Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey)
b) Techno-economic feasibility study (preliminary engineering survey)
c) Detailed survey and project report stage (final location survey)
d) All the above *

1 Answer

Answer :

d) All the above

Related questions

Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey

Last Answer : (c) Final location survey*

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : The first stage of deciding the alignment of a hill road, is (A) Reconnaissance (B) Detailed survey (C) Trace-out (D) Preliminary survey

Last Answer : Answer: Option A

Description : The purpose of reconnaissance survey (a) To determine technical fenibility of the line* (b) To assess whether such a line is required or not (c) To decide the final alignment of the railway line (d) None of the above

Last Answer : (a) To determine technical fenibility of the line*

Description : The project report of the reconnaissance survey should be accompanied by Index map area at a scale of 1 cm = ---- km. (a) 2.5 km* (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km

Last Answer : (a) 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by a map of the area at a scale of 1 cm= --- km. (a) 2.5 km (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km*

Last Answer : (e) 20.0 km*

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : Preliminary project report for a road project must contain (A) The detailed estimated cost based on detailed design (B) The several alternatives of the project that have been considered (C ... , traffic survey, concept design and approximate cost (D) The contract documents for inviting tenders

Last Answer : (C) The soil survey, traffic survey, concept design and approximate cost

Description : _____________ is primarily concerned with the identification, qualification and evaluation of the project resources. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.

Last Answer : B.Feasibility analysis.

Description : ____________ is primarily concerned with the identification of the project demand potential and the selection of the optimal technology. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.

Last Answer : A. Techno-economic analysis.

Description : The survey instrument used for reconnaissance survey (a) Theodelite & Dumpty level (b) Prismatic compass & Aneriod barometer* (c) All the above (d) None of them

Last Answer : (b) Prismatic compass & Aneriod barometer*

Description : Which of the instruments is not used in Reconnaissance survey. (a) Prismatic compass (b) Dumpy level * (c) Aneroid Barometer (d) Pedometer

Last Answer : (b) Dumpy level *

Description : While doing final location survey, the centre line is fully marked with pegs at --- metre distance (a) 10m (b) 20m* (c) 30m (d) 50m

Last Answer : (b) 20m*

Description : Which of the instruments is not used in Preliminary survey. (a) Theodelite (b) Tacheometer (c) Dumpy level (d) Plane table (e) None of them*

Last Answer : (e) None of them*

Description : The output of problem definition stage is …………….. A) Master Development Plan B) Terms of reference C) Feasibility report D) Final product

Last Answer : B) Terms of reference

Description : The process of preparing an inventory of skills needed for effective implementation of the project is called as ____________. A. Economic viability. B. Financial feasibility. C. Technical feasibility. D. Managerial competence.

Last Answer : D. Managerial competence.

Description : The index map of preliminary report should be to a scale of (a) 1 cm to 0.5 km (b) 1 cm to 1.0 km (c) 1 cm to 2.5 km* (d) 1 cm to 10.0 km

Last Answer : (c) 1 cm to 2.5 km*

Description : State True or False. 1. Term of reference is the final output of Feasibility Study 2. Design specification report is the final output of System Analysis A) 1-true, 2-true B) 1-false, 2-true C) 1-true, 2-false D) 1-false, 2-false

Last Answer : A) 1-true, 2-true

Description : Special inspection of distressed bridges Group II shall be carried out by Inspector (Concerned) is a) Once in three months* b) Once in two months c) Once in a month d) Once in six months

Last Answer : a) Once in three months*

Description : Special inspection of distressed bridges shall be carried out by Asst. Engineer is a) Once in three months b) Once in two months* c) Once in a month d) Once in six months

Last Answer : b) Once in two months*

Description : Project mission and objectives, procedures and systems used, and organization resources used typically appear in the _____ section of the final project report. A. Analysis B. Recommendation C. lessons learned D. financial feasibility

Last Answer : A. Analysis

Description : Pick up the correct statement from the following: (A) During reconnaissance, the general route of the alignment is selected (B) After reconnaissance, a trace is cut for the alignment (C) Last stage is the detailed surveys for desired geometries' of the highway (D) All the above

Last Answer : Answer: Option D

Description : The Key considerations involved in the feasibility analysis is / are ………………. A) Economic B) Technical C) Behavioral D) A, B, C

Last Answer : D) A, B, C

Description : Which of the following is not an aspect of appraisal of term loans by commercial banks? A. Financial feasibility. B. Technical feasibility. C. Economic feasibility. D. Societal feasibility.

Last Answer : D. Societal feasibility.

