Suggest the roofing material for various types of pitched roofs with justification.

1 Answer

Answer :

Roof covering is an essential component of pitched roof to be placed over the framework

Types of roof covering

• Thatch covering: It is a very old roofing method and has been used in both tropical and temperate climates. People who desire a rustic look for their home, would like a more ecologically friendly roof.

• Wood shingle roofing: Used in hilly areas

• Tile roofing: Used for residential buildings and country houses

• Asbestos cement sheet roofing: Used for industrial buildings, factories, sheds, cinema houses, auditorium, residential buildings

• Galvanised corrugated iron sheet roofing: Not used for slopes flatter than 1 in 4

• Eternit or slate roofing: slate roof pitches as low as 15°.

• Light weight roofing: Used for wide span industrial structures

Related questions

Description : Pitched and sloping roofs are suitable for (A) Coastal regions (B) Plain regions (C) Covering large areas (D) All of the above

Last Answer : Option A

Description : Suggest relevant type of foundation with sketch for educational building on black cotton soil with justification. 

Last Answer : Black cotton soil- Pile foundation. In case the depth of black cotton soil is more, the following type of foundation may be provided 1. Strip or pad foundation 2. Pier foundation with ... of expansive soil. They are bored cast-in-situ concrete piles having bulb shaped enlarged base.

Description : Suggest relevant type of foundation with sketch for a residential building with Marshy soil at greater depth with justification and explanation.

Last Answer : Raft foundation is suitable for a residential building with Marshy soil at greater depth It is suitable where ground is soft, Clayey or marshy having low bearing capacity and where sub soil water ... of thick reinforced concrete slab covering the entire area of the bottom of the structure.

Description : How do flat, low slope, and pitched roofs compare for commercial roofing in Utah?

Last Answer : While flat, low slope, and pitched roofing are all great choices for commercial roofing in Utah, they do have different characteristics. Flat roofs are a popular choice due to their affordability, the fact that they ... etc. A benefit to this style of roof is that it can shed rain, snow, and other

Description : Define settlement of foundation and its types. Enlist various causes and suggest remedial measures for the same.

Last Answer : Settlement of foundation: Due to the self-weight and the live load of the structure and due to compressibility of the soil supporting the foundation of the structure, settlement of the ... of earthquake loads and other earthquake resisting methods during design and construction of buildings.

Description : Suggest precaution to be taken during demolition.

Last Answer : Following precaution to be taken during demolition: 1. Complete evacuation of building including pets and other animals. 2. Careful study of the building. 3. Emptying of surrounding area. ... explosive. 8.Action plan already prepared if explosion goes wrong or only partial explosion occur.

Description : Draw neat sketches of any three shallow foundations and suggest suitability of them for different loading and soil conditions.

Last Answer : Types of shallow foundation with their suitability: 1. Wall Footing: Wall footings are used for individual columns, walls and bridge piers where the bearing soil layer is within 3m (10 feet) from the ground surface. Soil ... bearing capacity of soil.    9. Slab Base:   10.Gusseted base:  

Description : Suggest commonly adopted sizes of door for: 1) Internal door of residential bldg. 2) Door of garage for car park

Last Answer :  1) Internal door of residential bldg. - 900 X 2100 mm 2) Door of garage for car park. – 2250 X 2250 mm

Description : Enlist and draw various fixtures and fastenings for doors and windows. 

Last Answer : Types of Fixtures and Fastenings for Doors and Windows Hinges Hinge is fixture which helps the door to rotate freely along its axis. There are so many types of hinges are there which are as ... them are padlock, mortise lock, rim lock, cupboard lock and lever handle lock etc.

Description : State the various causes of settlement of structure.

Last Answer : 1. Uneven bearing capacity of soil at foundation level 2. Different loads on different parts of foundation 3. Varying ground water table height 4. Compressible foundation soil 5. ... compression, plastic flow or consolidation under static load 10. Undermining of soil below the foundation

Description : Higher pitch of the roof (i) Results in stronger roof (ii) Results in weaker roof (iii) Requires more covering material (iv) Requires less covering material The correct answer is (A) (i) and (iii) (B) (i) and (iv) (C) (ii) and (iii) (D) (ii) and (iv)

Last Answer : Option A

Description : Pick up the correct statement from the following: (A) D.P.C. should be continuous (B) D.P.C. should be of good impervious material (C) D.P.C. may be horizontal or vertical (D) All the above

Last Answer : Option D

Description : Define shoring. Enlist types of shoring. Explain any one type with neat sketch.

