Formwork:- The temporary casing provided to support concrete is known as formwork.

Related questions

Description : Define formwork and state the requirements of a good formwork.

Last Answer : Formwork: It is a temporary ancillary construction used as a mould for the structure, in which concrete is placed and in which it hardens and matures. Following are the requirements of good formwork:- ... be constructed so tight that it does not allow the cement paste to leak through the joints.

Description : Explain the requirements of good formwork with names and materials proposed for beam of size 300 X 450 mm with neat labeled sketch.  

Last Answer : Requirements of good formwork:- 1. It should be adequately strong to withstand an extensive variety of dead and live loads. For instance, self-weight, weight of reinforcement, weight of wet concrete, loads of ... of concreting. 8. It should be lightweight. 9. It should be easy to remove.

Description : Explain the requirement of good formwork.

Last Answer : Requirements of good formwork : 1. It should be strong enough to resist the pressure or the weight of the fresh concrete and the superimposed loads due to equipment, men etc., if any. This requires ... be less. 11. It should be easily possible to give the required geometrical shape to the form.

Description : Define the terms substructure and superstructure used in building construction.

Last Answer : Substructure: - A part of structure lying below the ground surface is known as substructure.  Superstructure: - A part of structure lying above the ground surface is called superstructure.

Description : Describe the procedure of water proofing used in slabs stating its importance in building construction.

Last Answer : Following is the stepwise procedure effectively applied in treatment of brick bat coba.  1 All existing treatment or coating on roof slab top is initially removed and surface is cleaned by hard wire brush ... surface is marked with 300 mm false squares The curing is done on next day. 

Description : Explain the types of probable cause of non-structural cracks observed in building construction along with preventive measures for any one of crack. 

Last Answer : Cause of cracks:   Cause # 1. Movement Due To Creep: Creep of a material is defined as the property due to which the material continues to deform with time under sustained stress. ... contraction and slip joints at appropriate location. Painting top roof with reflective finish such as white wash.

Description : State the classification of building as per type of construction. 

Last Answer : Following are the classification of building as per type of construction: 1. Residential Buildings. 2. Public Buildings. 3. Institutional Buildings. 4. Assembly building. 5. Business Buildings. ... . Storage Buildings. 8. Hazardous Buildings. 9. Framed structure. 10. Load bearing structure

Description : Explain the causes of non – structural cracks in building construction and remedial measures.

Last Answer : The important causes responsible for cracks in building are : 1. Due to movement of ground. 2. Due to temperature variation. 3. Due to moisture changes. 4. Due to effect of ... be good workmanship. 6. Uneven settlement of foundation should be avoided by resting foundation on hard strata.

Description : State the necessity and importance of waterproofing in building construction.

Last Answer : Necessity and importance of waterproofing in building construction: 1. It prevents leakage in the structure. 2. It prevents the entry of water into the structure. 3. It keeps the structure dry. ... It prevents the building to become inhabitable and unsafe. 6. It increases the life of building.

Description : Compare brick masonry and stone masonry used in building construction.

Last Answer : Sr. No. Brick Masonry Stone Masonry 1 It is less stronger than stone masonry. It is stronger than brick masonry. 2 It is cheaper in places where clay is available ... is used Double scaffolding is used 12 Plastering is required  Plastering is not required

Description : Compare stone masonry construction with brick masonry construction.

Last Answer : STONE MASONRY  BRICK MASONRY 1. Stone masonry is stronger and more durable than brick masonry 1. Brick masonry is less stronger and less durable than stone masonry. 2. ... other hand is considered unsuitable in the construction of piers, docks, dams and other marine structure.

Description : State the precautions to be observed in stone masonry construction.

Last Answer : Following are the precautions to be observed in stone masonry construction: 1. Stone used in masonry should be well seasoned, hard, tough, uniform in texture. 2. Stones used should be free from ... on the natural bed. 10. The exposed joints of the masonry should be properly pointed by mortar.

Description : Suggest relevant type of foundation with sketch for educational building on black cotton soil with justification. 

