Rs.840 per week, then 9 men working 6 hours per day will earn per week a) Rs. 940 b) Rs. 945 c) Rs. 1620 d) Rs. 1680 e) Rs. 1245

Last Answer : b) Rs. 945

Description : In what ratio must a person mix three kinds of Oats costing him Rs 1.20,Rs 1.44 and Rs 1.74 per Kg so that the mixture may be worth Rs 1.41 per Kg? A)11:77:7 B) 11:45:7 C)25:45:8 D) 27:23:6

Last Answer : A)11:77:7

Description : The average daily wages of 450 workers in a factory is Rs.45/- and the average daily wages of 340 workers in another factory is Rs.60/-.What is the approximate average daily wages of workers from both the factories together? a) Rs.61 b) Rs.59 c) Rs.70 d) Rs.51 e) Rs.60

Last Answer : Total wages of a factory =450 x 45= Rs. 20250/ Total wages of another factory = 340 x 60 = Rs. 20400 Total average = 20250 + 20400/450 + 340 = 40650/790 = 51.46 = Rs. 51 Answer: d)

Description : A man can do a piece of work in 10 days. With the help of a boy he can do the same piece of work in 8 days. If they get Rs. 11115 for the work then what will be the share of boys? a) Rs.2223 b) Rs.2784 c) Rs.3163 d) Rs.3312 e) None of these

Last Answer : In one day boys can do = (1/8) – (1/10) = (5-4)/10 = 1/40 part so, boys can finish the work in 40 days. Now, Men’s share : Boy’s share = 40 : 10 = 4 : 1 Boys share = (11115 / 5) × 1 = Rs. 2223 Answer is: a)

Description : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are required to complete double the work in 25 days, wo

Last Answer : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are ... work in 25 days, working 6 hours per day ?

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : Karthik is 2 times as good workman as Raghu and together they complete a piece of work in 42 days. The number of days taken by Karthik alone to finish the work is. a) 55 days b) 60 days c) 63 days d) 67 days

Last Answer : C Karthik’s 1 day work : Raghu’s 1 day work = 2:1 (Karthik + Raghu)’s 1 day work = 1/42 Divide 1/42 in the ratio 2:1 Therefore karthick’s 1 day work = 1/42 * 2/3 =1/63 Hence karthik alone can finish the work in 63 days.

Description : Rubika can do the 12 times the actual work in 72 days while sathya can do the one-half of the original work in 6 days. In how many days will both working together complete the 6 times of the original work? a) 20 days b) 25 days c) 30 days d) 35 days

Last Answer :  C Efficiency of Rubika = 16.666% Efficiency of sathya = 4.166% Total efficiency of rubika and sathya =(16+4) =20% Actual work 100/20=5 So, they can do actual work in 5 days So, 6 times work requires 30 days.

Description : Pipe A can fill a water tank in 8 hours, Pipe B can fill the same tank in 12 hours and Pipe C can empty the tank in 24 hours. If all three pipes are opened together, in how many hours will the tank be completely filled or empty? a) 4.8 hours b) 5 hours c) 5.4 hours d) 6 hours e) 7.2 hours

Last Answer : If all the three pipes are opened together, in one hour they will fill 1/8 + 1/12 – 1/24 = (3+2-1)/24 = 1/6 part of tank. So, to fill it completely it will take 6 hours. Answer is: d)

Description : A can complete a piece of work working along with B in 20 days. If he can complete the same work working along with C in 10 days, then between B and C

Last Answer : A can complete a piece of work working along with B in 20 days. If he can complete the same work ... , then between B and C who is more efficient ?