Last Answer : Shoring:- Shoring is the construction of a temporary structure to support temporarily an unsafe structure. These support walls laterally. Shoring can be used when walls bulge out, when walls crack due to ... of the structure above and transfer same to the ground on firm foundation below. 

Description : Explain the types of probable cause of non-structural cracks observed in building construction along with preventive measures for any one of crack. 

Last Answer : Cause of cracks:   Cause # 1. Movement Due To Creep: Creep of a material is defined as the property due to which the material continues to deform with time under sustained stress. ... contraction and slip joints at appropriate location. Painting top roof with reflective finish such as white wash.

Description : Enlist any four types of floor finishes.

Last Answer : Four types of floor finishes:- 1)Shahabad flooring 2) Kota flooring 3) Marble flooring 4) Granite flooring 5) Kadappa 6) Mosaic tiles 7) Pavement blocks 8)Tiled flooring 9) Tremix floor 10)Vitrified tiles 11) IPS 12) Ceramic

Description : Enlist different types of staircase. Explain any one type with a neat sketch.

Last Answer : Types of Staircase: 1. Straight Stair 2. Dog legged Stair 3. Quarter turn Stair 4. Open well Stair 5. Three quarter turn Stair 6. Bifurcated Stair 7. Geometrical Stair 8. Circular ... . This well may be rectangular or of any geometrical shape and it can be used for fixing lift.

Description : Raft foundation are generally preferred to when the area required for individual footing, is more than (A) 25% to total area (B) 30% of total area (C) 40% to total area (D) 50% of total area

Last Answer : Option D

Description : Pick up the correct statement from the following: (A) Isolated footing is provided under column to transfer the load safely to soil bed (B) Column footings may have steps or projections in the ... ) Heavily loaded column base must be provided steel reinforcement in both directions (D) All the above

Last Answer : Option D

Description : The pile provided with one or more bulles in its vertical shaft, is generally known as (A) Under-ream pile (B) Friction pile (C) Bearing pile (D) Sheet pile

Last Answer : Option A

Description : The Auger borings are not common (A) In soils that require lateral support (B) In cohesive soils (C) In soft soils (D) None of the above

Last Answer : Option A

Description : A wall constructed to resist the pressure of an earth filling, is called (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Option A

Description : Pick up the correct statement from the following: (A) The pile driven in sand is called sand pile (B) The drilled hole filled with sand is called sand pile (C) The sand piles are used for bearing purposes (D) None of these

Last Answer : Option A

Description : The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called (A) Brick on edge (B) Brick on end (C) Brick on bed (D) Brick held vertically

Last Answer : Option B

Description : The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as (A) Combined footing (B) Strap footing (C) Raft footing (D) None of these

Last Answer : Option C

Description : The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is (A) Truck pointing (B) Recessed pointing (C) Struck pointing (D) Grooved pointing

Last Answer : Option C

Description : For different layers of cement concrete floor. Pick up the incorrect statement from the following: (A) The lowest layer consists of consolidated ground (B) A 10 cm thick clean sand is laid on consolidated ground (C) ... sand (D) A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer

Last Answer : Option D

Description : A wall constructed with stones to protect slopes of cuttings in natural ground from the action of weathering agents, is called (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Option B

Description : The inclined surface of an abutment to receive the arch, is known as (A) Skew back (B) Soffit (C) Spandril (D) Haunch

Last Answer : Option A

Description : Pick up the correct statement from the following: (A) A mortar joint having a concave finishing in brick masonry, is called keyed joint (B) A mortar joint projecting beyond the face of a masonry wall, is ... (C) A mortar joint having a recess in it, is called ruled joint (D) All the above

Last Answer : Option D

Description : The pile which supports the load due to friction between pile face and surrounding soil, is generally known as (A) Bearing pile (B) Friction pile (C) Sheet pile (D) Battered pile

Last Answer : Option B

Description : The form work from the slabs excluding props, can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 days

Last Answer : Option B

Description : Cast iron piles (A) Are suitable for works under sea water (B) Resist shocks or vibrations (C) Are suitable for use as batter piles (D) Are useful for heavy vertical loads

Last Answer : Option D

Description : The form work from the slabs excluding props, can be removed only after (A) 1 day (B) 4 days (C) 7 days (D) 14 days

Last Answer : Answer: Option B

Description : Cast iron piles (A) Are suitable for works under sea water (B) Resist shocks or vibrations (C) Are suitable for use as batter piles (D) Are useful for heavy vertical loads

Last Answer : Answer: Option D

Description : Explain the requirements of good formwork with names and materials proposed for beam of size 300 X 450 mm with neat labeled sketch.  

