The output of problem definition stage is ……………..
A) Master Development Plan
B) Terms of reference
C) Feasibility report
D) Final product

1 Answer

Answer :

B) Terms of reference

Related questions

Description : State True or False. 1. Term of reference is the final output of Feasibility Study 2. Design specification report is the final output of System Analysis A) 1-true, 2-true B) 1-false, 2-true C) 1-true, 2-false D) 1-false, 2-false

Last Answer : A) 1-true, 2-true

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : The main ingredient of the report documenting the ……………… is the cost benefit analysis. A) System Analysis B) Feasibility Study C) System Analyst D) System Design

Last Answer : B) Feasibility Study

Description : ……….. includes review of the existing procedures and information flow. A) Feasibility Study B) Feasibility report C) System Design D) System analysis

Last Answer : A) Feasibility Study

Description : Project mission and objectives, procedures and systems used, and organization resources used typically appear in the _____ section of the final project report. A. Analysis B. Recommendation C. lessons learned D. financial feasibility

Last Answer : A. Analysis

Description : …………………… is a schedule of various applications to be computerized. A) Materials planning B) Master development Plan C) Manufacturing organization D) None of the above

Last Answer : B) Master development Plan

Description : State True or False. i) Master Development Plan basically is a schedule of various applications to be comprised. ii) It consists of start and finish dates of a system analysis, design implementation and maintenance activities. ... B) i-False, ii-True C) i-True, ii-False D) i-False, ii-False

Last Answer : A) i-True, ii-True

Description : MDP stands for A) Master Development Plan B) Master Design Program C) Mandatory Database Program D) Master Database Plan

Last Answer : A) Master Development Plan

Description : In XML, DOCTYPE declaration specifies to include a reference to ............ file. (A) Document Type Definition (B) Document Type Declaration (C) Document Transfer Definition (D) Document Type language

Last Answer : (A) Document Type Definition

Description : Feasibility analysis is the first stage in the process of project development. (True/False)

Last Answer : Ans. True

Description : The key considerations involved in the feasibility analysis is include i) Economical ii) Technical iii) Behavioral iv) Personal A) i, ii, iv B) i, ii, iii C) ii, iii, iv D) All of the above

Last Answer : B) i, ii, iii

Description : ………….. Phase is a time consuming phase and yet a very crucial phase A) Feasibility Study B) Requirement Phase C) Analysis Phase D) Testing Phase

Last Answer : C) Analysis Phase

Description : The Key considerations involved in the feasibility analysis is / are ………………. A) Economic B) Technical C) Behavioral D) A, B, C

Last Answer : D) A, B, C

Description : Requirements prioritization and negotiation belongs to: (A) Requirements validation (B) Requirements elicitation (C) Feasibility Study (D) Requirement reviews

Last Answer : (B) Requirements elicitation

Description : The major shortcoming of waterfall model is (A) the difficulty in accommodating changes after requirement analysis. (B) the difficult in accommodating changes after feasibility analysis. (C) the system testing. (D) the maintenance of system.

Last Answer : (A) the difficulty in accommodating changes after requirement analysis.

Description : If Master Foods Ltd knows that its market share in Ireland has dropped 13 percent in the first quarter of the year but does not know what might have contributed to this ... research process? A)hypothesis development B)symptom identification C)problem identification D)data interpretation

Last Answer : C)problem identification

Description : Based on the identification of objectives, input, output and file content, the vital document is called … A) System Definition B) System Document C) System Requirement Document D) System Subject

Last Answer : B) System Document

Description : Which one of the following is not a definition of error ? (A) It refers to the discrepancy between a computed, observed or measured value and the true, specified or theoretically correct value. (B) It ... to fail. (D) It refers to human action that results in software containing a defect or fault. 

Last Answer : The input, or clock pulse.

Description : The final stage in the development of an advertising campaign is 1. creating the advertising platform 2. developing the media plan 3. creating the advertising message 4. evaluating the effectiveness of advertising 5. none of these

Last Answer : evaluating the effectiveness of advertising

Description : In the marketing planning cycle, the final stage is: A)implementation of the marketing plan. B)revision or formulation of marketing strategy. C)development or revision of marketing objectives ... opportunities and resources. E)development or revision of the plan for implementation and control.

Last Answer : A)implementation of the marketing plan.

Description : The final stage in the development of an advertising campaign is A)creating the advertising platform. B)developing the media plan. C)creating the advertising message. D)evaluating the effectiveness of advertising.

Last Answer : D)evaluating the effectiveness of advertising.

Description : Statement of scope and objectives, opportunities and performance criteria …………. A) Problem definition B) System analysis C) System Design D) Documentation

Last Answer : A) Problem definition

Description : A typical objective of an operational audit is for the auditor to a. Determine whether the financial statements fairly present the entity's operations. b. Evaluate the feasibility of ... recommendation for improving performance. d. Report on the entity's relative success in maximizing profits

Last Answer : Make recommendation for improving performance

Description : Software safety is quality assurance activity that focuses on hazards that (A) affect the reliability of a software component (B) may cause an entire system to fail. (C) may result from user input errors. (D) prevent profitable marketing of the final product

Last Answer : (B) may cause an entire system to fail.

