Description : Uniform ramming of sand in green sand moulding process leads to (A) Reduced chance of gas porosity (B) Greater dimensional stability of the casting (C) Uniform flow of molten metal into the mould cavity (D) Less sand expansion type of casting defect
Last Answer : Option B
Description : Bearing capacity of soils cannot be improved by (A) Draining sub-soil water (B) Ramming crushed stone in soil (C) Driving sand piles (D) Watering surface of soil
Last Answer : Answer: Option D
Description : For providing a raft foundation, the following activities are involved 1. Ramming the foundation bed 2. Excavation of the soil upto required depth 3. Laying the reinforcement over the foundation bed 4. Curing the cement concrete placed over ... 2, 1 (C) 2, 1, 3, 5, 4 (D) 3, 2, 5, 1, 4
Last Answer : Answer: Option C
Description : Competitive interference with a test marketing programme is called A)tactical interference. B)jamming. C)test interference. D)squeezing. E)ramming.
Last Answer : B)jamming.