Last Answer : Black cotton soil- Pile foundation. In case the depth of black cotton soil is more, the following type of foundation may be provided 1. Strip or pad foundation 2. Pier foundation with ... of expansive soil. They are bored cast-in-situ concrete piles having bulb shaped enlarged base.

Description : State any two building components with their function.

Last Answer : Following are the Components of building - 1. Foundation : a) The function of foundation is to transfer the load of the building upto the hard strata which can support it without settling down. 1. b ... small children on terrace.  13. Lintels: a) It supports the portion of wall over the opening.

Description : Draw a neat labeled sectional view showing different components of building from foundation to parapet, for a load bearing brick masonry wall.

Last Answer : Draw a neat labeled sectional view showing different components of building from foundation to parapet, for a load bearing brick masonry wall.

Description : State any two functions of foundation of a building.

Last Answer : The functions of foundation are1) To transfer the load of the structure up to the hard strata. 2) To distribute load of the entire structure over a wide spread area. 3) To increase ... To prevent the lateral movement of supporting material To attain a level and firm bed for building operations.

Description : Suggest relevant type of foundation with sketch for a residential building with Marshy soil at greater depth with justification and explanation.

Last Answer : Raft foundation is suitable for a residential building with Marshy soil at greater depth It is suitable where ground is soft, Clayey or marshy having low bearing capacity and where sub soil water ... of thick reinforced concrete slab covering the entire area of the bottom of the structure.

Description : State the classification of building as per National Building Code Part III 2005.

Last Answer : Classification of building (as per NBC) 1. Residential Building, 2. Educational Building, 3. Institutional Building, 4. Assembly Building, 5. Business Building, 6. Mercantile Building, 7. Industrial Building, 8. Storage Building 9. Hazardous Building

Description : Define shoring. Enlist types of shoring. Explain any one type with neat sketch.

Last Answer : Shoring:- Shoring is the construction of a temporary structure to support temporarily an unsafe structure. These support walls laterally. Shoring can be used when walls bulge out, when walls crack due to ... of the structure above and transfer same to the ground on firm foundation below. 

Description : Define substructure and superstructure. Give their components also.

Last Answer : Substructure: - A part of structure lying below the ground surface is known as substructure. components of substructure :-1) foundation Superstructure: - A part of structure lying above the ground surface is called ... Beam 6) Roof 7) Doors 8) Windows 9) Lintel 10)Sill 11) Staircase 12) Parapet. 

Description : Define the job layout and site clearance.

Last Answer : job layout: A plan in which the arrangement for placing site office, store room, labour quarter, medical aid center, godowns for keeping construction material and other facility are properly prepared is ... plant, roots, old construction etc. to prepare a leveled ground for marking of layout.  

Description : Define the terms Newel post and Headroom in vertical communication.

Last Answer : Newel post : This is the vertical member which is placed at the ends of flights to connect the end of strings and hand rail.  Headroom : The vertical distance between the nosing of one flight and bottom of flight immediately above is known as the headroom.

Description : Define settlement of foundation and its types. Enlist various causes and suggest remedial measures for the same.

Last Answer : Settlement of foundation: Due to the self-weight and the live load of the structure and due to compressibility of the soil supporting the foundation of the structure, settlement of the ... of earthquake loads and other earthquake resisting methods during design and construction of buildings.

Description : Define the term ‘Landing and Pitch’ used in stair.

Last Answer : Landing: - It is flat platform at the top or bottom of a flight between the floors. Pitch: - It is the angle which the line of nosing of the stair makes with floor.

Description : Define facing, backing, hearting and Through stone with neat sketch.

Last Answer : Facing: The material used in the face of the wall is known as facing. Backing: The material used in the back of the wall is known as backing. Hearting: The inner portion of the wall ... A header stone having length equal to wall width is placed across the wall casted through stone.

Description : Define underpinning

Last Answer : Underpinning : The process of placing a new foundation under an existing one or strengthening an existing foundation is called underpinning of foundation.

Description : Define job layout

Last Answer : Job Layout: A systematic arrangement of various jobs / resources required for construction project around it, are chalked out on drawing so as to achieve economy, Safety & convenience.