Description : The voltage at the reference electrode of the circuit shown in the illustration is applied to the input of a/an ______________. EL-0090 A. class A detector whose output drives an ... drives an 2-stage isolation transformer D. magnetic amplifier whose output controls a saturable reactor

Last Answer : Answer: D

Description : …………… database is used as template for all databases created. A) Master B) Model C) Tempdb D) None of the above

Last Answer : B) Model

Description : Synchronization is achieved by a timing device called a ................. which generates a periodic train of .................. (A) clock generator, clock pulse (B) master generator, clock pulse (C) generator, clock (D) master clock generator, clock pulse

Last Answer : Answer: A and D

Description : Which of the following flip-flops is free from race condition ? (A) T flip-flop (B) SR flip-flop (C) Master-slave JK flip-flop (D) None of the above

Last Answer : (C) Master-slave JK flip-flop

Description : The of ‘Research ethics’ may be considered pertinent at which stage of research? (A) At the stage of problem formulation and its definition (B) At the stage of defining the population of research (C) At the stage of data collection and interpretation (D) At the stage of reporting the findings.

Last Answer : (D) At the stage of reporting the findings.

Description : __________________ is the systematic development of a project idea for the eventual purpose of arriving at an investment decision. A. Project identification. B. Project formulation. C. Project feasibility. D. Project evaluation.

Last Answer : B. Project formulation.

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : The main purpose of the Project Management Plan is to:  a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk  of alternative options.  b ... managing the project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for  managing the project.

Description : _________________ implies the availability or otherwise of plant and machinery and technical know how to produce the product. A. Economic viability. B. Financial feasibility. C. Technical feasibility. D. Managerial competence

Last Answer : C. Technical feasibility.

Description : The brand choice is heavily influenced by reference group in which stage of Product life cycle? A. Introduction B. Growth C. Maturity D. Decline

Last Answer : C. Maturity

Description : What is the difference between Call by value and Call by reference?

Last Answer : A: Call By Value : When a function is called by value, then the value of the actual parameter is copied to the formal parameter (i.e. a separate copy is made). Any changes made with the ... with the values at that address of the formal parameter affects (changes) the value of the actual parameter.

Description : A ……………. takes a reference to an object of the same class as itself as an argument. A) Reference constructor B) Copy Constructor C) Self Constructor

Last Answer : B) Copy Constructor

Description : Automatic initialization of object is carried out using a special member function called ………… A) Friend B) Casting C) Reference Parameter D) Constructor

Last Answer : D) Constructor

Description : Which of the following cannot be passed to a function? A) Reference variable B) Arrays C) Class objects D) Header files

Last Answer : D) Header files

Description : With ................ a page is brought into main memory only when the reference is made to a location on that page. A) demand paging B) main paging C) prepaging D) postpaging

Last Answer : A) demand paging

Description : Arrays in C language can have ................. with reference to memory representation. (A) n-subscripts (B) two-subscripts (C) only one subscript (D) three subscripts only

Last Answer : (C) only one subscript 

Description : Which of the following points lies on the same side as the origin, with reference to the line 3x+7y=2 ? (A) (3, 0) (B) (1, 0) (C) (0.5, 0.5) (D) (0.5, 0)

Last Answer : (D) (0.5, 0) Explanation: If (0.5, 0) is substituted in the equation, we get 1.5 which is less than 2, then it lies on the same side as that of the origin. 

Description : Which layer of OSI reference model is responsible for decomposition of messages and generation of sequence numbers to ensure correct re-composition from end to end of the network? (A) Physical (B) Data-link (C) Transport (D) Application

Last Answer : (C) Transport 

Description : Which layers of the OSI reference model are host-to-host layers ? (A) Transport, Session, Presentation, Application (B) Network, Transport, Session, Presentation (C) Data-link, Network, Transport, Session (D) Physical, Data-link, Network, Transport

Last Answer : (A) Transport, Session, Presentation, Application

Description : The advantage of ............... is that it can reference memory without paying the price of having a full memory address in the instruction. (A) Direct addressing (B) Indexed addressing (C) Register addressing (D) Register Indirect addressing

Last Answer : (D) Register Indirect addressing

Description : Consider a program that consists of 8 pages (from 0 to 7) and we have 4 page frames in the physical memory for the pages. The page reference string is :  1 2 3 2 5 6 3 4 6 3 7 3 1 5 3 6 3 4 2 4 3 4 5 ... to fill available page frames with pages): (A) 9 and 6 (B) 10 and 7 (C) 9 and 7 (D) 10 and 6

Last Answer : (B) 10 and 7

Description : Which of the following is not valid with reference to Message Passing Interface (MPI)? (A) MPI can run on any hardware platform (B) The programming model is a distributed memory model. (C) All ... implicit. (D) MPI - Comm - Size returns the total number of MPI processes in specified communication.

Last Answer : (C) All parallelism is implicit.

Description : A LRU page replacement is used with four page frames and eight pages. How many page faults will occur with the reference string 0172327103 if the four frames are initially empty? (A) 6 (B) 7 (C) 5 (D) 8

Last Answer : (B) 7

Description : Which of the following is/are correct with reference to Abstract class and interface ? (a) A class can inherit only one Abstract class but may inherit several interfaces. (b) An Abstract class can provide complete and default ... true (C) Both (a) and (b) are true (D) Neither (a) nor (b) is true

Last Answer : Answer: C

Description : Which of the following statements are true with reference to the way of describing XML data ? (a) XML uses DTD to describe the data (b) XML uses XSL to describe the data (c) XML uses a description node to describe the data Codes : (A) (a) only (B) (b) only (C) (a) and (b) (D) (a) and (c)

Last Answer : Answer: D