Description : ………….. Phase is a time consuming phase and yet a very crucial phase A) Feasibility Study B) Requirement Phase C) Analysis Phase D) Testing Phase
Last Answer : C) Analysis Phase
Description : Which of the following is not included in waterfall model ? (A) Requirement analysis (B) Risk analysis (C) Design (D) Coding
Last Answer : (B) Risk analysis
Description : Waterfall model is not suitable for ? Small Projects Complex Projects Accommodating change None of Above
Last Answer : Accommodating change
Description : Requirements prioritization and negotiation belongs to: (A) Requirements validation (B) Requirements elicitation (C) Feasibility Study (D) Requirement reviews
Last Answer : (B) Requirements elicitation
Description : Which of the following statement(s) is/are TRUE with regard to software testing? I. Regression testing technique ensures that the software product runs correctly after the changes during maintenance. II. Equivalence partitioning is a ... (1) only I (2) only II (3) both I and II (4) neither I nor II
Last Answer : (1) only I
Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis
Last Answer : e) Risk analysis
Description : State True or False. 1. Term of reference is the final output of Feasibility Study 2. Design specification report is the final output of System Analysis A) 1-true, 2-true B) 1-false, 2-true C) 1-true, 2-false D) 1-false, 2-false
Last Answer : A) 1-true, 2-true
Description : The main ingredient of the report documenting the ……………… is the cost benefit analysis. A) System Analysis B) Feasibility Study C) System Analyst D) System Design
Last Answer : B) Feasibility Study
Description : ……….. includes review of the existing procedures and information flow. A) Feasibility Study B) Feasibility report C) System Design D) System analysis
Last Answer : A) Feasibility Study
Description : Which of the following activity is undertaken immediately after feasibility study and before the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling
Last Answer : A. Project Planning
Description : The key considerations involved in the feasibility analysis is include i) Economical ii) Technical iii) Behavioral iv) Personal A) i, ii, iv B) i, ii, iii C) ii, iii, iv D) All of the above
Last Answer : B) i, ii, iii
Description : The Key considerations involved in the feasibility analysis is / are ………………. A) Economic B) Technical C) Behavioral D) A, B, C
Last Answer : D) A, B, C
Description : What are the stages in the compilation process? A) Feasibility study, system design and testing B) Implementation and documentation C) Lexical Analysis, syntax analysis, and code generation D) None of the above
Last Answer : Answer : C
Description : Which process model is also called as classic life cycle model? (A) Waterfall model (B) RAD model (C) Prototyping model (D) Incremental model
Last Answer : (A) Waterfall model
Description : The quick design of a software that is visible to end users leads to ............ (A) iterative model (B) prototype model (C) spiral model (D) waterfall model
Last Answer : (B) prototype model
Description : Adaptive maintenance is a maintenance which ............. (A) Correct errors that were not discovered till testing phase. (B) is carried out to port the existing software to a new environment. (C) improves the system performance. (D) both (B) and (C)
Last Answer : (B) is carried out to port the existing software to a new environment.
Description : State True or False. i) Master Development Plan basically is a schedule of various applications to be comprised. ii) It consists of start and finish dates of a system analysis, design implementation and maintenance activities. ... B) i-False, ii-True C) i-True, ii-False D) i-False, ii-False
Last Answer : A) i-True, ii-True
Description : Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ? (A) Requirement validation is one of the activities in the requirements phase. (B) ... . (D) Function points is one of the most commonly used size metric for requirements.
Last Answer : (C) “Modelling-oriented approach” is one of the methods for specifying the functional specifications.
Description : Software Configuration Management is the discipline for systematically controlling (A) the changes due to the evolution of work products as the project proceeds. (B) the changes due to defects (bugs) being found and then fixed. (C) the changes due to requirement changes (D) all of the above
Last Answer : (D) all of the above
Description : In which testing strategy requirements established during requirements analysis are validated against developed software? (A) Validation testing (B) Integration testing (C) Regression testing (D) System testing
Last Answer : (A) Validation testing
Description : Which one of the following statements is incorrect ? (A) Pareto analysis is a statistical method used for analyzing causes, and is one of the primary tools for quality management. (B) Reliability of ... (D) In white-box testing, the test cases are decided from the specifications or the requirements.
Last Answer : (D) In white-box testing, the test cases are decided from the specifications or the requirements.
Description : The output of problem definition stage is …………….. A) Master Development Plan B) Terms of reference C) Feasibility report D) Final product
Last Answer : B) Terms of reference
Description : Which of the following is a conceptual difference between the attestation standards and generally accepted auditing standards? a. The attestation standards do not permit an attest engagement ... standards of fieldwork in generally accepted auditing standards are included in the attestation standards
Last Answer : The attestation standards provide a framework for the attest function beyond historical financial statements.