Description : Raft foundation are generally preferred to when the area required for individual footing, is more than (A) 25% to total area (B) 30% of total area (C) 40% to total area (D) 50% of total area

Last Answer : Option D

Description : Pick up the correct statement from the following: (A) Isolated footing is provided under column to transfer the load safely to soil bed (B) Column footings may have steps or projections in the ... ) Heavily loaded column base must be provided steel reinforcement in both directions (D) All the above

Last Answer : Option D

Description : The pile provided with one or more bulles in its vertical shaft, is generally known as (A) Under-ream pile (B) Friction pile (C) Bearing pile (D) Sheet pile

Last Answer : Option A

Description : The Auger borings are not common (A) In soils that require lateral support (B) In cohesive soils (C) In soft soils (D) None of the above

Last Answer : Option A

Description : Pitched and sloping roofs are suitable for (A) Coastal regions (B) Plain regions (C) Covering large areas (D) All of the above

Last Answer : Option A

Description : A wall constructed to resist the pressure of an earth filling, is called (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Option A

Description : Pick up the correct statement from the following: (A) The pile driven in sand is called sand pile (B) The drilled hole filled with sand is called sand pile (C) The sand piles are used for bearing purposes (D) None of these

Last Answer : Option A

Description : The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called (A) Brick on edge (B) Brick on end (C) Brick on bed (D) Brick held vertically

Last Answer : Option B

Description : The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as (A) Combined footing (B) Strap footing (C) Raft footing (D) None of these

Last Answer : Option C

Description : The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is (A) Truck pointing (B) Recessed pointing (C) Struck pointing (D) Grooved pointing

Last Answer : Option C

Description : For different layers of cement concrete floor. Pick up the incorrect statement from the following: (A) The lowest layer consists of consolidated ground (B) A 10 cm thick clean sand is laid on consolidated ground (C) ... sand (D) A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer

Last Answer : Option D

Description : Higher pitch of the roof (i) Results in stronger roof (ii) Results in weaker roof (iii) Requires more covering material (iv) Requires less covering material The correct answer is (A) (i) and (iii) (B) (i) and (iv) (C) (ii) and (iii) (D) (ii) and (iv)

Last Answer : Option A

Description : A wall constructed with stones to protect slopes of cuttings in natural ground from the action of weathering agents, is called (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Option B

Description : Pick up the correct statement from the following: (A) D.P.C. should be continuous (B) D.P.C. should be of good impervious material (C) D.P.C. may be horizontal or vertical (D) All the above

Last Answer : Option D

Description : The inclined surface of an abutment to receive the arch, is known as (A) Skew back (B) Soffit (C) Spandril (D) Haunch

Last Answer : Option A

Description : Pick up the correct statement from the following: (A) A mortar joint having a concave finishing in brick masonry, is called keyed joint (B) A mortar joint projecting beyond the face of a masonry wall, is ... (C) A mortar joint having a recess in it, is called ruled joint (D) All the above

Last Answer : Option D

Description : The pile which supports the load due to friction between pile face and surrounding soil, is generally known as (A) Bearing pile (B) Friction pile (C) Sheet pile (D) Battered pile

Last Answer : Option B

Description : The form work from the slabs excluding props, can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 days

Last Answer : Option B

Description : Cast iron piles (A) Are suitable for works under sea water (B) Resist shocks or vibrations (C) Are suitable for use as batter piles (D) Are useful for heavy vertical loads

Last Answer : Option D

Description : The form work from the slabs excluding props, can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 days

Last Answer : Answer: Option B

Description : Cast iron piles (A) Are suitable for works under sea water (B) Resist shocks or vibrations (C) Are suitable for use as batter piles (D) Are useful for heavy vertical loads

Last Answer : Answer: Option D

Description : Explain raft foundation with neat sketch and explain its suitability. 

Last Answer : Raft Footing: It is suitable where ground is soft. Clayey or marshy having low bearing capacity, and where sub soil water conditions are uncertain. The raft foundation is also used to reduce settlement below highly compressible soils