Last Answer : Requirements of good formwork:- 1. It should be adequately strong to withstand an extensive variety of dead and live loads. For instance, self-weight, weight of reinforcement, weight of wet concrete, loads of ... of concreting. 8. It should be lightweight. 9. It should be easy to remove.

Description : Explain raft foundation with neat sketch and explain its suitability. 

Last Answer : Raft Footing: It is suitable where ground is soft. Clayey or marshy having low bearing capacity, and where sub soil water conditions are uncertain. The raft foundation is also used to reduce settlement below highly compressible soils

Description : Differentiate between brick masonry and stone masonry

Last Answer : Sr. no. Brick masonry Stone masonry 1 It is cheaper than stone masonry It is stronger than Brick masonry 2 It is cheaper in places where clay is available It is ... easy to apply any finishing to Brick surface. It is difficult to apply any finishing to stone surface

Description : State any four precautions to be taken while plastering.

Last Answer : i. Before application of the plastering, the surface must be clean and free of dirt, oil, or other elements which may interfere with bonding. ii. Smooth or non-absorbent surfaces should be prepared. iii. ... or vertical line at the end of the day or if work requires to be suspended for any reason.

Description : Explain the procedure of preparation of surface along with the method of application of color wash paint on the wall.

Last Answer : The correct preparation of surface plays an important role in preserving the properties and life of the paint. For these the procedure is as follows: 1.If the receiving surface is rough, it should be made smooth ... of color wash paint on the wall. 1.By Brushing. 2.By Spraying. 3. By Rollers.

Description : Define substructure and superstructure. Give their components also.

Last Answer : Substructure: - A part of structure lying below the ground surface is known as substructure. components of substructure :-1) foundation Superstructure: - A part of structure lying above the ground surface is called ... Beam 6) Roof 7) Doors 8) Windows 9) Lintel 10)Sill 11) Staircase 12) Parapet. 

Description : Describe the procedure of water proofing used in slabs stating its importance in building construction.

Last Answer : Following is the stepwise procedure effectively applied in treatment of brick bat coba.  1 All existing treatment or coating on roof slab top is initially removed and surface is cleaned by hard wire brush ... surface is marked with 300 mm false squares The curing is done on next day. 

Description : Explain four defects in plastering with neat sketch.

Last Answer : Following are the defects in plastering: 1) Blistering of plastered surface: it is the defect in which small patches of plaster are swelled out from the plastered surface. 2 ... defect in which there is complete dislocation of some portion of plastered surface which forms the patches. 

Description : Describe any eight characteristics of good stone masonry. 

Last Answer : The requirements of good stone masonry are as follows:- 1. The stones to be used for stone masonry should be hard, tough & durable. 2. The stone should be properly dressed as per the ... constructed perfectly in plumb. 11. The exposed joints of the masonry should be properly pointed by mortar.

Description : State any four precautions to be taken while marking layout on ground.

Last Answer : The necessary precaution to be taken while marking layout on ground are as follows 1. All vertical wooden post should be firmly fixed into the ground with concrete and curing should be done to the ... the face line or center line correctly. 19. Use proper or correct plumb bob for centering. 

Description : Difference between load bearing structure and framed structure

Last Answer : Description Load bearing structure Framed Structure Sub soil condition Suitable only when hard strata are available at shallow depth Suitable for any type of soil Number of storey's 3 ... The frame can be RCC( beam/ Column) frame, I- Section Steel frame, Wood frame etc.

Description : State the classification of building as per type of construction. 

Last Answer : Following are the classification of building as per type of construction: 1. Residential Buildings. 2. Public Buildings. 3. Institutional Buildings. 4. Assembly building. 5. Business Buildings. ... . Storage Buildings. 8. Hazardous Buildings. 9. Framed structure. 10. Load bearing structure

Description : Define the job layout and site clearance.

Last Answer : job layout: A plan in which the arrangement for placing site office, store room, labour quarter, medical aid center, godowns for keeping construction material and other facility are properly prepared is ... plant, roots, old construction etc. to prepare a leveled ground for marking of layout.  

Description : State the function of window sill and lintel.

Last Answer : a)Sill 1. To provide suitable finish to window opening. 2. It also affords a protection to wall below the window 3.It also provides the support to vertical members of the openings. b) Lintel ... the opening. 2. They are used to transmit the load to adjacent wall over which they are supported.

Description : Define the terms Newel post and Headroom in vertical communication.

Last Answer : Newel post : This is the vertical member which is placed at the ends of flights to connect the end of strings and hand rail.  Headroom : The vertical distance between the nosing of one flight and bottom of flight immediately above is known as the headroom.