Description : _________________ implies the availability or otherwise of plant and machinery and technical know how to produce the product. A. Economic viability. B. Financial feasibility. C. Technical feasibility. D. Managerial competence

Last Answer : C. Technical feasibility.

Description : If the SSE/SE/JE/ Br. working in the section is not readily available, another SSE/SE/JE may be authorised by …………….. to witness payment on the section. a) DEN b) SSE/SE/JE/ c) AEN (Bridges)* d) Office clerk

Last Answer : c) AEN (Bridges)

Description : Corrosion in Steel girder bridges may be prevented by : a) Protective coatings by painting b) Metallising c) Use of epoxy based paints d) All the above*

Last Answer : d) All the above*

Description : The technical feasibility aspect of a project relates to the earning capacity of the project.  (True/False)

Last Answer : Ans. False

Description : Flood level gauge to be marked in a) All important bridges* b) All major bridges c) All minor & major bridges d) All bridges

Last Answer : a) All important bridges*

Description : Pick up the correct statement from the following: (A) Detailed survey is carried out for a strip of land about 30 m at sharp curves (B) Levels are taken along the trace cut at an interval of 20 m (C) Contour interval is generally adopted at 2 metres vertical interval (D) All the above

Last Answer : Answer: Option D

Description : The main ingredient of the report documenting the ……………… is the cost benefit analysis. A) System Analysis B) Feasibility Study C) System Analyst D) System Design

Last Answer : B) Feasibility Study

Description : ……….. includes review of the existing procedures and information flow. A) Feasibility Study B) Feasibility report C) System Design D) System analysis

Last Answer : A) Feasibility Study

Description : The stage in problem solving that includes the preparation of suitable hypothesis for investigation. (a) Survey (b) Planning for action (c) Problem description (d) Discussion

Last Answer : (b) Planning for action

Description : Feasibility analysis is the first stage in the process of project development. (True/False)

Last Answer : Ans. True

Description : Economic feasibility study of membrane separation process for sea water desalination

Last Answer : Reverse osmosis (RO) membranes are the leading technology for desalination of sea water because of their strong separation capabilities and exhibiting a great potential for treatment of waters worldwide A ... devices play vital role in cost-effective production of fresh water by RO desalination.

Description : Economic feasibility study of membrane based separation process

Last Answer : Economic feasibility study of membrane based separation process : Membrane distillation (MD) is an emerging technology for brackish water desalination. MD is a thermal, vapor-driven transportation process ... as renewable solar heat or waste heat, product quality, and higher resistance to fouling.

Description : Selection of the routes, of highways depends upon (A) Feasibility of attaining ruling gradient (B) Avoidance of cutting hard rocks (C) Minimum number of bridges (D) All the above

Last Answer : Answer: Option D

Description : A report made by a police officer in a case which discloses a commission of a non  cognizable offence after investigation shall deemed to be (a) Police report (b) Charge sheet  (c) Complaint (d) Final report

Last Answer : (c) Complaint

Description : The date of painting of steel work should be painted in white on the out side of the left girder a) of the 1st span only b) first span only but on all spans for Imp. Bridges* c) of the all spans d) None of the above

Last Answer : b) first span only but on all spans for Imp. Bridges*

Description : In the ____ stage, of project identification the project ideas generated above are  screened and a preliminary exercise is conducted to weed out the bad or unviable ideas.

Last Answer : Ans. Screening

Description : Greasing of bearings of Steel girder bridges is done once in years.

Last Answer : Three

Description : bridge foundation having less then 2M depth below bed level in case of arch bridges and 1.2M depth below bed level in case of other bridges is termed as

Last Answer : …Shallow foundation..

Description : What is the clear distance between two consecutive steel channel sleepers on Girder bridges? (a) 450 mm* (b) 510 mm (c) 500 mm (d) 460 mm

Last Answer : (a) 450 mm*

Description : The total number of bridges on I.R.is about a)1 Lac b)1.25 Lacs* c)1.50 Lacs d)2 Lacs

Last Answer : b)1.25 Lacs*

Description : Spacing of Trolley refuges a) Every 100m b) If span is more than 100m, on each pier c) Ballasted deck bridges – every 50m d) All the above*

Last Answer : d) All the above*

Description : Renewal of slack rivets should be taken up in steel girder bridges: a) All rivets which are hand loose or which have lost 50% of their head by corrosion. b) All hammer loose rivets where corrosion has set ... . c) In end stiffeners when the percentage of hammer loose rivets is >30% d) All the above*

Last Answer : d) All the above*

Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm

Last Answer : b) 600 mm*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : Clear distance between consecutive sleepers not to exceed on bridges in BG is a) 450 mm* b) 600 mm c) 510 mm d) 500 mm

Last Answer : a) 450 mm*