Description : What is the first stage in software development? A) Specification and design B) Testing C) System Analysis D) Maintenance
Description : Which of the following uses Impact Analysis most? a) Component testing b) Non-functional system testing c) User acceptance testing d) Maintenance testing
Last Answer : d) Maintenance testing
Description : Database applications were built directly on top of file system to overcome the following drawbacks of using file-systems (a) Data redundancy and inconsistency (b) Difficulty in accessing Data (c) Data isolation (d) Integrity problems (A) (a) (B) ... d) (C) (a), (b) and (c) (D) (a), (b), (c) and (d)
Last Answer : (D) (a), (b), (c) and (d)
Description : A major problem with using style modification is that 1. customers have difficulty recognizing that a change has been made 2. such changes do not yield long lasting appeal 3. customers may perceive such modifications as less attractive 4. they are almost always very costly 5. none of these
Last Answer : customers may perceive such modifications as less attractive
Description : A major problem with using style modification is that: A)customers have difficulty recognising that a change has been made B)such changes do not yield long-lasting appeal C)customers may perceive such modifications as less attractive D)they are almost always very costly
Last Answer : C)customers may perceive such modifications as less attractive
Description : What are the three generic phases of software engineering? (A) Definition, development, support (B) What, how, where (C) Programming, debugging, maintenance (D) Analysis, design, testing
Last Answer : (A) Definition, development, support
Description : Are we mortal for a good reason or is it just a shortcoming?
Last Answer : Bad thing it that after a while there’s nothing to be done. Not to mention that if not all are immortals then it would be a pain to see all your loved ones die then you start loving again then again they die and so on.
Description : What is one shortcoming of national wildlife refuges?
Last Answer : What is the answer ?
Description : The most important feature of spiral model is (A) requirement analysis. (B) risk management. (C) quality management. (D) configuration management.
Last Answer : (B) risk management.
Description : Feasibility analysis is the first stage in the process of project development. (True/False)
Last Answer : Ans. True
Description : Karen is studying the potential for selling her company's products in China. As part of her analysis, she is assessing the number, types and availability of wholesalers and retailers. Karen is ... C. Social and cultural norms D. Distribution structure E. Legal and political constraints
Last Answer : D. Distribution structure
Description : Project mission and objectives, procedures and systems used, and organization resources used typically appear in the _____ section of the final project report. A. Analysis B. Recommendation C. lessons learned D. financial feasibility
Last Answer : A. Analysis
Description : _____________ is primarily concerned with the identification, qualification and evaluation of the project resources. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.
Last Answer : B.Feasibility analysis.
Description : ____________ is primarily concerned with the identification of the project demand potential and the selection of the optimal technology. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.
Last Answer : A. Techno-economic analysis.
Description : Which statement best describes the Software as a Service cloud delivery model? A. A virtual machine provisioned and provided from the cloud which allows the customer to deploy custom ... and run the application on the customer's own computers and simplifying maintenance and support.
Last Answer : An application delivered to the client from the cloud which eliminates the need to install and run the application on the customer's own computers and simplifying maintenance and support.
Description : For the best model suitable for the project, in which of the phase the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing
Last Answer : b. System Analysis
Description : Based on the identification of objectives, input, output and file content, the vital document is called … A) System Definition B) System Document C) System Requirement Document D) System Subject
Last Answer : B) System Document
Description : The software ................. of a program or a computing system is the structure or structures of the system, which comprise software components, the externally visible properties of those components, and the relationships among them. (A) Design (B) Architecture (C) Process (D) Requirement
Last Answer : (B) Architecture
Description : Which of the following is correct statement? (A) Computers can be used for diagnosing the difficulty of a student in learning a subject (B) Psychological testing can be done with the help of computer provided a software is available (C) A set of instructions is called a programme (D) All the above
Last Answer : D
Description : Which one of the following is not a step of requirement engineering ? (A) Requirement elicitation (B) Requirement analysts (C) Requirement design (D) Requirement documentation
Last Answer : (C) Requirement design
Description : Requirement Development, Organizational Process Focus, Organizational Training, Risk Management and Integrated Supplier Management are process areas required to achieve maturity level (A) Performed (B) Managed (C) Defined (D) Optimized
Last Answer : (C) Defined
Description : An ideal sort is an in-place-sort whose additional space requirement is ............... (A) O(log2n) (B) O(nlog2n) (C) O(1) (D) O(n)
Last Answer : Answer: C
Description : What is Waterfall Model in Software?
Last Answer : WATERFALL MODEL It is a sequential design process in which progress is seen as flowing steadily downwards.(like waterfall) through the phases of conception,initiation,analysis,design,construction,testing,production/implementation and maintenance.
Description : The life cycle can be said to consist of a series of phases. The classical model is referred to as the waterfall model. Which phase may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation
Last Answer : (a) Requirements
Description : Project risk factor is considered in ? Spiral Model Waterfall Model Prototyping Model Iterative enhancement Model
Last Answer : Spiral Model
Description : Which is not a software life cycle model? Spiral Model Waterfall Model Prototyping Model Capability maturity Model
Last Answer : Capability maturity Model
Description : Which model is popular for students small projects ? Waterfall Model Spiral Model Quick and Fix model Prototyping Mode
Last Answer : Waterfall Model