Description : P walks around a circular field at the rate of two rounds per hour while Q runs around it at the rate of eight rounds per hour. They start in the opposite direction from the same point at 6.45 a.m. They shall first cross each other at? a) 6.45 a.m b) 6.50 a.m c) 7.51 a.m d) 6.51 a.m e) 7.45 am

Last Answer : d Since P and Q move in the opposite direction along the circular field, so they will first meet each other when there is a difference of one round between the two. Relative speed of P and Q = 8+2 = 10 rounds per hour. Time ... 1/10 hr = 6 min. 6 Hrs 45 min + 6 min = 6 hrs 51 min i.e, 6.51 a.m

Description : Busses start from a bus terminal with a speed of 20 km/hr at intervals of 10 minutes. What is the speed of a man coming from the opposite direction towards the bus terminal if he meets the buses at intervals of 8 minutes? a) 3 km/hr b) 4 km/hr c) 5 km/hr d) 7 km/hr e) None of these

Last Answer : Distance covered in 10 minutes at 20 kmph = distance covered in 8 minutes at (20+x) kmph 20× 10/60=8/60(20+x) 200 = 160 + 8x 8x = 40 x=40/8=5 kmph Answer: c)

Description : If a train runs at 40 km/hour, it reaches its destination late by 11 minutes. But if it runs at 50 km/hour, it is late by 5 minutes only. The correct time (in minutes) for the train to complete the journey is? a) 13 b) 15 c) 19 d) 21 e) None of these

Last Answer : If the distance be x km, then x/40-x/50=6/60 x/4-x/5=1 x=20 km. Required time = (20/40) hour – 11 minutes = (1/2×60-11) minutes = 19 minutes Answer: c)

Description : Shweta deposits a certain amount on 1st January and 1st July (Same amount on both days) in a bank that offers 5% compound interest, compounded half-yearly. Shweta gains interest of Rs.121 at the end of the year. How much money did Shweta deposit? a) 1200 b) 1300 c) 1400 d) 1500 e) 1600

Last Answer : Let the amount be P Half yearly rate = 5/2 = 2.5% For the deposit on January, Amount = P (1 + 2.5 / 100)2 For the deposit on July, Amount = P (1 + 2.5 /100) We can solve the question by ... Amount in July = 1600 1.025 = 1640 So total interest = 81 + 40 = 121 Required answer is 1600 Answer: e)

Description : A and B together can do a piece of work in 20 days, while B and C together can do the same work in 15 days. If A ,B and C together can finish this wor

Last Answer : A and B together can do a piece of work in 20 days, while B and C together can do the same ... number of days in which B alone can finish the work.

Description : Hemant sold 10 sarees for a total profit of Rs. 460 and 12 sarees for a total profit of Rs. 144. At what profit per saree should he sell the remaining 20 sarees so that he gets an average profit of Rs. 18 per sarees? A. Rs 7.10 B. Rs 7.60 C. Rs 7.99 D. Rs 8

Last Answer : Answer – B (Rs 7.60) Explanation – Total profit required = Rs.(42 x 18) = Rs.756 Profit on 22 sarees = Rs. (460 + 144) = Rs. 604 Profit on 20 sarees = Rs. (756 – 604) = Rs. 152 Average profit on these sarees = Rs.(152/20) = Rs. 7.60

Description : Is X divisible by 12? a. X leaves a remainder 2 when divided by 8 b. X is divisible by 3. c. X is divisible by 6. a) If the data in statement a is sufficient to answer the question, while ... the question. e) If the data in statement a, b and c together are not sufficient to answer the question.

Last Answer : From (a), we notice that the number is of the form 8n+2, which means it also leaves a remainder 2 on being divided by 4. So, its not divisible by 12. From (b) and (c) together, the number can be any multiple of 6, from which we cant conclusively say if number is divisible by 12. Answer: a)

Description : Sush was thrice as old as Poonam 6 years back. Sush will be 5/3 times as old as Poonam 6 years hence. How old is Poonam today? A.20 B.14 C.12 D.15 E.None of these

Last Answer : Answer – C (12) Explanation – Let Poonam age 6 years back = x. Then, Sush age 6 years back = 3x. (5/3) * (X + 6 + 6) = (3X + 6 + 6) So 5(x+ 12) = 3(3x+ 12), so x=6. Poonam Age = (x+ 6) years = 12 years

Description : A tank can be filled by a tap in 6 hours and emptied by an outlet pipe in 8 hours. How long will it take to fill the cistern if both the taps are opened together? 1. 24 hours 2. 22 hours 3. 21 hours 4. 18 hours 5. 20 hours

Last Answer : 1;